File #: 081588    Version:
Type: Resolution Status: Passed
File created: 3/25/2009 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 4/14/2009
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $1,105,000 for a total estimated cost of these projects being $17,476,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Cover Letter, 2. Fiscal note, 3. Hearing Notice List
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
4/23/20091 MAYOR SIGNED   Action details Meeting details Not available
4/14/20091 COMMON COUNCIL ADOPTEDPass14:0 Action details Meeting details Not available
4/1/20090 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Individual present: Clark Wantoch, Dept. of Public Works, Infrastructure Services
Pass5:0 Action details Meeting details Not available
3/30/20090 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
3/30/20090 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
3/27/20091 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
3/25/20090 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

081588

Version

SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $1,105,000 for a total estimated cost of these projects being $17,476,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $1,105,000 with the total cost estimated to be $17,476,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

1st Aldermanic District

 

W. Congress St. - N. 17th St. to N. 18th St. (SM495090025): Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $67,000.  This project is anticipated to be completed during the 2010 construction season.

 

W. Cornell St. - N. 22nd St. to N. 23rd St. (SM495090036): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $67,000.  This project is anticipated to be completed during the 2009 construction season.

 

W. Eggert Pl. - N. 31st St. to N. Teutonia Ave. (SM495090027): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2009 construction season.

 

Area bounded by W. Hampton Ave., W. Olive St., N. 17th St., and N. 24th Pl. (SM495090022): Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $1,430,000.  This project is anticipated to be completed during the 2010 construction season.

 

W. Hampton Ave. - N. 20th St. to N. 24th Pl. (SM495090040): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $306,000.  This project is anticipated to be completed during the 2010 construction season.

 

W. Kinzie St. - N. 31st St. to N. Teutonia Ave. (SM495090026): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $56,000.  This project is anticipated to be completed during the 2009 construction season.

 

W. Lawn Ave. - N. 24th St. to 100 feet east of N. 25th St. (WT410101002): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $110,000.  This project is anticipated to be completed during the 2010 construction season.

 

W. Roosevelt Dr. - N. 21st St. to W. Congress St. (SM495090035): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $41,000.  This project is anticipated to be completed during the 2009 construction season.

 

W. Ruby Ave. - N. 23rd St. to N. 24th St. (SM495090038): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $53,000.  This project is anticipated to be completed during the 2010 construction season.

 

W. Sheridan Ave. - 150 feet m/l west of N. 37th St. to N. 37th St. (SM495090029): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $44,000.  This project is anticipated to be completed during the 2009 construction season.

 

Area bounded by W. Silver Spring Dr., Lincoln Creek, N. 27th St., and N. 41st St. (SM495090024): Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $2,424,000.  This project is anticipated to be completed during the 2010 construction season.

 

N. Teutonia Ave. - Lincoln Creek to W. Eggert Pl. (SM495090031): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $39,000.  This project is anticipated to be completed during the 2009 construction season.

 

W. Villard Ave. - N. 31st St. to N. Teutonia Ave. (SM495090030): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $74,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 13th St. - 50 feet north of W. Birch Ct. to W. Silver Spring Dr. (WT410101031): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2010 construction season.

 

N. 18th St. - 270 feet m/l north of W. Olive St. to W. Congress St. (SM495090042): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 19th Pl. - W. Olive St. to W. Congress St. (SM495090032): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 19th St. - W. Olive St. to W. Congress St. (SM495090033): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 21st St. - W. Roosevelt Dr. to W. Cornell St. (SM495090034): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $190,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 22nd St. - W. Congress St. to W. Cornell St. (SM495090039): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $215,000.  This project is anticipated to be completed during the 2010 construction season.

 

N. 23rd St. - W. Ruby Ave. to W. Cornell St. (SM495090037): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $140,000.  This project is anticipated to be completed during the 2010 construction season.

 

N. 25th St. - 100 feet south of W. Rohr Ave. to W. Rohr Ave. (WT410101001): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $30,000.  This project is anticipated to be completed during the 2010 construction season.

 

N. 38th St. - W. Sheridan Ave. to 325 feet m/l south of W. Sheridan Ave. (SM495090028): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $79,000.  This project is anticipated to be completed during the 2009 construction season.

 

2nd Aldermanic District

 

W. Baldwin St. - W. Fond du Lac Ave. to W. Medford Ave. (WT410101008): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2010 construction season.

 

W. Capitol Dr. - N. 60th St. to N. 64th St. (WT410100010): Relaying water main. (Nonassessable Water Fund -- $25,000).  The total estimated cost for this project including the requested amount is $300,000.  This project is anticipated to be completed during the 2010 construction season.

 

W. Fond du Lac Ave. (southwest) - W. Constance Ave. to W. Hampton Ave. (WT410101011): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2010 construction season.

 

W. Grantosa Dr. (north side) - N. 77th St. to W. Gertrude Dr. (WT410101030): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2010 construction season.

 

W. Hampton Ave. - W. Fond du Lac Ave. to N. 68th St. (WT410101012): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2010 construction season.

 

W. Luscher Ave. - N. 77th St. to N. Evans St. (WT410101029): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $140,000.  This project is anticipated to be completed during the 2010 construction season.

 

W. Medford Ave. - N. 64th St. to N. 68th St. (WT410101010): Relaying water main. (Nonassessable Water Fund -- $30,000).  The total estimated cost for this project including the requested amount is $390,000.  This project is anticipated to be completed during the 2010 construction season.

 

N. 64th St. - W. Congress St. to W. Ruby Ave. (WT410101009): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2010 construction season.

 

N. 65th St. - W. Villard Ave. to W. Lawn Ave. (WT410101020): Relaying water main. (Nonassessable Water Fund -- $20,000).  The total estimated cost for this project including the requested amount is $240,000.  This project is anticipated to be completed during the 2010 construction season.

 

3rd Aldermanic District

 

N. Prospect Ave. - E. Woodstock Pl. to E. Kenilworth Pl. (SM495090018): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $153,000.  This project is anticipated to be completed during the 2009 construction season.

 

Alley between N. Bartlett Ave., E. North Ave., N. Oakland Ave. and E. Thomas Ave. (SM495090016): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $142,000.  This project is anticipated to be completed during the 2010 construction season.

 

5th Aldermanic District

 

W. Marion St. - N. 91st St. to N. 92nd St. (WT410100002): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2010 construction season.

 

Area bounded by W. Melvina St., W. Auer Ave., N. 83rd St., and N. Argonne Dr. (SM495090021): Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $2,908,000.  This project is anticipated to be completed during the 2010 construction season.

 

N. 91st St. - W. Capitol Dr. to W. Marion St. (WT410100001): Relaying water main. (Nonassessable Water Fund -- $30,000).  The total estimated cost for this project including the requested amount is $400,000.  This project is anticipated to be completed during the 2010 construction season.

 

6th Aldermanic District

 

W. Reservoir Ave. at N. 5th St. (WT410101032): Install Hydrant.  (Nonassessable Water Fund -- $10,000).  The total estimated cost for this project including the requested amount is $15,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 2nd St. - 200 feet south of W. Reservoir Ave. to W. Reservoir Ave. (WT410101003): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2010 construction season.

 

7th Aldermanic District

 

Area bounded by W. Congress St., W. Glendale Ave., N. Sherman Blvd., and N. 38th St. (SM495090023): Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $1,453,000.  This project is anticipated to be completed during the 2010 construction season.

 

8th Aldermanic District

 

W. Branting Ln.  - S. 32nd St. to S. 33rd St. (WT410101022): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2010 construction season.

 

9th Aldermanic District

 

W. Custer Ave. - N. 44th St. to N. 45th St. (WT410101013): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2010 construction season.

 

10th Aldermanic District

 

W. Capitol Dr. - W. Appleton Ave. to N. 77th St. (WT410100011): Relaying water main. (Nonassessable Water Fund -- $20,000).  The total estimated cost for this project including the requested amount is $230,000.  This project is anticipated to be completed during the 2010 construction season.

 

W. Dixon St. - S. 64th St. to S. 67th St. (SM495090020): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $174,000.  This project is anticipated to be completed during the 2010 construction season.

 

S. 64th St. - W. Fairview Ave. to W. Adler St. (SM495090019): Relaying sanitary and storm sewers. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $231,000.  This project is anticipated to be completed during the 2010 construction season.

 

N. 91st St. - W. Park Hill Ave. to W. St. Paul Ave. (WT410100003): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2010 construction season.

 

11th Aldermanic District

 

W. Beloit Rd. - W. Oklahoma Ave. to S. 92nd St. (WT410100007): Water main extension. (Nonassessable Water Fund -- $40,000).  The total estimated cost for this project including the requested amount is $550,000.  This project is anticipated to be completed during the 2010 construction season.

 

W. Crawford Ave. - S. 88th St. to S. 89th St. (WT410100005): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2010 construction season.

 

Area bounded by W. Howard Ave., W. Beloit Rd., S. 88th St., and S. 97th St. (SM495090041): Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $753,000.  This project is anticipated to be completed during the 2009 construction season.

 

W. Wick Pl. - S. 67th St. to S. 68th St. (WT410101027): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2010 construction season.

 

S. 62nd St. - W. Harrison Ave. to S. 63rd St. (WT410101026): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $120,000.  This project is anticipated to be completed during the 2010 construction season.

 

S. 66th St. - 130 feet south of W. Arthur Ave. to W. Cleveland Ave. (WT410101025): Relaying water main. (Nonassessable Water Fund -- $20,000).  The total estimated cost for this project including the requested amount is $240,000.  This project is anticipated to be completed during the 2010 construction season.

 

12th Aldermanic District

 

S. Cesar E. Chavez Dr. - W. Mineral St. to W. Scott St. (SM495090017): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $142,000.  This project is anticipated to be completed during the 2009 construction season.

 

W. Maple St. - S. 6th St. to S. 13th St. (WT410100012): Abandoning water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2010 construction season.

 

S. 14th St. - W. Burnham St. to W. Becher St. (WT410101028): Relaying water main. (Nonassessable Water Fund -- $20,000).  The total estimated cost for this project including the requested amount is $260,000.  This project is anticipated to be completed during the 2010 construction season.

 

13th Aldermanic District

 

W. Alvina Ave. - S. 20th St. to S. 26th St. (WT410101024): Relaying water main. (Nonassessable Water Fund -- $30,000).  The total estimated cost for this project including the requested amount is $440,000.  This project is anticipated to be completed during the 2010 construction season.

 

W. Henry Ave. - S. 21st St. to S. 22nd St. (WT410101023): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $135,000.  This project is anticipated to be completed during the 2010 construction season.

 

S. 58th St. - W. Forest Home Ave. (south lane) to 300 feet south of W. Forest Home Ave. (WT410101423): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $65,000.  This project is anticipated to be completed during the 2010 construction season.

 

14th Aldermanic District

 

S. Clement Ave. - E. Otjen St. to E. Potter Ave. (WT410101006): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2010 construction season.

 

S. Logan Ave. - 60 feet north of E. Homer St. to E. Otjen St. (WT410101007): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2010 construction season.

 

15th Aldermanic District

 

N. 41st St. - W. Garfield Ave. to W. North Ave. (WT410101016): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2010 construction season.

 

N. 42nd St. - W. Spaulding Pl. to W. Garfield Ave. (WT410101015): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $65,000.  This project is anticipated to be completed during the 2010 construction season.

 

City of Greenfield

 

W. Leroy Ave. - S. 61st St. to S. 64th St. (WT410101018): Relaying water main. (Nonassessable Water Fund -- $20,000).  The total estimated cost for this project including the requested amount is $225,000.  This project is anticipated to be completed during the 2010 construction season.

 

W. Marcy Ln. - S. Honey Creek Dr. to S. 63rd St. (WT410101017): Relaying water main. (Nonassessable Water Fund -- $20,000).  The total estimated cost for this project including the requested amount is $175,000.  This project is anticipated to be completed during the 2010 construction season.

 

S. 63rd St. - W. Plainfield Ave. to W. Marcy Ln. (WT410101019): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2010 construction season.

 

St. Francis

 

S. Ahmedi Ave. - E. Elizabeth Ave. to E. Tripoli Ave. (WT410101005): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2010 construction season.

 

E. Cora Ave. - S. Kansas Ave. to S. Ahmedi Ave. (WT410101004): Relaying water main.  (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2010 construction season.

 

S. Vermont Ave. - E. Armour Ave. to E. Cudahy Ave. (WT410101021): Relaying water main. (Nonassessable Water Fund -- $15,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2010 construction season.

 

; and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

MLD:dr

Npr 10

03/27/09