File #: 141514    Version:
Type: Resolution Status: Passed
File created: 1/21/2015 In control: COMMON COUNCIL
On agenda: Final action: 2/10/2015
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $2,165,000 for a total estimated cost of these projects being $20,455,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Number
141514
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $2,165,000 for a total estimated cost of these projects being $20,455,000.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $2,165,000 with the total cost estimated to be $20,455,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:
 
2nd Aldermanic District
 
W. Custer Ave. - N. 87th St. to N. 91st St. (WT410160624):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $295,000.  This project is anticipated to be completed during the 2016 construction season.
 
N. 80th St. - W. Thurston Ave. to W. Carmen Ave. (WT410160620):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2016 construction season.
 
N. 84th St. - W. Carmen Ave. to W. Bobolink Ave. - (WT410160621):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2016 construction season.
 
4th Aldermanic District
 
Michigan Street Bridge (100W) over the Milwaukee River (BR100150104):  Preliminary in-house and consultant engineering for movable bridge rehabilitation including structural, mechanical, and electrical.  (City Share Non-assessable Structure Fund -- $1,200,000).  The total estimated cost for this project including the requested amount is $10,700,000.  This project is anticipated to be completed during the 2017 construction season.
 
E. Michigan St. - N. Cass St. to 210 feet east of N. Cass St. (WT410150696):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2015 construction season.
 
W. Richardson Pl. - N. 28th St. to N. 29th St. (WT410160617):  Relaying water main.  (Nonassessable Sewer Maintenance Relay Fund -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2016 construction season.
 
N. 33rd St. - W. Wells St. to 250 feet m/l north of W. Wells St. (SM495150003):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $53,000.  This project is anticipated to be completed during the 2015 construction season.
 
5th Aldermanic District
 
W. Concordia Ave. - N. 88th St. to N. 89th St. (WT410160600):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2016 construction season.
 
W. Hadley St. - N. 88th St. to N. 89th St. (WT410160610):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2016 construction season.
 
W. Hadley St. - N. 91st St. to N. 92nd St. (WT410160611):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2016 construction season.
 
N. 86th St. - W. Hadley St. to W. Locust St. (WT410160613):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2016 construction season.
 
N. 88th St. - W. Center St. to W. Hadley St. (WT410160612):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2016 construction season.
 
N. 90th St. - W. Auer Ave. to W. Concordia Ave. (WT410160602):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $10,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2016 construction season.
 
N. 92nd St. - W. Auer Ave. to W. Concordia Ave. (WT410160601):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2016 construction season.
 
5th and 10th Aldermanic Districts
 
Area bounded by W. Center St., W. Vienna Ave., N. 59th St., and N. Argonne Dr. (SM494150202):  Sanitary Sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $30,000).  The total estimated cost for this project including the requested amount is $2,866,000.  This project is anticipated to be completed during the 2015 construction season.
 
6th Aldermanic District
 
W. Atkinson Ave. - N. 12th St. to N. 13th St. (WT410160609):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $95,000.  This project is anticipated to be completed during the 2016 construction season.
 
N. Holton St. - E. Meinecke Ave. to E. Wright St. (SM495150005):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $129,000.  This project is anticipated to be completed during the 2015 construction season.
 
7th Aldermanic District
 
W. Capitol Dr. (Southside) - N. 29th St. to N. 30th St. (WT410160607):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2016 construction season.
 
W. Maxwell Pl. - N. 52nd St. to W. Fond du Lac Ave. (WT410160605):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2016 construction season.
 
W. Melvina Pl. - N. 30th St. to N. Hopkins St. (WT410160606):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $45,000.  This project is anticipated to be completed during the 2016 construction season.
 
N. 30th St. - W. Melvina Pl. to W. Capitol Dr. (WT410160608):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2016 construction season.
 
N. 38th St. - W. Glendale Ave. to W. Courtland Ave. (WT410160619):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2016 construction season.
 
N. 42nd St. - W. Glendale Ave. to W. Peck Pl. (WT410160618):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2016 construction season.
 
10th and 15th Aldermanic Districts
 
W. Vliet St. - N. 45th St. to N. 49th St. (SM495150004):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $283,000.  This project is anticipated to be completed during the 2015 construction season.
 
11th Aldermanic District
 
Area bounded by W. Cleveland Ave., W. Arthur Ave., S. 67th St, and S. 71st St. (SM494150201):  Sanitary Sewer lining.  (Infiltration/Inflow Reduction Fund -- $20,000).  The total estimated cost for this project including the requested amount is $309,000.  This project is anticipated to be completed during the 2015 construction season.
 
W. Dodge Pl. - 70 feet southeast of W. Wilbur Ave. to 570 feet southeast of W. Wilbur Ave. (WT410160623):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2016 construction season.
 
W. Kinnickinnic River Pkwy. - S. 29th St. to 340 feet m/l east of S. 29th St. (SM495150007):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2015 construction season.
 
W. Ohio Ave. - S. 76th St. to S. 80th St. (WT410160627):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $12,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $315,000.  This project is anticipated to be completed during the 2016 construction season.
 
W. River Bend Dr. - W. Ohio Ave. to W. Verona Ct. (WT410160603):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $140,000.  This project is anticipated to be completed during the 2016 construction season.
 
W. Verona Ct. - S. 77th St. to S. 79th St. (WT410160626):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2016 construction season.
 
W. Warnimont Ct. - S. 68th St. to 160 feet west of S. 68th St. (WT410160622):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2016 construction season.
 
S. 77th St. - 500 feet north of W. Burdick Ave. to W. Morgan Ave. (WT410160625):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $17,000; Nonassessable Water Fund Budget Line 6410 -- $18,000).  The total estimated cost for this project including the requested amount is $550,000.  This project is anticipated to be completed during the 2016 construction season.
 
13th Aldermanic District
 
W. Euclid Ave. - S. 22nd St. to S. 23rd St. (WT410160616):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2016 construction season.
 
S. Pine St. - E. Layton Ave. to 150 feet m/l north of E. Layton Ave. (SM495150002):  Storm relocation.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $71,000.  This project is anticipated to be completed during the 2015 construction season.
 
W. Whitaker Ave. - S. 20th St. to S. Louisiana Ave. (WT410160604):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $175,000.  This project is anticipated to be completed during the 2016 construction season.
 
S. 25th St. - W. Holt Ave. to W. Morgan Ave. (WT410160614):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $180,000.  This project is anticipated to be completed during the 2016 construction season.
 
S. 26th St. - W. Ohio Ave. to W. Holt Ave. (WT410160615):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $170,000.  This project is anticipated to be completed during the 2016 construction season.
 
14th Aldermanic District
 
S. Austin St. - E. Warnimont Ave. to E. Morgan Ave. (SM495150006):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $139,000.  This project is anticipated to be completed during the 2015 construction season.
 
S. 4th St. - W. Becher St. to S. Chase Ave. (SM495130070):  Combined large diameter sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000, Additional Funds).  The total estimated cost for this project including the requested amount is $500,000.  This project is anticipated to be completed during the 2015 construction season.
 
15th Aldermanic District
 
N. 38th St. - W. North Ave. to W. Wright St. (WT410160628):  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $12,000; Nonassessable Water Fund Budget Line 6410 -- $13,000).  The total estimated cost for this project including the requested amount is $330,000.  This project is anticipated to be completed during the 2016 construction season.
 
City Wide
 
Water Alterations - Developer Funded (WT430153300):  Water main alteration.  (Nonassessable Water Fund Budget Line 5010 -- $25,000; Nonassessable Water Fund Budget Line 6410 -- $25,000).  The total estimated cost for this project is $50,000.  This project is anticipated to be completed during the 2015 construction season.
 
Work by Milwaukee Water Works prior to paving (WT410150730):  Water main alteration.  (Nonassessable Water Fund Budget Line 5010 -- $0; Nonassessable Water Fund Budget Line 6410 -- $15,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2015 construction season.
 
Work done by Contractor-Paving (WT410150750):  Water main alteration.  (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2015 construction season.
 
Work done by Contractor-Sewer Alterations (WT410150770):  Water main alteration.  (Nonassessable Water Fund Budget Line 5010 -- $4,000; Nonassessable Water Fund Budget Line 6410 -- $5,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2015 construction season.
 
Suburban Plan Reviews (WT410150800):  Plan review.  (Nonassessable Water Fund Budget Line 5010 -- $30,000; Nonassessable Water Fund Budget Line 6410 -- $20,000).  The total estimated cost for this project is $50,000.  This project is anticipated to be completed during the 2015 construction season.
 
Post guarantee work on water mains (WT410150850):  Inspection.  (Nonassessable Water Fund Budget Line 5010 -- $5,000; Nonassessable Water Fund Budget Line 6410 -- $0).  The total estimated cost for this project is $5,000.  This project is anticipated to be completed during the 2015 construction season.
 
Material inspection at various locations (WT410150880):  Inspection.  (Nonassessable Water Fund Budget Line 5010 -- $0; Nonassessable Water Fund Budget Line 6410 -- $15,000).  The total estimated cost for this project is $15,000.  This project is anticipated to be completed during the 2015 construction season.
 
Various Aldermanic Districts
 
Bridge Safety Inspection (BR100150102):  Federal and State mandated safety inspection of in-service bridges.  (City Share Non-assessable Structure Fund -- $150,000).  The total estimated cost for this project $150,000.  This project is anticipated to be completed during the 2015 construction season.
 
Movable Bridge Upgrades (BR100150103):  Movable Bridge mechanical, hydraulic and electrical upgrades.  (City Share Non-assessable Structure Fund -- $10,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2015 construction season.
 
;and, be it
 
Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it
 
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
 
Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
 
Requestor
Infrastructure Services Division
Drafter
Mary Dziewiontkoski/Denise Reinholtz
Npr 7
01/23/2015
 
Technical correction made on 2/23/15 by LME -- changed a "0" to a "3" for a citywide account number (Water Alterations - Developer Fund)