File #: 171708    Version:
Type: Resolution Status: Passed
File created: 2/27/2018 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 3/27/2018
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $4,691,980 for a total estimated cost of $4,926,300.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. Cover Letter, 2. Official notice 93.pdf, 3. petition, 4. N Teutonia certification.pdf, 5. Notice Published on 4-13-18
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
4/13/20181 CITY CLERK PUBLISHED   Action details Meeting details Not available
4/4/20181 MAYOR SIGNED   Action details Meeting details Not available
3/27/20181 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Video Video
3/7/20180 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 1st Aldermanic District Alley between W. Fairmont Ave., W. Villard Ave., N. 51st Blvd., and N. 53rd St. (North - South Leg) (ST212140103) Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary. Ald. Borkowski moved approval. (Prevailed 4-0) N. Teutonia Ave. - W. Good Hope Rd. to W. Bradley Rd. (Portions in the Village of Brown Deer) (ST211180121) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (6’ width of tree border area), and grading. Ald. Kovac moved approval. (Prevailed 4-0) W. Oriole Dr. -- N. 27th St. to N. Teutonia Ave. (ST211170151) Install traffic calming speed hump(s). Ald. Donovan moved approval. (Prevailed 4-0) N. 24th Pl. -- W. Hope Ave. to W. Atkinson Ave. (ST211170154) Install traffic calming speed hump(s). Walter Bankhead Jr 4227 N 24th Pl stated he does not want the speed hump in front of his house because of his driveway, and there should be two in the 4100 block. Ald. Kovac moved approval. (Prevailed 4-0) 3rd Aldermanic District Alley between N. Humboldt Ave., E. Meineke Ave., N. Weil St. and E. Wright St. (ST212160105) Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary. Ald. Kovac moved approval. (Prevailed 4-0) 4th Aldermanic District N. 34th St. -- W. St. Paul Ave. to W. Clybourn St. (ST211180162) Install traffic calming speed hump(s). Sherrie Tussler 3402 W St Paul Ave stated she is in support. Ald. Donovan moved approval. (Prevailed 4-0) 5th Aldermanic District Alley between W. Burleigh St., W. Chambers St., N. 90th St., and N. 91st St. (ST212020130) Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary. Ald. Bohl stated he is in support. Ald. Borkowski moved approval. (Prevailed 4-0) Alley between W. Concordia Ave., W. Townsend St., N. 91st St., and N. 92nd St. (South Half) (ST212050120) Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary. Ald. Bohl stated neighbors present were in support. Ald. Donovan moved approval. (Prevailed 4-0) 8th Aldermanic District Alley between W. Arthur Ave., W. Hayes Ave., S. 33rd St., and S. 34th St. (ST21210127) Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary. Ald. Donovan moved to hold the project. (Prevailed 4-0) S. 29th St - W. Hayes Ave. to W. Lincoln Ave. (ST211180167) Install traffic calming speed hump(s). Ald. Donovan moved approval. (Prevailed 4-0) 9th Aldermanic District N. Joseph Ave. - W. Tower Ave. to N. Pingree Ave. (ST211180173) Install traffic calming speed hump(s). Bill Pietsch 8159 N Joseph Ave stated he is opposed and provided a petition from residents. Ald. Kovac moved to enter the petition into the record. (Prevailed 4-0) Ald. Kovac moved to delete the project. (Prevailed 4-0) 11th Aldermanic District Alley between W. Morgan Ave., W. Warnimont Ave., S. 83rd St., and S. 84th St. (ST212160111) Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary. Ald. Borkowski moved approval. (Prevailed 4-0) 12th Aldermanic District Alley between W. Cleveland Ave., S. 15th Pl., S. 16th St., and the Kinnickinnic River (ST212180107) Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary. Ald. Kovac moved approval. (Prevailed 4-0) Alley between W. Hayes Ave., W. Lincoln Ave., S. 7th St., and S. 8th St. (ST212160109) Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary. Ald. Donovan moved approval. (Prevailed 4-0) 13th Aldermanic District Alley between W. Crawford Ave., W. Wilbur Ave., S. 14th St., and S. 15th St. (ST212070108) Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary. Ald. Kovac moved approval. (Prevailed 4-0) S. Quincy Ave. -- E. Layton Ave. to E. Bolivar Ave. (ST211180166) Install traffic calming speed hump(s). Ald. Borkowski moved to delete. (Prevailed 4-0) Ald. Donovan moved approval as amended. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
2/27/20180 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

 

Number

171708

Version

SUBSTITUTE 1

Reference

120112

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $4,691,980 for a total estimated cost of $4,926,300.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $4,691,980.  The total estimated cost of these projects is $4,926,300.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

1st Aldermanic District

 

Alley between W. Fairmount Ave., W. Villard Ave., N. 51st Blvd., and N. 53rd St. (North - South Leg)  (ST212140103) File Number 120112: Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary.  (Assessable Alley Paving Fund -- $35,000; Nonassessable Alley Paving Fund -- $140,000). The total estimated cost for this project including the requested amount is $275,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. Teutonia Ave. - W. Good Hope Rd. to W. Bradley Rd. (Portions in the Village of Brown Deer) (ST320-XX-XXXX)  File Number 171656:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (6’ width of tree border area), and grading. (Milwaukee County is lead agency)

 

Grantor Non-Reimbursable Paving Fund - $3,390,165.87

City Share Nonassessable Paving Fund -- $336,014.13

City Share Assessable Paving Fund -- $ 54,500.00

 

These funds are to be transferred to the construction account (ST320-XX-XXXX).

 

Previously authorized for City Share Nonassessable Sewer Fund:   $15,295.00

Previously authorized for City Share Nonassessable Water Fund :   $4,025.00

 

 

Previously authorized for project construction:  $0.

The current total estimated cost for this project including this resolution:  $3,800,000.00. 

The original estimated cost of the project (Resolution 171656):  $3,800,000.00.

 

This project is anticipated to be completed during the 2018 construction season.

 

W. Oriole Dr. -- N. 27th St. to N. Teutonia Ave. (ST211170151) Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $15,600; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $17,600.  This project is anticipated to be completed during the 2018 construction season.

 

N.  24th Pl. --  W. Hope Ave. to W. Atkinson Ave.  (ST211170154)  Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $7,400; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $9,400.  This project is anticipated to be completed during the 2018 construction season.

 

3rd Aldermanic District

 

Alley between N. Humboldt Ave., E. Meinecke Ave.,  N. Weil St. and E. Wright St.  (ST212160105)  File Number 141118: Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities as necessary.  (Assessable Alley Paving Fund -- $38,000; Nonassessable Alley Paving Fund -- $72,000).  The total estimated cost for this project including the requested amount is $110,000.  This project is anticipated to be completed during the 2018 construction season.

 

4th Aldermanic District

 

N. 34th St. -- W. St. Paul Ave. to W. Clybourn St.  (ST211180162)  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $3,200; Nonassessable Reconstruction Paving Fund -- $2,800).  The total estimated cost for this project including the requested amount is $6,000.  This project is anticipated to be completed during the 2018 construction season.

 

5th Aldermanic District

 

Alley between W. Burleigh St., W. Chambers St., N. 90th St., and N. 91st St. (ST212020130)  File Number 100142: Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary. (Assessable Alley Paving Fund -- $40,000; Nonassessable Alley Paving Fund -- $70,000).  The total estimated cost for this project including the requested amount is $225,000.  This project is anticipated to be completed during the 2018 construction season.

 

Alley between W. Concordia Ave., W. Townsend St., N. 91st St., and N. 92nd St. (South Half) (ST212050120)  File Number 031434: Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary.  (Assessable Alley Paving Fund -- $25,000; Nonassessable Alley Paving Fund -- $50,000). The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2018 construction season.

 

8th Aldermanic District

 

S. 29th St - W. Hayes Ave. to W. Lincoln Ave. (ST211180167)  Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $6,300; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $8,300.  This project is anticipated to be completed during the 2018 construction season.

 

11th Aldermanic District

 

Alley between W. Morgan Ave., W. Warnimont Ave., S. 83rd St., and S. 84th St.

(ST212160111) File Number 141512: Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary.  (Assessable Alley Paving Fund -- $15,000; Nonassessable Alley Paving Fund -- $45,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2018 construction season.

 

12th Aldermanic District

 

Alley between W. Cleveland Ave., S. 15th Pl., S. 16th St., and the Kinnickinnic River (ST212180107) File Number 171094:  Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary.  (Assessable Alley Paving Fund -- $25,000; Nonassessable Alley Paving Fund -- $60,000). The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2018 construction season.

 

Alley between W. Hayes Ave., W. Lincoln Ave., S. 7th St., and S. 8th St. (ST212160109) File Number 141118: Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary.  (Assessable Alley Paving Fund -- $43,000; Nonassessable Alley Paving Fund -- $117,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2018 construction season.

 

13th Aldermanic District

 

Alley between W. Crawford Ave., W. Wilbur Ave., S. 14th St., and S. 15th St. (ST212070108)  File Number 080004: Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary.  (Assessable Alley Paving Fund -- $48,000; Nonassessable Alley Paving Fund -- $47,000).  The total estimated cost for this project including the requested amount is $95,000.  This project is anticipated to be completed during the 2018 construction season.

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That projects W. Fairmont Ave. (ST212140103); W. Oriole Dr. (ST211170151); N. 24th Pl. (ST211170154);  N. Humboldt Ave. (ST212160105);  N. 34th St. (ST211180162);  W. Burleigh St. (ST212020130); W. Concordia Ave. (ST212050120);  S. 29th St. (ST211180167);  W. Morgan Ave. (ST212160111);  W. Cleveland Ave.(ST212180107);  W. Hayes Ave. (ST212160109);  W. Crawford Ave.  (ST212070108) will be billed after January 1, 2020, but not before 12 months after the project contract has been completed; and, be it

 

Further Resolved, That the following projects be deleted from the 2018 Paving Program:

N. Joseph Ave. - W. Tower Ave. to N. Pingree Ave.  (ST211180173).                     

S. Quincy Ave. - E. Layton Ave. to E. Bolivar Ave.  (ST211180166).

 

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/Dee  La Belle

Afr 9

03/07/2018