Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations.
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS, PUBLIC IMPROVEMENTS, SIDEWALKS, SPECIAL ASSESSMENTS, STREET IMPROVEMENTS, TREES, WATER MAINS
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
5/14/19982 MAYOR SIGNED   Action details Meeting details Not available
5/5/19982 COMMON COUNCIL ADOPTED

Minutes note: ALD. WITKOWIAK presented a substitute resolution to replace the resolution originally recommended for adoption by the Public Improvements Committee and moved for its acceptance. The motion prevailed. ALD. WITKOWIAK's motion prevailed and the foregoing substitute resolution, as substituted was adopted.
Pass13:0 Action details Meeting details Not available
5/4/19982 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
4/22/19981 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTIONPass4:0 Action details Meeting details Not available
4/7/19980 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
NUMB:
971960
VERS:
SUBSTITUTE 2
REF:
892058
XXBY:
THE CHAIR
TITL:
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations.
ANLS:
-Analysis-
 
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.
BODY:
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:
 
1st Aldermanic District
 
W. Purdue St. - N. 19th Pl. to N. 20th St. (871-0704-3) File Number 892058: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, sodding, and grading. (Nonassessable Reconstruction Paving Fund 31-523---211-0001 -- $71,955; Assessable Reconstruction Paving Fund 71-523---211-0001 -- $8,250)
 
Alley between W. Fairmount Ave., W. Villard Ave., N. 20th St. and N. 21st St. (Southerly half of north- south leg) (888-0753-8) File Number 970181: Concrete alley pavement reconstruction, replace some abutting sidewalk and driveway approaches, grading, and storm water drainage facilities where needed. (Nonassessable Alley Paving Fund 31-523---212-0001 -- $39,320; Assessable Alley Paving Fund 71-523---212-0001 -- $30,480)
 
2nd and 5th Aldermanic Districts
 
W. Hampton Ave. - N. 68th St. to N. 92nd St. (892-0247-X) (2545-04-72) File Number 951047: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, sodding, and grading. (State or Federal Funds -- $290,685; Nonassessable State Aid Paving Fund 32-523---550-0001 -- $104,595; Assessable State Aid Paving Fund 71-523---550-0001 -- $35,235; State/Federal Grantor Paving Fund 32-523---010-0000 -- $114,600; County Grantor Paving Fund 32-523---010-0000 -- $598,275)
 
3rd Aldermanic District
 
N. Frederick Ave. - E. Bradford Ave. to E. Park Pl. (872-0674-9) File Number 901783: Asphalt pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding, and grading. (Nonassessable Reconstruction Paving Fund 31-523---211-0001 -- $181,070; Assessable Reconstruction Paving Fund 71-523---211-0001 -- $68,795)
 
E. Hartford Ave. - N. Oakland Ave. to N. Cambridge Ave. (872-0676-X) File Number 901783: Asphalt pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding, and grading. (Nonassessable Reconstruction Paving Fund 31-523---211-0001 -- $158,705; Assessable Reconstruction Paving Fund 71-523---211-0001 -- $9,610)
 
4th Aldermanic District
 
N. James Lovell St. - W. Michigan St. to W. Wells St. (878-0761-5) File Number 971108: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, and sodding. (Nonassessable Reconstruction Paving Fund 31-523---211-0001 -- $154,350; Assessable Reconstruction Paving Fund 71-523---211-0001 -- $33,510)
 
W. Juneau Ave. - N. 27th St. to N. 35th St. (873-0807-8) File Number 912231: Asphalt pavement resurfacing, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding, and grading. (Nonassessable Reconstruction Paving Fund 31-523---211-0001 -- $321,570; Assessable Reconstruction Paving Fund 71-523---211-0001 -- $111,165)
 
5th Aldermanic District
 
N. 93rd St. - W. Burleigh St. to W. Concordia Ave. (877-0834-4) File Number 951594: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, sodding, and grading. (Nonassessable Reconstruction Paving Fund 31-523---211-0001 -- $61,350; Assessable Reconstruction Paving Fund 71-523---211-0001 -- $20,265)
 
6th Aldermanic District
 
W. Ring St. - N. 8th St. to N. 10th St. (877-0806-1) File Number 951047: Asphalt pavement resurfacing, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding, and grading. (Nonassessable Reconstruction Paving Fund 31-523---211-0001 -- $87,975; Assessable Reconstruction Paving Fund 71-523---211-0001 -- $2,565)
 
7th Aldermanic District
 
W. Bonny Pl. - N. 42nd St. to N. Sherman Blvd. (878-0706-5) File Number 960854: Asphalt pavement resurfacing, replace all curb and gutter, sidewalk and driveway approaches, sodding, grading, and tree removal where necessary. (Nonassessable Reconstruction Paving Fund 31-523---211-0001 -- $53,220; Assessable Reconstruction Paving Fund 71-523---211-0001 -- $15,475)
 
8th and 12th Aldermanic Districts
 
W. Orchard St. - S. 21st St. to S. 24th St. (873-0783-9) File Number 911748: Narrow the roadway from 39 ft. to 36 ft. concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding, grading, and tree removal where necessary. (Nonassessable Reconstruction Paving Fund 31-523---211-0001 -- $198,155; Assessable Reconstruction Paving Fund 71-523---211-0001 -- $50,025)
 
12th Aldermanic District
 
S. 3rd St. - 150 ft. m/l south of W. Burnham St. to W. Maple St. (872-0682-2) File Number 901942: Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding, and grading. (Nonassessable Reconstruction Paving Fund 31-523---211-0001 -- $104,645; Assessable Reconstruction Paving Fund 71-523---211-0001 -- $10; DCD Paving Fund 31-191---635-2002 -- $32,680)
 
13th Aldermanic District
 
E. Bolivar Ave. - S. Adams Ave. to S. Howell Ave. (874-1747-8) File Number 951047: Narrow the roadway from 33 feet to 32 feet; concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding, and grading. (Nonassessable Reconstruction Paving Fund 31-523---211-0001 -- $258,540; Assessable Reconstruction Paving Fund 71-523---211-0001 -- $69,470)
 
S. 6th St. (E/S) - W. Carpenter Ave. to W. Layton Ave. (878-0768-3) File Number 971863: New concrete sidewalk construction, sodding, grading and tree removal where necessary. (Nonassessable Handicap Ramp Project Fund 31-523---213-0001 -- $23,020; Assessable Reconstruction Paving Fund 71-523---211-0001 -- $14,580)
 
14th Aldermanic District
 
Alley between S. California St., E. Euclid Ave., S. Nevada St. and E. Oklahoma Ave. (880-0662-5) File Number 881935: Concrete alley pavement reconstruction, replace some abutting sidewalk and driveway approaches, grading, and storm water drainage facilities where needed. (Nonassessable Alley Paving Fund 31-523---212-0001 -- $97,735; Assessable Alley Paving Fund 71-523---212-0001 -- $30,950)
 
15th Aldermanic District
 
W. Park Pl. - 600 ft. m/l southeast of N. 124th St. to N. 124th St. (829-4097-4) File Number 930022: Install water main. (Nonassessable Water Fund 42-641---101-0001 -- $85,905; Assessable Water Fund 42-641---201-0001 -- $14,095)
 
N. 124th St. - W. Park Pl. to W. Bradley Rd. (829-4096-9) File Number 930022: Install water main. (Nonassessable Water Fund 42-641---101-0001 -- $75,490; Assessable Water Fund 42-641---201-0001 -- $14,510)
 
N. 124th St. - W. Silver Spring Dr. to 235 ft. m/l north of W. Silver Spring Dr. (829-4094-8) File Number 930022: Install water main. (Nonassessable Water Fund 42-641---101-0001 -- $49,630; Assessable Water Fund 42-641---201-0001 -- $15,370)
 
17th Aldermanic District
 
W. Meinecke Ave. - N. Sherman Blvd. to W. Lisbon Ave. (878-0763-6) File Number 970442: Asphalt pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding, and grading. (Nonassessable Reconstruction Paving Fund 31-523---211-0001 -- $293,660; Assessable Reconstruction Paving Fund 71-523---211-0001 -- $13,670)
 
;and
 
Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and
 
Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it
 
Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works' Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it
 
Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital purpose subaccounts; and, be it
 
Further Resolved, That the projects do not involve any parcels of land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it
 
Further Resolved, That the City Engineer and the Commissioner of Public Works are hereby authorized to negotiate and enter into an agreement with the State of Wisconsin, Department of Transportation for the City to undertake construction management duties on the following project: W. Hampton Ave. (892-0247-X) (2545-04-72)
 
;and, be it
 
Further Resolved, That the City Engineer is authorized and directed to approve and make periodic payments to the State of Wisconsin, Department of Transportation after receipt of invoices from said State for the City's share of the costs for said project:
 
W. Hampton Ave. (892-0247-X) (2545-04-72) Nonassessable Fund 32-523---555-2112 -- $104,595 Assessable Fund 71-523---555-2112 -- $35,235
 
;and, be it
 
Further Resolved, That upon the completion of project 892-0247-X and a determination of the actual cost, it is understood that if the City of Milwaukee's share is less than the amount previously paid, the difference will be refunded to said City; and, be it
 
Further Resolved, By the Common Council of the City of Milwaukee that a variance is authorized from the procedures of File Number 881665, being the Administrative Rules for the Capital Improvements process, and hereby directs the City Comptroller to increase appropriation of $68,000 in the Water Main Parent Account (42-641-201-0001) and in the Water Estimated Revenue (42-641---201-9008); and, be it
 
Further Resolved, That projects E. Bolivar Ave. (874-1747-8); W. Bonny Pl. (878-0706-2); N. Frederick Ave. (872-0674-9); W. Hampton Ave. (892-0247-X; E. Hartford Ave. (872-0676-X); N. James Lovell St. (878-0761-5); W. Meinecke Ave. (878-0763-6); W. Orchard St. (873-0783-9); W. Purdue St. (871-0704-3); W. Ring St. (877-0806-1); N. 93rd St. (877-0834-4); and Alley S. California St. (880-0662-5) will be billed after January 1, 2000, but not before 12 months after the project contract has been completed; and, be it
 
Further Resolved, That projects W. Juneau Ave. (873-0807-8); W. Park Pl. (829-4097-4); N. 124th St. (829-4096-9) and N. 124th St. (829-4094-8) will be billed after January 1, 2001, but not before 12 months after the project contract has been completed; and, be it
 
Further Resolved, That the following project be cancelled from the 1998 Paving Program:
 
8th and 12th Aldermanic Districts
 
W. Orchard St. - S. 20th St. to S. 21st St. (873-0783-9) File Number 911748.
 
W. Orchard St. - S. 24th St. to S. Layton Blvd. (873-0783-9) File Number 911748.
DFTR:
INFRASTRUCTURE SERVICES DIVISION
MGL:sdp
04-30-98