Number
031434
Version
ORIGINAL
Sponsor
THE CHAIR
Title
Resolution determining it necessary to make various assessable public improvements at various locations. (Infrastructure Services Division)
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:
4th Aldermanic District
Alley between W. Cherry St., W. Vliet St., N. 29th St., and N. 30th St. (ST21290142): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $10,000 additional funds)
5th Aldermanic District
N. 80th St. - W. Keefe Ave. to W. Nash St. (ST211050119): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000)
Alley between W. Concordia Ave., W. Townsend St., N. 91st St., and N. 92nd St. (South Half) (ST212050120): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $4,500)
Alley between W. Congress St., W. Lawrence Ave., N. 85th St., and N. 88th St. (ST212050121): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $14,000)
Alley between W. Metcalf Pl., W. Vienna Ave., N. 98th St., and N. 99th St. (Northerly 150 feet m/l) (ST212050129): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $2,000)
6th Aldermanic District
Alley between N. Booth St., E. Chambers St., E. Locust St., and N. Pierce St. (ST21210103): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $11,000 additional funds)
Alley between N. Buffum St., E. Clarke St., N. Holton St., and E. Wright St. (ST21200113): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $7,000 additional funds)
7th Aldermanic District
N. 52nd St. - W. Center St. to W. Locust St. (ST211050118): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $13,000)
Alley between W. Center St., W. Clarke St., N. 49th St., and N. 50th St. (ST212050119): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $9,000)
Alley between W. Hadley St., W. Locust St., N. 32nd St., and N. 33rd St. (ST212050124): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $6,500)
7th and 10th Aldermanic Districts
N. 42nd St. - W. Burleigh St. to W. Townsend St. (ST211050117): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $13,000)
8th Aldermanic District
S. 25th St. - W. Lincoln Ave. to W. Becher St. (ST211050115): Paving the roadway with concrete. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $30,000)
S. 37th St. - W. Burnham St. to W. Mitchell St. (ST211050116): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000)
Alley between W. Becher St., W. Grant St., S. 18th St., and S. 19th St. (ST212050115): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $12,000)
Alley between W. Becher St., W. Rogers St., S. 29th St., and S. 30th St. (ST212050116): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $8,500)
Alley between W. Branting Ln., W. Greenfield Ave., S. 35th St., and S. 36th St. (ST212050117): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $12,000)
Alley between S. Layton Bl., W. Maple St., W. Mitchell St., and S. 26th St. (ST212050127): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $6,500)
Alley between W. Maple St., W. Mitchell St., S. 25th St., and S. 26th St. (ST212050128): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $6,000)
9th Aldermanic District
W. Custer Ave. - N. 33rd St. to N. 35th St. (ST211050121): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $6,500)
10th Aldermanic District
Alley between W. Atkinson Ave., W. Finn Pl. (Extended), N. 10th St., and N. 11th St. (ST21200101): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $2,000 additional funds)
Alley between W. Finn Pl., W. Nash St., N. Teutonia Ave., and N. 19th St. (ST212050123): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $33,000)
Alley between W. Hopkins St., W. Keefe Ave., W. Townsend St., and N. 24th Pl. (ST212050125): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $7,000)
12th Aldermanic District
Alley between W. Lapham St., W. Mitchell St., S. 21st St., and S. 22nd St. (Southerly East-West Leg) (ST212050126): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $2,000)
Alley between W. National Ave., W. Pierce St., S. 22nd St., and S. 23rd St. (ST212050130): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $8,500)
Alley between W. Scott St., W. Washington St., S. 6th St., and S. 7th St. (ST212050131): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $4,500)
14th Aldermanic District
Alley between S. Delaware Ave., E. Iron St., S. Linebarger Tr., and E. Pryor Ave. (ST212050122): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000)
15th Aldermanic District
N. 85th St. - W. Brown Deer Rd. to W. Northridge Ct. (ST211050120): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $20,000)
16th Aldermanic District
W. Dixon St. - N. 92nd St. to W. Chester St. (ST211050122): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000)
Alley between W. Adler St., W. Dixon St., S. 62nd St., and S. 63rd St. (ST212050114): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $8,000)
Alley between W. Burnham St., W. Rogers St., S. 31st St., and S. 32nd St. (ST212050118): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $9,500)
; and, be it
Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it
Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it
Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
Requestor
Infrastructure Services Division
Drafter
mld:lk
apr8
02/19/04