Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $859,000 for a total estimated cost of these projects being $19,421,000.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $859,000 with the total cost estimated to be $19,421,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:
1st and 7th Aldermanic Districts
N. 35th St. - W. Capitol Dr. to W. Hopkins St. (SM497250305) Installing new storm sewer. (Nonassessable Flood Mitigation Fund -- $150,000). The total estimated cost for this project including the requested amount is $9,382,000. This project is anticipated to be completed during the 2026 construction season.
2nd Aldermanic District
N. 76th St. - 240’+/- South of W. Winfield Ave. to W. Winfield Ave. (SM495250063) Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000). The total estimated cost of this project including the requested amount is $93,000. This project is anticipated to be completed during the 2025 construction season.
3rd Aldermanic District
N. Weil St. - E. Auer Ave. to E. Concordia Ave. (SM495250058) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $194,000. This project is anticipated to be completed during the 2026 construction season.
4th Aldermanic District
N. Water St. - 110’ South of E. Erie St. to E. Clybourn St. (WT410260642) File Number 250514: Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 6410 -- $30,000, additional funds). The total estimated cost of this project including the requested amount is $1,120,000. This project is anticipated to be completed during the 2026 construction season.
4th and 12th Aldermanic Districts
16th Street Viaduct over the Menomonee River Expansion Joint Replacement (BR100250110) File Number 241329: (City Share Non-assessable Structure Fund - $30,000, additional funds). The total estimated cost for this project is $705,000. This project is anticipated to be completed during the 2026 construction season.
7th Aldermanic District
N. 55th St. - W. Townsend St. to W. Keefe Ave. (SM495250059) Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $198,000. This project is anticipated to be completed during the 2026 construction season.
N. 58th St. - 300’+/- South of W. Keefe Ave. to W. Keefe Ave. (SM495250060) Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $108,000. This project is anticipated to be completed during the 2026 construction season.
W. Keefe Ave. - N. 53rd St. to N. 60th St. (SM495250061) Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $20,000). The total estimated cost of this project including the requested amount is $571,000. This project is anticipated to be completed during the 2026 construction season.
8th Aldermanic District
S. 34th St. - W. Forest Home Ave. to W. Montana St. (SM495250056) Relaying sanitary and storm sewers. (Nonassessable Sewer Maintenance Relay Fund -- $20,000). The total estimated cost of this project including the requested amount is $336,000. This project is anticipated to be completed during the 2026 construction season.
W. Montana St. - S. 33rd St. to S. 35th St. (SM495250057) Sanitary sewer relay and lining. (Nonassessable Sewer Maintenance Relay Fund - $15,000). The total estimated cost of this project including the requested amount is $260,000. This project is anticipated to be completed during the 2026 construction season.
14th Aldermanic District
E. Falling Heath Pl. - 225’+/- West of S. Swain Ct. to S. Swain Ct. (SM495250053) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000). The total estimated cost of this project including the requested amount is $93,000. This project is anticipated to be completed during the 2026 construction season.
E. Ohio Ave. - S. Kinnickinnic Ave. to S. Pennsylvania Ave. (SM495250054) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $139,000. This project is anticipated to be completed during the 2026 construction season.
S. Pennsylvania Ave. - E. Falling Heath Pl. to E. Ohio Ave. (SM495250055) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $104,000. This project is anticipated to be completed during the 2026 construction season.
15th Aldermanic District
N. 15th St. - W. North Ave. to W. Meinecke Ave. (SM495250062) Combined sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $20,000). The total estimated cost of this project including the requested amount is $368,000. This project is anticipated to be completed during the 2026 construction season.
Various Districts
Miscellaneous Bridge Design (BR100250103) File Number 241329: Engineering related to various bridge maintenance projects. (City Share Non-assessable Structure Fund - $50,000, additional funds). The total estimated cost for this project is $150,000. The project is anticipated to be completed during the 2025 construction season.
City Wide
Water Alterations - Developer Funded (WT430230300) File Number 221268: Water main alterations. (Nonassessable Water Fund Budget Line 6410 -- $50,000, additional funds). The total estimated cost of this project including the requested amount is $100,000. This project is anticipated to be completed during the 2025 construction season.
Administration cost for street paving engineering (ST211250001): (Nonassessable Reconstruction Paving Fund -- $375,000, additional funds). The total 2025 budget for the street resurface/reconstruction program is $5,500,000.
;and, be it
Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.