Number
001024
Version
ORIGINAL
Sponsor
THE CHAIR
Title
Resolution determining it necessary to make various assessable public improvements at various locations. (Infrastructure Services Division)
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:
2nd Aldermanic District
N. 65th St. – W. Clarke St. to W. Center St. (ST211010163): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $1,000)
3rd Aldermanic District
N. Marietta Ave. – E. Locust St. to E. Kenwood Bl. (ST211020144): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $1,000)
7th Aldermanic District
N. 24th St. – W. Garfield Ave. to W. North Ave. (ST211020136): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $1,000)
8th Aldermanic District
Alley between W. Euclid Ave., W. Oklahoma Ave., S. 22nd St., and S. 23rd St. (ST212020120): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $1,000)
11th Aldermanic District
S. 83rd St. – W. Warnimont Ave. to W. Morgan Ave. (ST211020137): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $1,000)
13th Aldermanic District
Alley between W. Euclid Ave., W. Ohio Ave., S. 24th St., and S. 25th St. (ST212020121): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $1,000)
14th Aldermanic District
S. California Ave. – E. Morgan Ave. to a point north of E. Morgan Ave. (ST211020139): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $1,000)
Alley between W. Holt Ave., W. Morgan Ave., S. 18th St., and S. 19th St. (ST212020122): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $1,000)
16th Aldermanic District
N. 91st St. – W. Hawthorne Ave. to W. St. Paul Ave. (ST211020138): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $1,000)
17th Aldermanic District
Alley between W. Juneau Ave., W. McKinley Ave., N. 21st St., and N. 22nd St. (ST212020123): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $1,000)
;and, be it
Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it
Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it
Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
Requestor
Infrastructure Services Division
Drafter
md:lk
apr4
11/15/00