powered help
header-left header-center header-right
File #: 171853    Version:
Type: Resolution Status: Passed
File created: 3/27/2018 In control: COMMON COUNCIL
On agenda: Final action: 4/17/2018
Effective date:    
Title: Resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $185,000 for a total estimated cost of these projects being $1,885,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS

 

Number

171853

Version

Substitute 1

Sponsor

THE CHAIR

Title

Resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $185,000 for a total estimated cost of these projects being $1,885,000.

Analysis

This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $185,000 with the total cost estimated to be $1,885,000.

Body

Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

 

6th Aldermanic District

 

N. Fratney St. - E. Vienna Ave. to E. Capitol Dr. (ST211180195) Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $40,000).  The total estimated cost for this project including the requested amount is $360,000.  This project is anticipated to be completed during the 2019 construction season.

 

8th Aldermanic District

 

S. 32nd St. - W. Madison St. to a point North of W. National Ave. (ST211180196) Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $60,000.  The total estimated cost for this project including the requested amount is $600,000.  This project is anticipated to be completed during the 2019 construction season.

 

10th Aldermanic District

 

W. Hawthorne Ave. - A point East of N. 90th St. to N. 92nd St. (ST211180198) Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000.  The total estimated cost for this project including the requested amount is $175,000.  This project is anticipated to be completed during the 2019 construction season.

 

11th Aldermanic District

 

S. 56th St. -- W. Oklahoma Ave. to W. Stack Dr. (Including S. 56th Ct.) (ST211180197)  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $30,000.  The total estimated cost for this project including the requested amount is $280,000.  This project is anticipated to be completed during the 2019 construction season.

 

 

13th Aldermanic District

 

S. 2nd St. - W. Edgerton Ave. to a point North of W. Vogel Ave. (ST211150106) Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $20,000 additional funds).  The total estimated cost for this project including the requested amount is $370,000.  This project was constructed in during the 2015 construction season.

 

15th Aldermanic District

 

Alley between N. Grant Blvd., W. Hadley St., W. Locust St., and N. 41st St.  (ST212180108)  Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary(Nonassessable Alley Paving Fund -- $15,000.)  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2019-20 construction season.

 

; and, be it

 

Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it

 

Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/Dee LaBelle

Apr10 sub

03 /20/2018