Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $1,155,400 for a total estimated cost of these projects being $2,045,400.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $1,155,400 with the total cost estimated to be $2,045,400.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:
2nd Aldermanic District
N. 74th St. - W. Silver Spring Dr. to W. Thurston Ave. (WT410100018): Relaying water main. (Nonassessable Water Fund -- $15,000). The total estimated cost for this project including the requested amount is $130,000. This project is anticipated to be completed during the 2010 construction season.
3rd Aldermanic District
E. Belleview Pl. - N. Downer Ave. to N. Stowell Ave. (SM495090065): Combined sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $1,000). The total estimated cost for this project including the requested amount is $89,000. This project is anticipated to be completed during the 2009 construction season.
N. Hackett Ave. - N. Downer Ave. to E. Park Pl. (SM495090066): Combined sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $1,000). The total estimated cost for this project including the requested amount is $116,000. This project is anticipated to be completed during the 2009 construction season.
E. Park Pl. - N. Hackett Ave. to N. Summit Ave. (SM495090064): Combined sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $1,000). The total estimated cost for this project including the requested amount is $69,000. This project is anticipated to be completed during the 2009 construction season.
6th Aldermanic District
E. North Ave. - N. Holton St. to 150 feet east of N. Booth St. (WT410100017): Relay water main. (Nonassessable Water Fund -- $20,000). The total estimated cost for this project including the requested amount is $195,000. This project is anticipated to be completed during the 2010 construction season.
12th Aldermanic District
W. National Ave. at S. 9th St. Site Investigation (SM494090104): Soil borings and ground water monitoring. (Nonassessable I & I (Infiltration and Inflow) Reduction Fund -- $1,000). The total estimated cost for this project including the requested amount is $5,000. This project is anticipated to be completed during the 2009 construction season.
12th and 14th Aldermanic Districts
S. Kinnickinnic Ave. and S. 1st St. Bridges over the Kinnickinnic River (BR100090107): Relocation of Communications package and bridge operating control cables to avoid conflict with dredging and sheet piling work required. (City Share Non-assessable Structure Fund -- $1,041,400). The total estimated cost for this project amount is $1,041,400. This project is anticipated to be completed during the 2009 construction season.
14th Aldermanic District
S. Carferry Dr. - S. Lincoln Memorial Dr. to I-794 northbound on-ramp (potential American Reinvestment and Recovery Act (ARRA)) (ST32009XXXX) (potential future ARRA project) Preconstruction engineering design for concrete pavement reconstruction, replace all curb and gutter, replace sidewalk where necessary, sodding and grading
City Share Non-Assessable Fund, Paving
ST320090000
Fund 0333
$45,000
Port of Milwaukee Share
634002-0480-4280-0725-R999-2009
Fund 0480
$30,000
Previously authorized for preliminary engineering (paving): 0
Current estimated cost of the total project including this resolution: $400,000
Original estimated cost of the total project: $400,000
; and, be it
Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.