Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $2,180,000 for a total estimated cost of these projects being $31,809,000.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $2,180,000 with the total cost estimated to be $31,809,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:
1st Aldermanic District
W. Lawn Ave. - 500 feet west of N. 13th St. to 800 feet west of N. 13th St. (WT410100024): Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000). The total estimated cost for this project including the requested amount is $60,000. This project is anticipated to be completed during the 2010 construction season.
N. 31st St. - W. Glendale Ave. to W. Courtland Ave. (SM495100046): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000). The total estimated cost for this project including the requested amount is $129,000. This project is anticipated to be completed during the 2011 construction season.
2nd and 10th Aldermanic Districts
W. Capitol Dr. (north side) - N. 70th St. to N. 71st St. (SM495100045): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000). The total estimated cost for this project including the requested amount is $65,000. This project is anticipated to be completed during the 2010 construction season.
3rd Aldermanic District
West bank of the Milwaukee River - 340 feet m/l south of E. Locust St. (Ext’d) to 275 feet m/l south of E. Chambers St. (Ext’d) (SM495100053): Combined sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost for this project including the requested amount is $725,000. This project is anticipated to be completed during the 2011 construction season.
N. Riverboat Rd. - N. Humboldt Ave. to E. North Ave. (SM495100054): Combined sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost for this project including the requested amount is $963,000. This project is anticipated to be completed during the 2011 construction season.
3rd and 4th Aldermanic Districts
Juneau Avenue Bascule Bridge over the Milwaukee River (BR100100102): Design services for bridge replacement. (City Share Non-assessable Structure Fund -- $1,500,000). The total estimated cost for this project including the requested amount is $18,800,000. This project is anticipated to be completed during the 2011-2012 construction season.
4th Aldermanic District
Clybourn Street Vertical Lift Bridge over the Milwaukee River (BR100100103): Design services for mechanical, hydraulic, and electrical engineering. (City Share Non-assessable Structure Fund -- $300,000). The total estimated cost for this project including the requested amount is $8,450,000. This project is anticipated to be completed during the 2010-2011 construction season.
W. Vliet St. - N. 14th St. to 138 feet m/l east of N. 15th St. (SM495100047): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000). The total estimated cost for this project including the requested amount is $56,000. This project is anticipated to be completed during the 2011 construction season.
5th Aldermanic District
Area bounded by W. Center St., W. Burleigh St., N. 82nd St., and N. 92nd St. (SM494100104): Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost for this project including the requested amount is $777,000. This project is anticipated to be completed during the 2011 construction season.
N. 95th St. - W. Concordia Ave. to W. Auer Ave. (SM495100051): Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $12,000). The total estimated cost for this project including the requested amount is $66,000. This project is anticipated to be completed during the 2010 construction season.
7th Aldermanic District
N. 37th St. - W. Keefe Ave. to W. Nash St. (SM495100052): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost for this project including the requested amount is $146,000. This project is anticipated to be completed during the 2011 construction season.
10th Aldermanic District
W. Stevenson St. - N. 74th St. to N. 76th St. (SM495100048): Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost for this project including the requested amount is $148,000. This project is anticipated to be completed during the 2011 construction season.
11th Aldermanic District
Area bounded by W. Beloit Rd., W. Oklahoma Ave., S. 99th St., and S. 95th St. (SM495100049): Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost for this project including the requested amount is $428,000. This project is anticipated to be completed during the 2011 construction season.
Area bounded by W. Dakota St., W. Ohio Ave., S. 74th St., and S. 68th St. (SM495100050): Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost for this project including the requested amount is $466,000. This project is anticipated to be completed during the 2011 construction season.
S. 63rd St. - 440 feet north of W. Harrison Ave. to W. Harrison Ave. (WT410101047): Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000). The total estimated cost for this project including the requested amount is $80,000. This project is anticipated to be completed during the 2010 construction season.
13th Aldermanic District
W. Edgerton Ave. - S. 23rd St. to S. 14th St. (SM495100043): Storm drain/inlets. (Nonassessable Sewer Maintenance Relay Fund -- $12,000). The total estimated cost for this project including the requested amount is $100,000. This project is anticipated to be completed during the 2011 construction season.
Various Aldermanic Districts
Bridge Safety Inspection (BR100100101): (City Share Non-assessable Structure Fund -- $175,000). The total estimated cost of this project is $175,000. This project is anticipated to be completed in 2010.
City of Greenfield
S. 124th St. - W. Holmes Ave. to 175 feet north of W. Edgerton Ave. (WT410061125) File Number 041695: Water main extension. (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $7,000). The total estimated cost for this project including the requested amount is $175,000. This project is anticipated to be completed during the 2010 construction season.
; and, be it
Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
Requestor
Infrastructure Services Division
Drafter
MLD:dr
Npr 9