File #: 991499    Version:
Type: Resolution Status: Passed
File created: 1/18/2000 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 2/8/2000
Effective date:    
Title: Substitute resolution approving construction of nonassessable public improvement projects at various locations.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SIDEWALKS, STREET IMPROVEMENTS
NUMB:
991499
VERS:
SUBSTITUTE 1
REF:
990843
XXBY:
THE CHAIR
TITL:
Substitute resolution approving construction of nonassessable public improvement projects at various locations.
ANLS:
-Analysis-
 
This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works.
BODY:
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and
 
Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:
 
1st Aldermanic District
 
W. Marion St. - N. 43rd St. to N. 44th St. and N. 46th St. to N. 47th St. (RM52314014) File Number 990843: Asphalt pavement construction, place curb and gutter, sidewalk, driveways, sodding, and grading. (Housing Authority Fund -- $148,500)
 
W. Olive St. - N. 44th Pl. to N. 45th St. (RM52314014) File Number 991497: New asphalt construction, place curb and gutter, sidewalk, driveways, sodding, and grading. (Housing Authority Fund -- $54,000)
 
Parklawn Development Area bounded by W. Marion St., W. Hope Ave., N. Sherman Blvd., N. 47th St. (WK68320007/RE17190216) File Number 991497: Installing storm and sanitary sewers. (Housing Authority Fund -- $500,000)
 
N. 44th Pl. - W. Hope Ave. to W. Olive St. (RM52314014) File Number 991497: New asphalt construction, place curb and gutter, sidewalk, driveways, sodding, and grading. (Housing Authority Fund -- $65,000)
 
N. 45th St. - W. Olive St. to W. Marion St. (RM52314014) File Number 991497: New asphalt construction, place curb and gutter, sidewalk, driveways, sodding, and grading. (Housing Authority Fund -- $45,500)
 
N. 45th Pl. - W. Hope Ave. to W. Olive St. (RM52314014) File Number 991497: New asphalt construction, place curb and gutter, sidewalk, driveways, sodding, and grading. (Housing Authority Fund -- $65,000)
 
Alley between W. Hope Ave., W. Olive St., N. 44th Pl., N. 45th St. (RM52314014) File Number 991497: Concrete alley construction and grading. (Housing Authority Fund -- $39,000)
 
Alley between W. Marion St., W. Olive St., N. 44th Pl., N. 45th St. (RM52314014) File Number 991497: Concrete alley construction and grading. (Housing Authority Fund -- $23,300)
 
Alley between W. Marion St., W. Olive St., N. 45th St., N. 45th Pl. (RM52314014) File Number 991497: Concrete alley construction and grading. (Housing Authority Fund -- $23,300)
 
4th Aldermanic District
 
N. Harbor Dr./I-794 Transit Ramp (ST32091001) File Number 991497: Paving the roadway with concrete. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (State or Federal Funds -- $68,000; Nonassessable State Aid Fund -- $3,500; State/Federal Grantor Paving Fund -- $8,500; Deposit Paving Fund -- $5,050)
 
W. Wisconsin Ave. - N. 11th St. to N. 12th St. (SM495000306) File Number 971958: Install combined sewer. (Nonassessable Sewer Funds -- $92,000)
 
6th Aldermanic District
 
N. Dr. Martin Luther King Jr. Dr. - 128 ft. m/l south of W. Ring St. to 324 ft. m/l north of W. Concordia Ave. (SM495000255) File Number 991497: Install combined sewer. (Nonassessable Sewer Funds -- $180,000)
 
7th Aldermanic District
 
W. Burleigh St. - N. 44th St. to N. 57th St. Exclude from N. 51st St. to N. 54th St. (SM495000233) File Number 971680: Relay sanitary sewer. (Nonassessable Relief and Relay Sewer Fund -- $494,000)
 
8th Aldermanic District
 
W. Harrison Ave. - S. 8th St. to S. 13th St. and S. 8th St. - W. Harrison Ave. to Kinnickinnic River (SM495000172) File Number 990049: Relay combined sewer. (Nonassessable Relief and Relay Sewer Fund -- $1,924,000)
 
S. 8th St. - W. Arthur Ave. to W. Harrison Ave. (SM495000227) File Number 971680: Relay combined sewer. (Nonassessable Relief and Relay Sewer Fund -- $70,000)
 
S. 9th St. - 200 ft. m/l south of W. Harrison Ave. to W. Cleveland Ave. (SM495000236) File Number 971680: Relay combined sewer. (Nonassessable Relief and Relay Sewer Fund -- $71,000)
 
11th Aldermanic District
 
W. Euclid Ave. - W. Forest Home Ave. to S. 51st St. (SM495000167) File Number 990530: Relay sanitary and storm sewers. (Nonassessable Relief and Relay Sewer Fund -- $450,000)
 
S. 51st St. - 270 ft. m/l south of W. Oklahoma Ave. to W. Euclid Ave. (SM495000166) File Number 990049: Relay storm sewer. (Nonassessable Relief and Relay Sewer Fund -- $41,000)
 
14th Aldermanic District
 
S. 6th St. - W. Dakota St. to W. Manitoba St. (SM495000401) File Number 971680: Relay combined sewer. (Nonassessable Relief and Relay Sewer Fund -- $145,000)
 
17th Aldermanic District
 
W. Brown St. - N. 31st St. to N. 32nd St. (SM495000253) File Number 971958: Relay combined sewer. (Nonassessable Relief and Relay Sewer Fund -- $49,000)
 
W. Garfield Ave. - N. 34th St. to N. 35th St. (SM495000251) File Number 971958: Relay combined sewer. (Nonassessable Relief and Relay Sewer Fund -- $63,000)
 
N. 10th St. - W. Clarke St. to W. Center St. (SM495000268) File Number 971958: Relay combined sewer. (Nonassessable Relief and Relay Sewer Fund -- $113,000)
 
N. 11th St. - W. Wright St. to W. Clarke St. (SM495000269) File Number 971958: Relay combined sewer. (Nonassessable Relief and Relay Sewer Fund -- $149,000)
 
N. 16th St. - W. Lloyd St. to a point 272 ft. m/l north of W. Lloyd St. (SM495000178) File Number 990530: Relay combined sewer. (Nonassessable Relief and Relay Sewer Fund -- $73,000)
 
;now, therefore, be it
 
Resolved, By the Common Council of the City of Milwaukee that the Commissioner of Public Works is authorized and directed to proceed with said work; and, be it
 
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it
 
Further Resolved, That the City Engineer and the Commissioner of Public Works are hereby authorized to negotiate and enter into an agreement with the State of Wisconsin, Department of Transportation for the City to undertake construction management duties on the following project: N. Harbor Dr./I-794 Transit Ramp (ST32091001).
DFTR:
INFRASTRUCTURE SERVICES DIVISION
CAW:lmh
01-18-00
NFR7