Substitute Resolution directing the Commissioner of Public Works to execute a document titled “Revision 2 State/Municipal Agreement for a State-Let Local Bridge Project” with the Wisconsin Department of Transportation (WisDOT) for the South 70th Street Bridge over Canadian Pacific Railway / Hank Aaron State Trail in the 10th Aldermanic District.
Analysis
This Resolution authorizes the Commissioner of Public Works to execute a revised Project Agreement with the WisDOT for design oversight and construction of the South 70th Street Bridge over Canadian Pacific Railway / Hank Aaron State Trail.
Body
Whereas, A project agreement has been requested and received from the Wisconsin Department of Transportation (WisDOT) to be executed by the City of Milwaukee for programming, design, and construction of the following bridge project with Federal and State aid under the 2017-2022 Local Bridge Program Sub Program #205:
Project Grant Value
State ID 2656-00-72
BR320141510 and ST320141510
South 70th Street
Bridge over Canadian Pacific Railway / Hank Aaron State Trail
Whereas, The Department of Public Works shall notify the Common Council of the City of Milwaukee of project cost overruns and changes in scope approved by the Department of Public Works; and
Resolved, By the Common Council of the City of Milwaukee that the Commissioner of Public Works is hereby authorized to execute agreements for the design oversight and construction of the aforementioned project with Federal and State aid under the Local Bridge Program, copies of which are attached and are incorporated into this resolution by reference as though set forth in full; and, be it
Further Resolved, That the City Comptroller is hereby authorized to transfer funds to the project grant chart field as follows:
Project Grant Value
State ID 2656-00-72
BR320141510 and ST320141510
South 70th Street
Bridge over Canadian Pacific Railway / Hank Aaron State Trail
City Share Non-Assessable Fund, Structure
BR300230000
Fund 0303
$0
Grantor Reimbursable Fund, Structure
SP032230100
$0
Grantor Non-Reimbursable Fund Structure
$0
City Share Non-Assessable Fund Paving
ST320230000
Fund 0333
$0
Grantor Reimbursable Fund Paving
SP032230100
Fund 0306
$0
Grantor Non-Reimbursable Fund Paving
$0
Estimated Total Construction - $3,702,839.32
Total construction previously authorized $3,702,839.32
Current estimated cost of total project including the resolution: $4,234,541.32
Original estimated cost of the project (File Number 181113): $3,125,710.00
Further Resolved, That the City Engineer is hereby authorized to approve and make periodic payments to the WisDOT upon receipt of invoices for the City’s share of the project costs.
Requestor
Department of Public Works
Drafter
Infrastructure Services Division
Jonathan Thomas:C. Murphy
July 17, 2023