File #: 050805    Version:
Type: Resolution Status: Passed
File created: 10/18/2005 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 11/15/2005
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations.
Sponsors: THE CHAIR
Indexes: SIDEWALK IMPROVEMENTS, STREET IMPROVEMENTS
Attachments: 1. Sub. 1 Fiscal note.pdf, 2. Infr. Serv. Div. Cover Letter.pdf, 3. Fiscal note

Number

050805

Version

SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various assessable public improvements at various locations.

Analysis

This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

 

1st Aldermanic District

 

W. Eggert Pl. - N. 46th St. to N. 50th St. (ST211060130):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $12,000, additional engineering funds)  File Number 040689 authorized $7,500, total estimated engineering is $19,500.

 

N. 27th St. - W. Villard Ave. to a point north of W. Silver Spring Dr. (ST211060102):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $8,000 additional engineering funds)  File Number 040689 authorized $18,000 total estimated engineering is $26,000.

 

N. 28th St. - W. Atkinson Ave. to W. Glendale Ave. (ST211060103):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $6,000 additional engineering funds)  File Number 050565 authorized $4,000 total estimated engineering is $10,000.

 

Alley between W. Fiebrantz Ave., N. Green Bay Ave., W. Hope Ave., N. 12th St. (ST212060109):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000, additional engineering funds)  File Number 040588 authorized $5,000 total estimated engineering is $10,000.

 

2nd Aldermanic District

 

W. Grantosa Dr. (Excluding Structure) - N. 68th St. to W. Fond du Lac Ave. (ST211060137):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000 additional engineering funds)  File Number 040945 authorized $26,000 total estimated engineering is $31,000.

 

N. 64th St. - W. Hampton Ave. to W. Villard Ave. (ST211060136):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $12,000 additional engineering funds)  File Number 040945 authorized $16,000 total estimated engineering is $28,000.

 

3rd Aldermanic District

 

Alley between E. Center St., E. Hadley St., N. Humboldt Bl., N. Weil St. (ST212060103):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000 additional engineering funds)  File Number 040588 authorized $3,000 total estimated engineering is $8,000.

 

Alley between N. Farwell Ave., E. Linnwood Ave., E. Locust St., N. Prospect Ave. (ST212060108):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000 additional engineering funds)  File Number 040588 authorized $3,000 total estimated engineering is $8,000.

 

5th Aldermanic District

 

W. Bobolink Ave. - W. Appleton Ave. to N. Lovers Lane Rd. (ST211060140):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $10,000 additional engineering funds)  File Number 041031 authorized $9,000 total estimated engineering is $19,000.

 

Alley W. Chambers St., W. Locust St., N. 77th St., N. 78th St. (ST21290141):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000)

 

6th Aldermanic District

 

W. Walnut St. (South Roadway) - N. 6th St. to N. 10th St. (ST211060158)  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $3,000)

 

Alley between N. Achilles St., E. Auer St., N. Bluhms Pl., E. Burleigh St. (ST212060119):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000 additional engineering funds)  File Number 040945 authorized $3,000 total estimated engineering is $8,000.

 

7th and 15th Aldermanic Districts

 

N. 24th St. - W. Center St. to W. Locust St. (ST211060119):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $6,000 additional engineering funds)  File Number 040689 authorized $12,000 total estimated engineering is $18,000.

 

8th Aldermanic District

 

S. 24th St. - A point south of W. Lapham St. to W. Greenfield Ave. (ST211020121):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $6,000)

 

W. Lapham St. - S. 24th St. to S. Layton Bl. (ST211050131):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000 additional engineering funds)  File Number 050565 authorized $2,000 total estimated engineering is $7,000.

 

Alley between W. Forest Home Ave., W. Grant St., W. Lincoln Ave., S. 22nd St., S. 23rd St. (ST212050133):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000 additional engineering funds)  File Number 040018 authorized $6,000 total estimated engineering is $11,000 to close out the deleted project.

 

Alley between W. Forest Home Ave., W. Manitoba St., S. 40th St., S. 41st St. (ST212060118):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000 additional engineering funds)  File Number 040803 authorized $3,000 total estimated engineering is $8,000.

 

Alley between W. Lapham St., W. Mitchell St., S. 31st St., S. 32nd St. (East-West Leg) (ST212060127):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000 additional engineering funds)  File Number 041692 authorized $5,000 total estimated engineering is $10,000.

 

Alley between W. National Ave., W. Pierce St., S. 22nd St., and S. 23rd St. (ST212050130):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $3,000 additional engineering funds)  File Number 031434 authorized $8,500 total estimated engineering is $11,500 to close out the deleted project.

 

10th Aldermanic District

 

Alley between W. Burleigh St., W. Chambers St., N. 60th St., N. 61st St. (ST212060116):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $2,000 additional engineering funds)  File Number 040689 authorized $3,000, total estimated engineering is $5,000.

 

11th Aldermanic District

 

W. Warnimont Ave. - S. 82nd St. to S. 84th St. (ST211060115):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000 additional engineering funds)  File Number 050565 authorized $7,000 total estimated engineering is $12,000.

 

S. 82nd St. - W. Wilbur Ave. to W. Morgan Ave. (ST211060101):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $6,000 additional engineering funds)  File Number 040588 authorized $8,000 total estimated engineering is $14,000.

 

12th Aldermanic District

 

Alley between W. Historic Mitchell St., W. Lapham Bl., S. 8th St., S. 9th St. (North-South Leg) (ST21210135):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $7,000 additional engineering funds)  File Number 991271 authorized $2,000 total estimated engineering is $9,000.

 

13th Aldermanic District

 

S. 22nd Pl. - W. Mallory Ave. to W. Clayton Crest Ave. (ST211060118):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000 additional engineering funds)  File Number 040689 authorized $4,000 total estimated engineering is $9,000.

 

14th Aldermanic District

 

E. Conway St. - A point east of S. Wentworth Ave. to a point west of S. Wentworth Ave. (ST211060128):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $6,000 additional engineering funds)  File Number 050565 authorized $2,500 total estimated engineering is $8,500.

 

15th Aldermanic District

 

W. North Ave. - W. Fond du Lac Ave to N. 25th St. (ST211050107):  Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $6,000 additional engineering funds)  File Number 050565 authorized $1,000 total estimated engineering is $7,000.

 

Various Aldermanic Districts

 

Various locations. (ST230040118):  Sidewalk replacement by City Forces. (Assessable Sidewalk Replacement Fund -- $10,000 additional engineering funds) File Number 031465 authorized $250,000.  Total project estimated at $260,000.

 

Various locations. (ST230050126):  Sidewalk replacement by City Forces. (Assessable Sidewalk Replacement Fund -- $60,000 additional engineering funds) File Number 041410 authorized $170,000.  Total project estimated at $230,000.

 

; and, be it

 

Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it

 

Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

mld:lk

apr3

11/01/05