powered help
header-left header-center header-right
File #: 090907    Version:
Type: Resolution Status: Passed
File created: 11/3/2009 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 12/1/2009
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $421,500 for a total estimated cost of these projects being $3,441,400.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Cover Letter, 2. Hearing Notice List, 3. Fiscal note
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
12/9/20091 MAYOR SIGNED   Action details Meeting details Not available
12/1/20091 COMMON COUNCIL ADOPTEDPass14:0 Action details Meeting details Not available
11/18/20091 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Individual present: Clark Wantoch, Dept. of Public Works, Infrastructure Services
Pass5:0 Action details Meeting details Not available
11/10/20090 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
11/3/20090 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

090907

Version

SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $421,500 for a total estimated cost of these projects being $3,441,400.

Analysis

This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $421,500 with the total cost estimated to be $3,441,400.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

 

1st Aldermanic District

 

N. 34th St. - W. Capitol Dr. to W. Hopkins St. (ST211110113): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $25,000).  The total estimated cost for this project including the requested amount is $207,000.  This project is anticipated to be completed during the 2011 construction season.

 

2nd Aldermanic District

 

N. 56th St. - W. Keefe Ave. to W. Capitol Dr. (ST211110115): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $50,000).  The total estimated cost for this project including the requested amount is $425,000.  This project is anticipated to be completed during the 2011 construction season.

 

N. 97th St. - W. Carmen Ave. to W. Flagg Ave. (ST211110123): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $6,000).  The total estimated cost for this project including the requested amount is $48,000.  This project is anticipated to be completed during the 2011 construction season.

 

N. 98th St. - W. Carmen Ave. to W. Flagg Ave. (ST211110124): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000).  The total estimated cost for this project including the requested amount is $39,000.  This project is anticipated to be completed during the 2011 construction season.

 

5th Aldermanic District

 

W. Auer Ave. - N. 84th St. to N . 86th St. (ST211110125): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $15,000).  The total estimated cost for this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Courtland Ave. - W. Potomac Ave. to N. 84th St. (ST211110126): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $9,000).  The total estimated cost for this project including the requested amount is $65,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Courtland Ave. - N. 76th St. to W. Appleton Ave. (ST211110127): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $40,000).  The total estimated cost for this project including the requested amount is $293,000.  This project is anticipated to be completed during the 2011 construction season.

 

N. 81st St. - W. Fiebrantz Ave. to W. Hope Ave. (ST211110120): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $13,000).  The total estimated cost for this project including the requested amount is $96,000.  This project is anticipated to be completed during the 2011 construction season.

 

N. 83rd St. - W. Congress St. to W. Ruby Ave. (ST211110122): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $15,000).  The total estimated cost for this project including the requested amount is $113,000.  This project is anticipated to be completed during the 2011 construction season.

 

N. 83rd St. W. Lorraine Pl. to W. Locust St. (ST211110121): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $146,000.  This project is anticipated to be completed during the 2011 construction season.

 

7th Aldermanic District

 

N. 29th St. - W. Melvina St. to W. Capitol Dr. (ST21110118) File Number 051657: Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $30,000).  The total estimated cost for this project including the requested amount is $245,000.  This project is anticipated to be completed during the 2011 construction season.

 

8th Aldermanic District

 

S. 36th St. - W. Becher St. to W. Burnham St. (ST211110114): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $25,000).  The total estimated cost for this project including the requested amount is $210,000.  This project is anticipated to be completed during the 2011 construction season.

 

10th Aldermanic District

 

N. 58th St. - A point south of W. Valley Forge Dr. to W. Valley Forge Dr. (ST211110105): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $6,500).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 66th St. - W. Dickinson St. to W. Main St. (ST211110116): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $9,000).  The total estimated cost for this project including the requested amount is $72,000.  This project is anticipated to be completed during the 2011 construction season.

 

11th Aldermanic District

 

W. Crawford Ave. - S. 73rd St. to S. 75th St. (ST211030109) File Number 060030: Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $7,000, Additional Funds).  The total estimated cost for this project including the requested amount is $108,400.  This project is anticipated to be completed during the 2009 construction season.

 

S. 53rd St. - W. Tesch Ave. to W. Howard Ave. (ST211050135) File Number 050224: Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 67th St. - W. Cleveland Ave. to W. Fremont Pl. (ST211110117): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $6,000).  The total estimated cost for this project including the requested amount is $43,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 78th St. - W. Verona Ct. to W. Ohio Ave. (ST211110118): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 80th St. - W. Morgan Ave. to W. Oklahoma Ave. (ST211110119): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $50,000).  The total estimated cost for this project including the requested amount is $410,000.  This project is anticipated to be completed during the 2011 construction season.

 

12th and 14th Aldermanic Districts

 

S. 5th St. - W. Lincoln Ave. to W. Becher St. (ST211110112): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $30,000).  The total estimated cost for this project including the requested amount is $250,000.  This project is anticipated to be completed during the 2011 construction season.

 

13th Aldermanic District

 

S. 2nd St. - A point south of W. Norwich St. to W. Howard Ave. (ST211110111): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $166,000.  This project is anticipated to be completed during the 2011 construction season.

 

; and, be it

 

Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it

 

Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

MLD:dr

Apr 4

11/13/09