File #: 230184    Version:
Type: Resolution Status: Passed
File created: 5/31/2023 In control: COMMON COUNCIL
On agenda: Final action: 6/20/2023
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $991,000 for a total estimated cost of $1,040,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. AD Proof.pdf, 2. Signed LTR.pdf, 3. Signed AD.pdf, 4. Notice published 7/7/2023
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
7/7/20231 CITY CLERK PUBLISHED   Action details Meeting details Not available
6/28/20231 MAYOR SIGNED   Action details Meeting details Not available
6/20/20231 COMMON COUNCIL ADOPTEDPass14:0 Action details Meeting details Video Video
6/7/20231 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Holly Rutenbeck - DPW 15th Aldermanic District W. Wright St. – N. 35th St to N. Sherman Blvd. (Incl. traffic circle in the N. Grant Blvd. intersection) (ST211190198) File Number 221122: Asphalt pavement resurfacing, replace all curb and gutter, sidewalk (narrow from 6 feet to 5 feet) and driveway approaches where necessary, sodding (5.0’- 6.5’ width of tree border area), grading and tree removal where necessary. (Assessable Reconstruction Paving Fund – $41,000; Nonassessable Reconstruction Paving Fund -- $950,000). The total estimated cost for this project including the requested amount is $1,040,000. This project is anticipated to be completed during the 2023 construction season. Ald. Stamper moved approval of this item. There were no objections. Ald. Brostoff moved approval of the file as amended. There were no objections.
Pass5:0 Action details Meeting details Video Video
5/31/20230 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

230184

Version

SUBSTITUTE 1

Reference

221122

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $991,000 for a total estimated cost of $1,040,000.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $991,000.  The total estimated cost of these projects is $1,040,000.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

15th Aldermanic District

 

W. Wright St. - N. 35th St to N. Sherman Blvd. (Incl. traffic circle in the N. Grant Blvd. intersection) (ST211190198) File Number 221122: Asphalt pavement resurfacing, replace all curb and gutter, sidewalk (narrow from 6 feet to 5 feet) and driveway approaches where necessary, sodding (5.0’- 6.5’ width of tree border area), grading and tree removal where necessary. (Assessable Reconstruction Paving Fund - $41,000; Nonassessable Reconstruction Paving Fund -- $950,000).  The total estimated cost for this project including the requested amount is $1,040,000. This project is anticipated to be completed during the 2023 construction season.

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved That a portion of the traffic circle will be utilizing ARPA (American Rescue Plan Act) funds:  The project/grant number is RG1515236106; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That project W. Wright St. (ST211190198) will be billed after January 1, 2025, but not before 12 months after the project contract has been completed.

 

Requestor

Infrastructure Services Division

Drafter

Holly Rutenbeck/TW

AFR 13

6/7/2023