File #: 041236    Version:
Type: Resolution Status: Passed
File created: 1/11/2005 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 2/1/2005
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations.
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS
Attachments: 1. Infr. Serv. Div. Cover Letter.pdf, 2. Fiscal Note.pdf, 3. Fiscal Note.pdf
 
Number
041236
Version
SUBSTITUTE 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:
 
1st Aldermanic District
 
Alley between W. Hampton Ave., W. Stark St., N. 20th St., and N. 21st St. (ST212060123):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $10,000)
 
2nd Aldermanic District
 
W. Flagg Ave. - N. 91st St. to N. 94th St. (ST211060148):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $9,000)
 
N. 50th St. - W. Hope Ave. to W. Congress St. (ST211060146):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $9,000)
 
N. 94th St. - W. Carmen Ave. to W. Flagg Ave. (ST211060147):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000)
 
5th Aldermanic District
 
W. Townsend St. - N. 84th St. to N. 86th St. (ST211060149):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000)
 
9th Aldermanic District
 
W. Daphne St. - A point 180 feet m/l east of N. 58th St. to N. 58th St. (ST210050103):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable New Paving Fund -- $4,000)
 
11th Aldermanic District
 
S. 81st St. - W. Warnimont Ave. to W. Morgan Ave. (ST211060145):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000)
 
S. Sunset Dr. - S. Massachusetts Ave. to W. Wedgewood Dr. (ST21190204):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $1,000 additional funds)
 
S. Sunset Dr. - W. Wedgewood Dr. to W. Morgan Ave. (ST211020114):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $1,000 additional funds)
 
12th Aldermanic District
 
S. 3rd St. - W. Oregon St. to W. Pittsburgh St. (ST211050148):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $4,000)
 
W. Oregon St. - S. 2nd St. to S. 3rd St. (ST211050149):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $4,000)
 
14th Aldermanic District
 
S. Robinson Ave. - E. Ward St. to E. Becher St. (ST211050150):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $7,000)
 
; and, be it
 
Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it
 
Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it
 
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
 
Requestor
Infrastructure Services Division
Drafter
mld:lk
apr6
01/19/05
 
 
Clerical error corrected (project number) 1/18/05.  mbh