File #: 231298    Version:
Type: Resolution Status: Passed
File created: 12/12/2023 In control: COMMON COUNCIL
On agenda: Final action: 1/17/2024
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $4,010,000 for a total estimated cost of these projects being $31,011,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS

Number

231298

Version

Substitute 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $4,010,000 for a total estimated cost of these projects being $31,011,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $4,010,000 with the total cost estimated to be $31,011,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

6th Aldermanic District

 

W. Randolph St. - N. 2nd St. to N. 3rd St. (SM495230061) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000). The total estimated cost of this project including the requested amount is $93,000. This project is anticipated to be completed during the 2024 construction season.

 

8th Aldermanic District

 

S. 31st St. - Pedestrian Bridge (2700 South) over Union Pacific Railroad (BR100240106): Preliminary engineering for bridge removal. (City Share Non-assessable Structure Fund - $125,000). The total estimated cost for this project is $425,000. This project is anticipated to be completed during the 2027 construction season.

 

10th Aldermanic District

 

N. 54th St. - W. Vliet St. to W. Washington Blvd. (SM495230031) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $20,000). The total estimated cost of this project including the requested amount is $401,000. This project is anticipated to be completed during the 2024 construction season.

 

10th and 15th Aldermanic Districts

 

W. Lisbon Ave. - N. 45th St. to N. 52nd St. (SM495230032) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $20,000). The total estimated cost of this project including the requested amount is $348,000. This project is anticipated to be completed during the 2024 construction season.

 

12th Aldermanic District

 

W. Rogers St. - S. 14th St. to S. 15th St. (SM495230060) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000). The total estimated cost of this project including the requested amount is $96,000. This project is anticipated to be completed during the 2024 construction season.

 

15th Aldermanic District

 

N. 36th St. - W. Center St. to 313’ North of W. Center St. (SM495230033) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $121,000. This project is anticipated to be completed during the 2024 construction season.

 

W. Cherry St. - N. 12th St. to N. 13th St. (SM495230034) Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000). The total estimated cost of this project including the requested amount is $136,000. This project is anticipated to be completed during the 2024 construction season.

 

Various Aldermanic Districts

 

Administration cost for high impact paving engineering (ST216240001):  Nonassessable High Impact Paving Fund -- $600,000).  The total 2024 budget for the high impact resurface program is $9,750,000.

 

Administration cost for street paving engineering (ST211240001): (Nonassessable Reconstruction Paving Fund -- $1,500,000). The total 2024 budget for the street resurface/reconstruction program is $8,000,000.

 

Administration cost for Sidewalk Replacement (ST230240001) Laying concrete walk. Doing all necessary grading pertaining to said work. (Non- Assessable Sidewalk Reconstruction Paving Fund -- $240,000). The total 2024 budget for the sidewalk replacement program is $1,750,000.

 

Administration cost for 2024 Alley Paving (ST212240001) (Nonassessable Alley Paving Fund -- $125,000). The total 2024 budget for alley paving is $850,000.

 

Administration cost for 2024 Bike Infrastructure engineering (ST260240001) (Nonassessable Bike Infrastructure Fund -- $100,000). The total 2024 budget for the Bike Infrastructure program is $750,000

 

Bridge Indirect and Administration (BR100240101): Preliminary engineering and administration of bridge projects. (City share Non-assessable Structure Fund $150,000). The total estimated cost for this project is $150,000. This project is anticipated to be completed during the 2024 construction season.

 

Bridge Safety Inspection (BR100240102): Federal and State mandated safety inspection of in-service bridges. (City share Non-assessable Structure Fund $290,000). The total estimated cost for this project is $290,000. This project is anticipated to be completed during the 2024 construction season.

 

Miscellaneous Bridge Design (BR100240103): Engineering related to various bridge maintenance projects. (City Share Non-assessable Structure Fund - $100,000). The total estimated cost for this project is $100,000. The project is anticipated to be completed during the 2024 construction season.

 

High impact paving: N. 7th, N. 37th, N. 39th, N. 44th, W. Douglas, W. Galena, W. Martin, W. Roosevelt; Group 1 (ST216240101) Asphalt surface overlay. (Nonassessable High Impact Paving Fund -- $70,000).  The total estimated cost of this project including the requested amount is $1,100,000.  This project is anticipated to be completed during the 2024 construction season.

 

High impact paving: N. 72nd, N. 73rd, N. 76th, N. 80th, N. 90th, N. 91st, W. Congress, W. Herbert, W. Nash, W. Potomac; Group 2 (ST216240102) Asphalt surface overlay. (Nonassessable High Impact Paving Fund -- $75,000).  The total estimated cost of this project including the requested amount is $1,200,000.  This project is anticipated to be completed during the 2024 construction season.

 

High impact paving: S. 44th, S. 50th, S. 76th, S. 83rd, S. 97th, W. Howard, W. New Jersey, W. Ohio, W. Orchard, W. Pabst, W. Van Norman, E./W. Waterford; Group 3 (ST216240103) Asphalt surface overlay. (Nonassessable High Impact Paving Fund -- $80,000).  The total estimated cost of this project including the requested amount is $1,300,000.  This project is anticipated to be completed during the 2024 construction season.

 

High impact paving: S. 9th, S. 19th, E. Belleview, N. Cambridge, W. Clybourn, E. Dakota, S. Delaware, S. Ellen, N. Frederick, W. Michigan, S. Pennsylvania; Group 4 (ST216240104) Asphalt surface overlay. (Nonassessable High Impact Paving Fund -- $70,000).  The total estimated cost of this project including the requested amount is $1,100,000.  This project is anticipated to be completed during the 2024 construction season.

 

High impact paving: City portion of TID 76; S. 20th, W. Plainfield (ST216240105) Asphalt surface overlay. (Nonassessable High Impact Paving Fund -- $15,000).  The total estimated cost of this project including the requested amount is $185,000.  This project is anticipated to be completed during the 2024 construction season.

 

High impact paving: City portion of TID 77: N. 60th St. - W. Mill Rd. to W. Bradley Rd. (ST216240106) Asphalt surface overlay. (Nonassessable High Impact Paving Fund -- $20,000).  The total estimated cost of this project including the requested amount is $500,000.  This project is anticipated to be completed during the 2024 construction season.

 

High impact paving: N. 107th St., N. 115th St: Group 5 (ST216240107) Asphalt surface overlay. (Nonassessable High Impact Paving Fund -- $50,000).  The total estimated cost of this project including the requested amount is $815,000.  This project is anticipated to be completed during the 2024 construction season.

 

High impact paving: N. 26th, N. 31st, S. 57th, W. Michigan, W. Sheridan, W. Vienna; Group 6 (ST216240108) Asphalt surface overlay. (Nonassessable High Impact Paving Fund -- $35,000).  The total estimated cost of this project including the requested amount is $600,000.  This project is anticipated to be completed during the 2024 construction season.

 

Citywide

 

Citywide Infiltration and Inflow Reduction Project. (SM494230010) Private Property Pilot Project. (Infiltration/Inflow Reduction Fund -- $101,000). The total estimated cost of this project including the requested amount is $101,000. This project is anticipated to be completed during the 2024 construction season.

 

Material Inspection at Various Locations. (WT410240880) Water main inspection. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $49,000). The total estimated cost of this project including the requested amount is $50,000. This project is anticipated to be completed during the 2024 construction season.

 

Suburban Plan Reviews. (WT410240800) Water main plan review. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $25,000. This project is anticipated to be completed during the 2024 construction season.

 

Water Alterations - Developer Funded. (WT410240300) Water main alterations. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $25,000. This project is anticipated to be completed during the 2024 construction season.

 

Water Repairs/Distribution Referred. (WT410240840) Water main repairs. (Nonassessable Water Fund Budget Line 5010 -- $1,000.  Nonassessable Water Fund Budget Line 6410 -- $19,000).  The total estimated cost of this project including the requested amount is $250,000.  This project is anticipated to be completed during the 2024 construction season.

 

Work by Done by Contractor/Paving. (WT410240750) Water main alterations. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2024 construction season.

 

Work by Done by Contractor/Sewer Alterations. (WT410240770) Water main alterations. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $150,000. This project is anticipated to be completed during the 2024 construction season.

 

Work by Milwaukee Water Works Prior to Paving. (WT410240730) Water main alterations. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $14,000). The total estimated cost of this project including the requested amount is $150,000. This project is anticipated to be completed during the 2024 construction season.

 

;and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 