Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $111,500 for a total estimated cost of these projects being $1,544,200.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Hearing Notice List
Number
131375
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $111,500 for a total estimated cost of these projects being $1,544,200.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $111,500 with the total cost estimated to be $1,544,200.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:
 
9th Aldermanic District
 
N. 70th St. - 1,000 feet m/l south of W. Glenbrook Rd. to W. Glenbrook Rd. (ST211150102):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $180,000.  This project is anticipated to be completed during the 2015 construction season.
 
10th Aldermanic District
 
W. Blue Mound Ct. - 400 feet m/l east of N. Story Parkway to 50 feet m/l N. Story Parkway (ST211150101):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2015 construction season.
 
W. Schlinger Ave. - S. 84th St. to S. 92nd St. (Portions in the City of West Allis) (ST211120135):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $5,500, Additionals Funds).  The total estimated cost for this project including the requested amount is $430,000.  This project was completed 2012.
 
W. Wells St. - N. 45th Pl. to N. Hawley Rd. (Exclude Structure) (ST211150103):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $40,000).  The total estimated cost for this project including the requested amount is $750,000.  This project is anticipated to be completed during the 2015 construction season.
 
14th Aldermanic District
 
Port of Milwaukee Streets (ST214130102):  Paving roadways at the Port.  (Developer Paving Fund -- $25,000, Additional Funds).  The total estimated cost for this project including the requested amount is $100,000.  This project was completed in 2013 construction season.
 
15th Aldermanic District
 
W. Lisbon Ave. Bridge over the Canadian Pacific Railroad (3000W) (Including approaches) (ST211140168):  Bridge replacement, concrete pavement reconstruction, replace curb and gutter and sidewalk and driveway approaches where necessary, sodding (0-foot width of tree border area, and grading.  (Nonasessable Reconstruction Paving Fund -- $1,000).  The total estimated cost for this project including the requested amount is $4,200.  This project is anticipated to be completed during the 2014 construction season.
 
; and, be it
 
Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it
 
Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it
 
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
 
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
 