Number
241883
Version
Substitute 1
Reference
220499
Sponsor
THE CHAIR
Title
Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $12,363,409.53 for a total estimated cost of these projects being $23,743,709.53.
Analysis
This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works. The City cost of the projects approved by this resolution is estimated to be $12,363,409.53. The total estimated cost of these projects is $23,743,709.53.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and
Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:
4th and 12th Aldermanic Districts
16th Street Bridge - Bridge over the Menomonee River (BR3202217XX/ST3202217XX) (2615-15-73). File Number 220499: Bridge rehabilitation. This project is anticipated to be constructed in the 2025 construction season.
Grantor Non-Reimbursable Paving Fund $157,218.26
Grantor Reimbursable Paving Fund $23,582.74
City Share Non-Assessable Paving Fund $821,219.30
Grantor Non-Reimbursable Structure Fund -- $9,041,181.74
Grantor Reimbursable Structure Fund -- $1,356,177.26
City Share Non-Assessable Structure Fund -- $8,037,430.23
These funds are to be transferred to the construction account (BR3202217XX/ST3202217XX) (2615-15-73)
Previously authorized for project construction: $0.00
Current estimated cost of construction including this resolution: $19,436,809.53
Original estimated cost of the project (File Number 220499): $14,983,600.00
Current estimated total cost of the project including this resolution: $21,192,709.53
7th Aldermanic District
N. 28th St. - W. Locust St. to W. Burleigh St. (SM495240048) File Number 241191: Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -$567,000). The total estimated cost of this project including the requested amount is $587,000. This project is anticipated to be completed during the 2025 construction season.
W. Burleigh St. - N. 20th St. to N. 21st St. (SM495240064) File Number 241329: Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -$127,000). The total estimated cost of this project including the requested amount is $142,000. This project is anticipated to be completed during the 2025 construction season.
W. Burleigh St. - N. 27th St. to N. 28th St. (SM495250014) File Number 241616: Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -$121,000). The total estimated cost of this project including the requested amount is $136,000. This project is anticipated to be completed during the 2025 construction season.
10th Aldermanic District
N. 36th St. - W. Michigan St. to W. Wisconsin Ave. (SM495240049) File Number 241717: Sanitary sewer relay and lining. (Nonassessable Sewer Maintenance Relay Fund - $106,000 additional funds). The total estimated cost of this project including the requested amount is $224,000. This project is anticipated to be completed during the 2025 construction season.
W. Michigan St. - N. 36th St. to 145’+/- east of N. 39th St. (SM495240050) File Number 241717: Relaying sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund - $64,000 additional funds). The total estimated cost for this project including the requested amount is $202,000. This project is anticipated to be completed during the 2025 construction season.
11th Aldermanic District
Building Sanitary Sewer Lateral Lining in Area Bounded By W. Harrison Ave. to W. Kinnickinnic River Pkwy. from S. 60th St. to S. 72nd St. (SM494180010) File Number 191362: Sanitary sewer lateral lining. (Infiltration/Inflow Reduction Fund - $105,000 additional funds). The total estimated cost of this project including the requested amount is $210,000. This project is anticipated to be completed during the 2025 construction season.
Various Aldermanic Districts
Crack Filling of Various Streets by Contract (ST211250102) (Nonassessable Reconstruction Paving Fund -- $500,000). The total estimated cost for this project including the requested amount is $500,000. This project is anticipated to be completed during the 2025 construction season.
Sealcoating of Various Streets by Contract (ST211250101) (Nonassessable Reconstruction Paving Fund -- $500,000). The total estimated cost of this project including the requested amount is $500,000. This project is anticipated to be completed during the 2025 construction season.
City Wide
Flow Monitoring Analysis at Various Locations (SM494240010) File Number 240146: Analysis sanitary sewer. (Infiltration/Inflow Reduction Fund -- $35,000). The total estimated cost of this project including the requested amount is $50,000. This project is anticipated to be completed during the 2025 construction season.
now, therefore, be it
Resolved, By the Common Council of the City of Milwaukee that the Commissioner of Public Works is authorized and directed to proceed with said work; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
Requestor
Infrastructure Services Division
Drafter
Holly Rutenbeck
NFR 10 Sub
4/4/2025