Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $710,000 for a total estimated cost of these projects being $9,788,340.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $660,000 with the total cost estimated to be $9,788,340.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:
3rd and 6th Aldermanic Districts
Pleasant Street Lift Bridge over the Milwaukee River (BR100070104): Engineering for major movable bridge rehabilitation. (City Share Non-assessable Structure Fund -- $600,000, Additional Funds). The total estimated cost for this project including the requested amount is $7,700,000. This project is anticipated to be completed during the 2012-2013 construction season.
4th Aldermanic District
N. 35th St. at W. Juneau Av. (ST211110186): Replace concrete curb and gutter and sidewalk as necessary. (Non-assessable Reconstruction Paving Fund -- $50,000). The total estimated cost of this project including the request is $50,000. This project is anticipated to be completed during the 2011 construction season.
10th Aldermanic District
North 45th Street Bridge over the Menomonee River (BR320062201) (ST320062201): Consultant Design Services for right-of-way plat preparation, hazardous material assessment, and environmental documentation. (City Share Non-assessable Paving Fund -- $25,000, Additional Funds). The total estimated cost for this project including the requested amount is $1,281,340. This project is anticipated to be completed during the 2014 construction season.
13th Aldermanic District
W. Grange Ave. Green Medians - S. 19th St. to S. Howell Ave. (SM493110101): Bioswales. (Nonassessable TSS Removable Fund -- $25,000). The total estimated cost for this project including the requested amount is $600,000. This project is anticipated to be completed during the 2012 construction season.
15th Aldermanic District
N. 33rd St. - W. Vine St. to W. Brown St. (SM495100090): Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000, Additional Funds). The total estimated cost for this project including the requested amount is $157,000. This project is anticipated to be completed during the 2012 construction season.
; and, be it
Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.