File #: 080002    Version:
Type: Resolution Status: Passed
File created: 4/15/2008 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 5/20/2008
Effective date:    
Title: Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $977,400 for a total estimated cost of these projects being $3,159,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Infrastructure Services Division Cover Letter, 2. Fiscal Note, 3. Hearing notice list

Number

080002

Version

SUBSTITUTE 1

Reference

 

Sponsor

THE CHAIR

Title

Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $977,400 for a total estimated cost of these projects being $3,159,000.

Analysis

This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works.  The City cost of the projects approved by this resolution is estimated to be $977,400.  The total estimated cost of these projects is $3,159,000.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and

 

Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:

 

3rd Aldermanic District

 

N. Prospect Ave. - Bridge over Oak Leaf Bike Trail (BR320051401) and (ST320051401):  Bridge Replacement

 

City Share Non-Assessable Paving Fund -- $20,400

 

These funds are to be transferred to the construction account ST320051410.

 

Previously authorized for construction:  $1,474,600

Current estimated cost of the total project including this resolution:  $1,792,000

Original estimated cost of the total project File Number (041289):  $1,747,000

(This resolution does not change these two estimates.)

 

This project is anticipated to be completed during the 2008 construction season.

 

4th Aldermanic District

 

W. St. Paul Ave. - N. 9th St. to N. 13th St. (WT410080012) File Number 070266: Relay water main.  (Nonassessable Water Fund -- $650,000).  The total estimated cost for this project including the requested amount is $680,000.  This project is anticipated to be completed during the 2008 construction season.

 

12th Aldermanic District

 

W. Forest Home Ave. - W. Historic Mitchell St. to S. 16th St. (SM495070140) File Number 071489.  Combined sewer relay and lining.  (Nonassessable Sewer Maintenance Relay Fund -- $73,000 Additional funds).  The total estimated cost for this project including the requested amount is $428,000.  This project is anticipated to be completed during the 2008 construction season.

 

13th and 14th Aldermanic Districts

 

W. Saveland Ave. - S. Howell Ave. to S. 1st St. (SM495070136)  File Number 071055:  Sanitary sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $40,000)  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2008 construction season.

 

15th Aldermanic District

 

N. 13th St. - W. Cherry St. to 250 feet m/l north of W. Cherry St. (SM495080002) File Number 071378:  Relay combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $64,000).  The total estimated cost for this project including the requested amount is $79,000.  This project is anticipated to be completed during the 2008 construction season.

 

N. 21st St. - W. Galena St. to W. Walnut St. (TD05888004) File Number 050276:  Install concrete walk, install concrete driveway approaches where needed, sodding, and grading.  (TID Nonassessable Paving Fund -- $28,000).  The total estimated cost for this project including the requested amount is $28,000).  This project is anticipated to be completed during the 2008 construction season.

 

Alley between W. Galena St., W. Walnut St., N. 20th St. and North 21st St. (TD05888004) File Number 050276:  Construct concrete alley pavement, construct some abutting walk or driveway approaches, grading and storm drainage facilities where needed.  (TID Nonassessable Paving Fund -- $51,000).  The total estimated cost for this project including the requested amount is 51,000.  This project is anticipated to be completed during the 2008 construction season.

 

Alley between W. Galena St., W. Walnut St., N. 21st St. and North 22nd St. (TD05888004) File Number 050276:  Construct concrete alley pavement, construct some abutting walk or driveway approaches, grading, and storm drainage facilities where needed.  (TID Nonassessable Paving Fund -- $51,000).  The total estimated cost for this project including the requested amount is $51,000.  This project is anticipated to be completed during the 2008 construction season.

 

; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works is authorized and directed to proceed with said work; and, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the following water main be rescinded as follows:

 

City of Greenfield

 

W. Forest Home Ave. @ S. 68th St. (WT410071410) File Number 070783: Relay water main.  (Nonassessable Water Fund -- $35,000).  The total estimated cost for this project including the requested amount is $50,000.

 

; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

mld:dr

nfr

4/10/08