Number
140816
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $227,000 for a total estimated cost of these projects being $4,072,000.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction. The City cost for engineering these projects is estimated to be $227,000 with the total cost estimated to be $4,072,000.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:
2nd Aldermanic District
Alley between W. Hope Ave., W. Marion St., N. 61st St., and N. 62nd St. (ST212140127): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $15,000, Additional Funds). The total estimated cost for this project including the requested amount is $197,000. This project is anticipated to be completed during the 2014 construction season.
5th Aldermanic District
Alley between W. Appleton Ave., W. Congress St., W. Hope Ave., W. Potomac Ave., and N. 80th St. (north-south leg) (ST212020110): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $25,000, Additional Funds). The total estimated cost for this project including the requested amount is $350,000. This project is anticipated to be completed during the 2014 construction season.
Alley between W. Hadley St., W. Locust St., N. 81st St., and N. 82nd St. (ST212140124): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $15,000, Additional Funds). The total estimated cost for this project including the requested amount is $193,000. This project is anticipated to be completed during the 2014 construction season.
8th Aldermanic District
S. 35th St. - A point south of W. Burnham St. to W. Mitchell St. (ST211140151): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $75,000, Additional Funds). The total estimated cost for this project including the requested amount is $590,000. This project is anticipated to be completed during the 2014 construction season.
Alley between W. Grant St., W. Lincoln Ave., S. 20th St., and S. 21st St. (ST212060125): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $20,000, Additional Funds). The total estimated cost for this project including the requested amount is $215,000. This project is anticipated to be completed during the 2014 construction season.
11th Aldermanic District
W. Howard Ave. - S. 40th St. to S. 43rd St. (Sponsored by the City of Greenfield) (ST211150181): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000). The total estimated cost for this project including the requested amount is $200,000. This project is anticipated to be completed during the 2015 construction season.
S. 32nd St., S. 33rd St., S. 34th St., and W. Warnimont Ave. - South of W. Morgan Ave. (Sponsored by the City of Greenfield) (ST211150180): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000). The total estimated cost for this project including the requested amount is $200,000. This project is anticipated to be completed during the 2015 construction season.
Alley between W. Cleveland Ave., W. Fremont Pl., S. 63rd St., and S. 67th St. (ST212140102): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $10,000, Additional Funds. The total estimated cost for this project including the requested amount is $130,000. This project is anticipated to be completed during the 2014 construction season.
12th Aldermanic District
S. 15th St. - W. Washington St. to W. Mineral St. (ST211150179): Install traffic calming devices. (Nonassessable Reconstruction Paving Fund -- $1,000). The total estimated cost for this project including the requested amount is $6,000. This project is anticipated to be completed during the 2014-2015 construction season.
Alley between W. Madison St., W. Scott St., S. 8th St., and S. 9th St. (ST211150178): Install traffic calming devices. (Nonassessable Reconstruction Paving Fund -- $1,000). The total estimated cost for this project including the requested amount is $6,000. This project is anticipated to be completed during the 2014-2015 construction season.
15th Aldermanic District
Alley between W. Center St., N. Grant Blvd., W. Hadley St., and N. Sherman Blvd. (ST212140120): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $15,000, Additional Funds). The total estimated cost for this project including the requested amount is $195,000. This project is anticipated to be completed during the 2014 construction season.
City Wide
Scattered Sites 2014 (ST230140148): Sidewalk replacement. Laying concrete walk. Doing all necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds). The total estimated cost for this project including the requested amount is $290,000. This project is anticipated to be completed during the 2014 construction season.
Various Aldermanic Districts
Area bounded by N. 64th St./W. Avondale Blvd., W. Center St., N. 68th St., W. Burleigh St.; Area bounded by W. Oklahoma Ave., S. 13th St., W. Morgan Ave., S. 20th St.; and various locations. (ST230130145) File Number 130148: Laying concrete walk. Doing all necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $30,000, Additional Funds). The total estimated cost for this project including the requested amount is $1,500,000. This project is anticipated to be completed during the 2014 construction season.
; and, be it
Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it
Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it
Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
Requestor
Infrastructure Services Division
Drafter
Mary Dziewiontkoski/Denise Reinholtz
Apr 2
09/26/2014