File #: 090763    Version:
Type: Resolution Status: Passed
File created: 10/13/2009 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 11/3/2009
Effective date:    
Title: Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $3,826,817 for a total estimated cost of these projects being $4,181,837.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Fiscal Note, 2. Cover Letter, 3. Comptroller certification, 4. Hearing Notice List

Number

090763

Version

SUBSTITUTE 1

Reference

060882

Sponsor

THE CHAIR

Title

Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $3,826,817 for a total estimated cost of these projects being $4,181,837.

Analysis

This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works.  The City cost of the projects approved by this resolution is estimated to be $3,826,817.  The total estimated cost of these projects is $4,181,837.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and

 

Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:

 

1st Aldermanic District

 

W. Hampton Av. - Bridge over Lincoln Creek (N. 31st St. to N. 32nd St.) (BR320062101/ST320062101)(2545-12-70) File Number 060882: Replace bridge, asphalt pavement resurfacing of bridge approaches, replace curb and gutter, sidewalk as necessary and grading.

Grantor Non-Reimbursable Paving Fund--$ 88,071

Grantor Reimbursable Paving Fund -- $12,900

City Share Non-assessable Paving Fund--$ 26,535

 

Grantor Non-Reimbursable Structure Fund--$ 1,007,865

Grantor Structure Reimbursable Structure Fund--$153,300

City Share Non-Assessable Structure Fund--$ 305,146

 

These funds are to be transferred to the construction account (BR320062110/ST320062110) (2545-12-70).

 

Previously authorized for bridge construction:  $0.00

Current estimated cost of the total project including this resolution: $1,840,837

Original estimated cost of the total project (File Number 060882):  $ 1,497,000

This project is anticipated to be completed during the 2010 construction season.

 

3rd Aldermanic District

 

N. Cramer St. - E. North Ave. to E. Thomas Ave. (SM495080031) File Number 080237: Relay combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $65,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2010 construction season.

 

N. Marshall St. - E. Juneau Ave. to E. Ogden Ave. (SM495070064) File Number 070081: Relay combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $198,000).  The total estimated cost for this project including the requested amount is $210,000.  This project is anticipated to be completed during the 2010 construction season.

 

N. Maryland Ave. - E. Hartford Ave. to E. Newport Ave. (SM495080034) File Number 080237: Relay combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $149,000).  The total estimated cost for this project including the requested amount is $159,000.  This project is anticipated to be completed during the 2010 construction season.

 

N. Warren Ave. - N. Franklin Pl. to a point 125 feet m/l north of N. Franklin Pl. (SM495070090) File Number 070266: Relay combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $41,000).  The total estimated cost for this project including the requested amount is $51,000.  This project is anticipated to be completed during the 2010 construction season.

 

6th Aldermanic District

 

N. 20th St. - 320 feet m/l south of W. Concordia Ave. to 200 feet m/l north of W. Roosevelt Dr. (SM495080043) File Number 080237: Relay combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $350,000).  The total estimated cost for this project including the requested amount is $360,000.  This project is anticipated to be completed during the 2010 construction season.

 

7th Aldermanic District

 

W. Concordia Ave. - N. 41st St. to N. Sherman Blvd. (SM495090013) File Number 081489: Relay sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $110,000).  The total estimated cost for this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2010 construction season.

 

Area bounded by W. Congress St. to W. Glendale Ave. to N. Sherman Blvd. and N. 38th St. (SM494090106) File Number 090762): Sanitary sewer main and lateral lining. (Nonassessable Sewer Maintenance Relay Fund -- $994,000).  The total estimated cost for this project including the requested amount is $995,000.  This project is anticipated to be completed during the 2010 construction season.

 

W. Townsend St. - N. 42nd St. to N. Sherman Blvd. (SM495090010) File Number 081489: Relay sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $55,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2010 construction season.

 

N. 45th St. - W. Concordia Ave. to 375 feet m/l north of W. Concordia Ave. (SM495080073) File Number 090512: Relay sanitary sewer. (Nonassessable Sewer Maintenance Relay Fund -- $78,000).  The total estimated cost for this project including the requested amount is $93,000.  This project is anticipated to be completed during the 2010 construction season.

 

N. 46th St. - W. Center St. to W. Hadley St. (SM495070109) File Number 071055: Sanitary sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $106,000).  The total estimated cost for this project including the requested amount is $116,000.  This project is anticipated to be completed during the 2010 construction season.

 

10th Aldermanic District

 

N. 68th St. - W. Mt. Vernon Ave. to a point north of W. Mt. Vernon Ave. (Sponsored by the City of Wauwatosa) (ST211090150) File Number 090762: Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $12,000).  The total estimated cost for this project is $12,000.  This project is anticipated to be completed during the 2009 construction season.

 

Various Locations

 

Movable Bridges Remote Control Upgrades (BR100090109): (City Share Nonassessable Structure Fund -- $75,000).  The total estimated cost for this project is $75,000.  This project is anticipated to be completed during the 2009-2010 construction season.

 

; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works is authorized and directed to proceed with said work; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

MLD:dr

Nfr 3

10/16/09