Number
241192
Version
Substitute 1
Reference
220619
Sponsor
THE CHAIR
Title
Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $3,575,000 for a total estimated cost of these projects being $3,800,000.
Analysis
This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works. The City cost of the projects approved by this resolution is estimated to be $3,575,000. The total estimated cost of these projects is $3,800,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and
Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:
4th Aldermanic District
Alley Betw. W. McKinley Av.(ext'd), W. Vliet St., N. 20th St., N. 21st St. (new alley for DCD) (ST214220101) File Number 220619: Construct new alley, install permeable pavers. (Developer Deposit fund - $30,000, additional funds) The total estimated cost of this project including the requested amount is $195,000. This project is completed and the additional funding is needed to close out the project.
5th Aldermanic District
Traffic Triangles (W. Auer Ave., N. 87th St., W. Townsend St., and N. 85th St.) (SM499240010) File Number 231464: Installing Bioswales. (Nonassessable Water Quality Fund -- $120,000). The total estimated cost of this project including the requested amount is $150,000. This project is anticipated to be completed during the 2025 construction season
8th Aldermanic District
S. 20th St. - W. Cleveland Ave. to W. Lincoln Ave. (SM499240013) File Number 231464: Installing Bioswales. (Nonassessable Water Quality Fund -- $230,000). The total estimated cost of this project including the requested amount is $260,000. This project is anticipated to be completed during the 2025 construction season.
City Wide
2025 Indirect Account. (SM495250001) (Nonassessable Sewer Maintenance Relay Fund --$800,000). The total estimated cost of this project including the requested amount is $800,000. This project is anticipated to be completed during the 2025 construction season.
2025 Paving Coordination. (SM495250002) (Nonassessable Sewer Maintenance Relay Fund --$125,000). The total estimated cost of this project including the requested amount is $125,000. This project is anticipated to be completed during the 2025 construction season.
2025 Sanitary Manhole Inspections. (SM494250001) (Infiltration/Inflow Reduction Fund -- $200,000). The total estimated cost of this project including the requested amount is $200,000. This project is anticipated to be completed during the 2025 construction season.
2025 Sewer Exam Requests. (SM495250003) (Nonassessable Sewer Maintenance Relay Fund --$150,000). The total estimated cost of this project including the requested amount is $150,000. This project is anticipated to be completed during the 2025 construction season.
2025 Sewer Repairs. (SM495250006) (Nonassessable Sewer Maintenance Relay Fund --$100,000). The total estimated cost of this project including the requested amount is $100,000. This project is anticipated to be completed during the 2025 construction season.
2025 Sewer Structure Inspections. (SM495250004) (Nonassessable Sewer Maintenance Relay Fund --$70,000). The total estimated cost of this project including the requested amount is $70,000. This project is anticipated to be completed during the 2025 construction season.
2025 Sewer Survey Requests. (SM495250005) (Nonassessable Sewer Maintenance Relay Fund --$500,000). The total estimated cost of this project including the requested amount is $500,000. This project is anticipated to be completed during the 2025 construction season.
2025 Sewer Work Prior to Paving. (SM495250500) (Nonassessable Sewer Maintenance Relay Fund --$1,250,000). The total estimated cost of this project including the requested amount is $1,250,000. This project is anticipated to be completed during the 2025 construction season.
now, therefore, be it
Resolved, By the Common Council of the City of Milwaukee that the Commissioner of Public Works is authorized and directed to proceed with said work; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
Requestor
Infrastructure Services Division
Drafter
Holly Rutenbeck
NFR 5 Sub
11/26/2024