File #: 091430    Version:
Type: Resolution Status: Passed
File created: 3/2/2010 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 3/24/2010
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $114,000 for a total estimated cost of these projects being $1,678,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Fiscal Note, 2. Cover Letter, 3. Hearing Notice List

Number

091430

Version

SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $114,000 for a total estimated cost of these projects being $1,678,000.

Analysis

This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $114,000 with the total cost estimated to be $1,678,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

 

1st Aldermanic District

 

N. 20th St. (east roadway) - W. Purdue St. to W. Hampton Ave. (ST211120104): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $13,000).  The total estimated cost for this project including the requested amount is $126,000.  This project is anticipated to be completed during the 2012 construction season.

 

2nd Aldermanic District

 

W. Stark St. - N. 64th St. to N. 68th St. (ST211110142): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $16,000).  The total estimated cost for this project including the requested amount is $174,000.  This project is anticipated to be completed during the 2011 construction season.

 

4th Aldermanic District

 

E. Erie St. - A point 600 feet east of N. Jackson St. to N. Jackson St. (ST211080128) File Number 090969: Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $7,000, Additional Funds).  The total estimated cost for this project including the requested amount is $432,000.  This project is anticipated to be completed during the 2010 construction season.

 

6th Aldermanic District

 

N. 6th St. - W. Fiebrantz Ave. to a point 250 feet m/l north of W. Fiebrantz Ave. (ST211120101): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $6,000).  The total estimated cost for this project including the requested amount is $41,000.  This project is anticipated to be completed during the 2012 construction season.

 

10th Aldermanic District

 

N. 72nd St. - W. Locust St. to W. Burleigh St. (ST211100107) File Number 081266: Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $15,000, Additional Funds).  The total estimated cost for this project including the requested amount is $180,000.  This project is anticipated to be completed during the 2011 construction season.

 

Alley between W. Adler St., W. Dixon St., S. 62nd St., and S. 63rd St. (ST212050114) File Number 050224: Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $8,000).  The total estimated cost for this project including the requested amount is $93,000.  This project is anticipated to be completed during the 2010 construction season.

 

11th Aldermanic District

 

Alley between W. Leroy Ave., W. Plainfield Ave., S. 51st St., and S. 52nd St. (ST212030103): Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000, Additional Funds).  The total estimated cost for this project including the requested amount is $121,000.  This project is anticipated to be completed during the 2010 construction season.

 

13th Aldermanic District

 

S. 17th St. - W. Morgan Ave. to W. Ohio Ave. (ST211120102): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $201,000.  This project is anticipated to be completed during the 2012 construction season.

 

S. 18th St. - W. Morgan Ave. to W. Holt Ave. (ST211120103): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $9,000).  The total estimated cost for this project including the requested amount is $95,000.  This project is anticipated to be completed during the 2012 construction season.

 

14th Aldermanic District

 

S. Herman St. - E. Euclid Ave. to E. Oklahoma Ave. (ST211100117): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000, Additional Funds).  The total estimated cost for this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2010 construction season.

 

Alley between E. Bennett Ave., S. Ellen St., S. Kinnickinnic Ave., and E. Oklahoma Ave. (ST212080110): Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $10,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2010 construction season.

 

; and, be it

 

Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it

 

Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

MLD:dr

Apr 9

03/04/10