powered help
header-left header-center header-right
File #: 171592    Version:
Type: Resolution Status: Passed
File created: 2/6/2018 In control: COMMON COUNCIL
On agenda: Final action: 2/27/2018
Effective date:    
Title: Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $9,679,000 for a total estimated cost of these projects being $10,232,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS

Number

171592

Version

Substitute 1

Reference

161562

Sponsor

THE CHAIR

Title

Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $9,679,000 for a total estimated cost of these projects being $10,232,000.

Analysis

This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works.  The City cost of the projects approved by this resolution is estimated to be $9,679,000.  The total estimated cost of these projects is $10,232,000.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and

 

Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:

 

2nd Aldermanic District

 

N. 57th St. - W. Villard Ave. to W. Sheridan Ave.  (WT410180624) File Number 161562: Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $597,000).  The total estimated cost for this project including the requested amount is $635,000.  This project is anticipated to be completed during the 2018 construction season.

 

4th Aldermanic District

 

N. 8th St. - a point south of W. State St. to W. State St. (ST211180182) File Number 171591: Concrete pavement reconstruction, replace curb and gutter and walk as necessary.  (Nonassessable Reconstruction Paving Fund -- $45,000). The total estimated cost of this project is $50,000. This project is estimated to be completed during the 2018 construction season.

 

Alley north of W. Highland Ave. - Old World Third St. to 170 feet west of Old World Third St. (SM495170068) File Number 171095: Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $58,000).  The total project amount including the estimated amount is $68,000.  This project is anticipated to be completed during the 2018 construction season.

 

5th Aldermanic District

 

W. Auer Ave. - N. 84th St. to N. 85th St. (WT410180609) File Number 161562: Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $112,000). The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Elmore Ave. - N. Willis Pl. to N. 94th St. (WT410180610) File Number 161562: Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $67,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Fiebrantz Ave. - N. 88th St. to N. 89th St. (WT410180603) File Number 161562: Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $ 3,000; Nonassessable Water Fund Budget Line 6410 -- $ 77,000).  The total estimated cost for this project including the requested amount is $95,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Glendale Ave. - N. 84th St. to N. 87th St. (WT410180639) File Number 161562: Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000;

Nonassessable Water Fund Budget Line 6410 -- $322,000).  The total estimated cost for this project including the requested amount is $345,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Herbert Ave. - W. Hampton Ave. to N. 90th St. (WT410180640) File Number 161562:  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $432,000).

The total estimated cost for this project including the requested amount is $460,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Ruby Ave./N.88th St. - N. 85th St. to W. Lawrence Ave. (WT410180641) File Number 161562:  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $347,000). The total estimated cost for this project including the requested amount is $375,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 87th St. - W. Arden Pl. to W. Palmetto Ave. (WT410180638) File Number 161562: Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $82,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2018 construction season.

N. 87th St. - W. Capitol Dr. to W. Fiebrantz Ave. (WT410180604) File Number 161562: Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $227,000).  The total estimated cost for this project including the requested amount is $245,000.  This project is anticipated to be completed during the 2018 construction season.

 

 

6th Aldermanic District

 

W. Groeling Ave. - N. 13th St. to N. 14th St. (SM495170022) File Number 161694: Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $212,000).  The total estimated cost for this project including the requested amount is $224,000. This project is anticipated to be completed during the 2018 construction season.

 

N. 5th St. - N. Dr. Martin Luther King Jr. Dr. to W. Keefe Ave.  (SM495170039) File Number 170278: Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $254,000).  The total estimated cost for this project including the requested amount is $269,000.  This project is anticipated to be completed during the 2018 construction season.

 

7th Aldermanic District

 

W. Villard Ave. - N. 56th St. to N. 60th St. (WT410180644) File Number 170019:  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $387,000).  The total estimated cost for this project including the requested amount is $410,000.  This project is anticipated to be completed during the 2018 construction season.

 

N. 57th St. - W. Hampton Ave. to W. Villard Ave. (WT410180645) File Number 170019: Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $747,000).  The total estimated cost for this project including the requested amount is $790,000.  This project is anticipated to be completed during the 2018 construction season.

 

11th Aldermanic District

 

W. Euclid Ave. - S. 68th St. to S. 70th St. (WT410180612) File Number 161562: Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $242,000).  The total estimated cost for this project including the requested amount is $260,000.  This project is anticipated to be completed during the 2018 construction season.

 

W. Montana St. - S. 55th St. to S. 58th St. (WT410180618) File Number 161562: Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000;

Nonassessable Water Fund Budget Line 6410 -- $332,000).  The total estimated cost for this project including the requested amount is $355,000.  This project is anticipated to be completed during the 2018 construction season.

 

 W. Wedgewood Dr. - S. 68th St. to S. Honey Creek Dr. (WT410180689) File Number 170019: Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $72,000).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2018 construction season.

 

S. 61st St. - W. Montana St. to W. Oklahoma Ave. (WT410180688) File Number 170019: Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $547,000). The total estimated cost for this project including the requested amount is $580,000.  This project is anticipated to be completed during the 2018 construction season.

 

S. 70th St. - W. Euclid Ave. to 160 feet south of W. Ohio Ave. (WT410180611) File Number 161562:  Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $367,000). The total estimated cost for this project including the requested amount is $390,000.  This project is anticipated to be completed during the 2018 construction season.

 

S. 73rd St. - W. Holt Ct. to W. Morgan Ave. (WT410180683) File Number 170019:  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $147,000).  The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2018 construction season.

 

S. 75th St. - W. Verona Ct. to W. Morgan Ave. (WT410180682) File Number 170019: Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $162,000).  The total estimated cost for this project including the requested amount is $180,000.  This project is anticipated to be completed during the 2018 construction season.

 

S. 84th St. - W. Morgan Ave. to W. Warnimont Ave. (WT410180627) File Number 161562: Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $232,000).  The total estimated cost for this project including the requested amount is $250,000.  This project is anticipated to be completed during the 2018 construction season.

 

14th Aldermanic District

 

W. Dakota St. - S. 6th St. to S. 11th St. (SM494180013) File Number 170392:  Installing new storm sewer.  (Infiltration/Inflow Reduction Fund -- $939,000).  The total estimated cost for this project including the requested amount is $959,000.  This project is anticipated to be completed during the 2018 construction season.

 

S. 6th St. - W. Dakota St. to 180 feet south of W. Dakota St.  (SM494180012)  File Number 170392: Installing new storm sewer.  (Infiltration/Inflow Reduction Fund -- $360,000).  The total estimated cost for this project including the requested amount is $372,000.  This project is anticipated to be completed during the 2018 construction season.

 

S. 7th St. - W. Montana St. to W. Dakota St. (SM494180014)  File Number 170392: Installing new storm sewer.  (Infiltration/Inflow Reduction Fund -- $348,000).  The total estimated cost for this project including the requested amount is $363,000.  This project is anticipated to be completed during the 2018 construction season.

 

City Wide

 

Handicap Ramp work to meet ADA requirements - High Impact 2018 Projects- first contract  (ST216180107) File Number 171215: (Nonassessable High Impact Streets -- $1,500,000).  The total estimated cost for this project including the requested amount is $1,600,000.  This project is anticipated to be completed during the 2018 construction season. 

 

Work done by Contractors-Sewer Alterations  (WT410180770) File Number 171373: Water main alteration. (Nonassessable Water Fund Budget Line 6410 -- $85,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2018 construction season.

 

2018 Sewer Structure Inspections (SM495180004) File Number 171591:

(Nonassessable Sewer Maintenance Relay Fund -- $30,000).  The total estimated cost for this project including the requested amount is $40,000.  This project is anticipated to be completed during the 2018 construction season.

 

2018 Sewer Structure Requests (SM495180005) File Number 171591: (Nonassessable Sewer Maintenance Relay Fund -- $40,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2018 construction season.

 

Various Aldermanic Districts

 

Open metal grate bridge bike plates on N. Water St. bridge over the Milwaukee River and W. Cherry Street over the Milwaukee River (BR100180105) File Number 161695Construction Installation of Metal Bike plate on N. Water St. bridge over the Milwaukee River and W. Cherry over the Milwaukee River.  (City Share Non-assessable Structure Fund -- $225,000). The total estimated cost for this project is $225,000.  This project is anticipated to be completed during the 2018 construction season.

 

now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee that the Commissioner of Public Works is authorized and directed to proceed with said work; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

 

Drafter

Mary Dziewiontkoski/Dee La Belle

Nfr 8

02/05/2018

 

Techinical Correction

Molly Kuether-Steele

2/13/18