This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $68,000 with the total cost estimated to be $674,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:
5th Aldermanic District
W. Townsend St. - N. 76th St. to N. 82nd St. (SM495110540): Sewer work prior to paving. (Nonassessable Sewer Maintenance Relay Fund -- $17,300, Additional Funds). The total estimated cost for this project including the requested amount is $37,300. This project is anticipated to be completed during the 2011 construction season.
10th Aldermanic District
S. 60th St. - W. Dickinson St. to W. Main St. (SM495110528): Sewer work prior to paving. (Nonassessable Sewer Maintenance Relay Fund -- $3,000, Additional Funds). The total estimated cost for this project including the requested amount is $20,000. This project is anticipated to be completed during the 2011 construction season.
11th Aldermanic District
W. Wedgewood Dr. - S. Sunset Dr. to S. Massachusetts Ave. (WT410120001): Relay water main. (Nonassessable Water Fund Budget Line 5010 -- $10,000; Nonassessable Water Fund Budget Line 6410 -- $10,000). The total estimated cost for this project including the requested amount is $280,000. This project is anticipated to be completed during the 2012 construction season.
12th Aldermanic District
E. Washington St. - S. Water St. to S. 1st St. (WT410120002): Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $7,000; Nonassessable Water Fund Budget Line 6410 -- $8,000). The total estimated cost for this project including the requested amount is $150,000. This project is anticipated to be completed during the 2012 construction season.
15th Aldermanic District
W. North Ave. - N. 8th St. to N. 9th St. (SM495110537): Sewer work prior to paving. (Nonassessable Sewer Maintenance Relay Fund -- $11,700, Additional Funds). The total estimated cost for this project including the requested amount is $21,700. This project is anticipated to be completed during the 2011 construction season.
Various Locations
Bridge Safety Inspection (BR100090102): (City Share Nonassessable Structure Fund -- $1,000, Additional Funds). The total estimated cost for this project including the requested amount is $165,000. This project is anticipated to be completed during the 2011 construction season.
;and, be it
Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.