File #: 980909    Version:
Type: Resolution Status: Passed
File created: 10/9/1998 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 10/30/1998
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations.
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS, PUBLIC IMPROVEMENTS, SIDEWALKS, STREET IMPROVEMENTS

NUMB:

980909

VERS:

SUBSTITUTE 1

XXBY:

THE CHAIR

TITL:

Substitute resolution determining it necessary to make various assessable public improvements at various locations.

ANLS:

-Analysis-

 

This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction.

BODY:

Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

 

1st Aldermanic District

 

Alley between W. Colfax Pl., W. Eggert Pl., N. 21st St. and N. 22nd St. (880-0838-1): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

 

3rd Aldermanic District

 

Alley between E. Auer Ave., N. Booth St., E. Concordia Ave., N. Pierce St. and CMC Real Estate Right-of-Way (880-0819-8): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

 

6th Aldermanic District

 

Alley between N. Buffum St., E. Center St., E. Clarke St., and N. Holton St. (880-0833-4): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

 

 Alley between N. Buffum St., E. Clarke St., N. Holton St. and E. Wright St. (880-0834-X): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

 

Alley between E. Clarke St., N. Fratney St., N. Pierce St. and E. Wright St. (880-0837-6): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

 

Alley between E. Concordia Ave., N. Palmer St., N. Richards St. and E. Townsend St. (880-0839-7): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

 

Alley between W. Keefe Ave., W. Vienna Ave., N. 4th St. and N. 5th St. (Northerly 200 ft. m/l) (880-0844-4): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

 

7th Aldermanic District

 

W. Lisbon Ave. - W. Appleton Ave. to N. 60th St. (892-1151-6): Paving the roadway with concrete. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work.

 

8th Aldermanic District

 

Alley between W. Hayes Ave., W. Lincoln Ave., S. 30th St. and S. 31st St. (East-West Leg) (880-0843-9): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

 

9th Aldermanic District

 

Alley between W. Custer Ave., W. Sheridan Ave., N. 35th St. and N. 36th St. (880-0840-2): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

 

Alley between W. Rohr Ave., W. Villard Ave., N. 35th St. and N. 36th St. (880-0845-X): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

 

Alley between W. Capitol Dr., W. Melvina St., N. 51st Blvd., N. 52nd St. (East-West Leg and Northerly 200 ft. m/l) (880-0835-5): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

 

 12th Aldermanic District

 

Alley between S. Cesar F. Chavez Dr., W. Mineral St., W. National Ave. and S. 17th St. (880-0836-0): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

 

14th Aldermanic District

 

E. Dover St. - S. Kinnickinnic Ave. to S. Howell Ave. (876-0419-0): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

 

Alley between S. Delaware Ave., E. Estes St., E. Trowbridge St. and S. Wentworth Ave. (880-0841-8): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

 

16th Aldermanic District

 

W. Highland Blvd. - N. 35th St. to W. Vliet St. (Excluding Structure) (870-0847-4): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

 

S. 92nd St. - Point south of W. Adler St. to the East-West Freeway (870-0846-9): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

 

S. 92nd St. - W. Chester St. to point north of W. Chester St. (960-0458-9): Doing a median. Doing all the necessary grading pertaining to said work.

 

17th Aldermanic District

 

N. 13th St. - W. North Ave. to W. Meinecke Ave. (870-0832-2): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

 

Alley between W. Galena St., W. Walnut St., N. 33rd St. and N. 34th St. (880-0842-3): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

 

 ;and, be it

 

Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it

 

Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works.

DFTR:

INFRASTRUCTURE SERVICES DIVISION

MGL:sdp

10-13-98