File #: 101437    Version:
Type: Resolution Status: Passed
File created: 3/23/2011 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 4/12/2011
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $266,000 for a total estimated cost of these projects being $3,906,000.
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS, STREET IMPROVEMENTS
Attachments: 1. Hearing Notice List
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
4/18/20111 MAYOR SIGNED   Action details Meeting details Not available
4/12/20111 COMMON COUNCIL ADOPTEDPass13:0 Action details Meeting details Not available
3/30/20110 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Individual appearing: Clark Wantoch, Department of Public Works-Infrastructure Proposed Substitute A accepted.
Pass5:0 Action details Meeting details Not available
3/30/20111 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTIONPass5:0 Action details Meeting details Not available
3/30/20111 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
3/28/20110 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
3/28/20110 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
3/28/20110 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
3/23/20110 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

101437

Version

Substitute 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $266,000 for a total estimated cost of these projects being $3,906,000.

Analysis

This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $266,000 with the total cost estimated to be $3,906,000.

Body

Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

 

1st Aldermanic District

 

W. Lawn Ave. - N. 13th St. to N. Green Bay Ave. (ST211090114):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000, Additional Funds).  The total estimated cost for this project including the requested amount is $450,000.  This project was completed 2010.  These funds are needed to close out the project.

 

2nd Aldermanic District

 

W. Stark St. - N. 64th St. to N. 68th St. (ST211110142):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $185,000.  This project is anticipated to be completed during the 2011 construction season.

 

N. 67th St. - W. Marion St. to W. Congress St. (ST211110108):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2012 construction season.

 

3rd Aldermanic District

 

N. Marietta Ave. - E. Locust St. to E. Kenwood Blvd. (ST211020144):  Paving the roadway with concrete.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $5,000, Additional Funds).  The total estimated cost for this project including the requested amount is $365,000.  This project is anticipated to be completed during the 2011 construction season.

 

Alley between E. Bradford Ave., N. Downer Ave., N. Stowell Ave., and E. Webster Pl. (ST212110103):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $15,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2011-2012 construction season.

 

5th Aldermanic District

 

W. Auer Ave. - N. 84th St. to N. 87th St. (ST211110125):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2011 construction season.

 

W. Nash St. - N. 96th St. to a point west of N. 100th St. (West City Limits) (ST211110133):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $13,000, Additional Funds).  The total estimated cost for this project including the requested amount is $178,000.  This project is anticipated to be completed during the 2012 construction season.

 

6th and 15th Aldermanic Districts

 

W. North Ave. - N. 7th St. to N. 9th St. (ST211110150):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $12,000).  The total estimated cost for this project including the requested amount is $220,000.  This project is anticipated to be completed during the 2011 construction season.

 

8th Aldermanic District

 

W. Lapham St. - S. Layton Blvd. to S. 29th St. (ST211110132):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $5,000, Additional Funds).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 24th St. - W. Scott St. to W. National Ave. (ST211120161):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $350,000.  This project is anticipated to be completed during the 2012 construction season.

 

11th Aldermanic District

 

S. 63rd St. - W. Stack Dr. to W. Cleveland Ave. (ST211110110):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $8,000, Additional Funds).  The total estimated cost for this project including the requested amount is $128,000.  This project is anticipated to be completed during the 2012 construction season.

 

12th Aldermanic District

 

W. Maple St. - S. 6th St. to S. 13th St. (ST211100109):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $18,000, Additional Funds).  The total estimated cost for this project including the requested amount is $550,000.  This project is anticipated to be completed during the 2011 construction season.

 

13th Aldermanic District

 

W. Euclid Ave. - S. 16th St. to S. 20th St. (ST211110129):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $140,000.  This project is anticipated to be completed during the 2011 construction season.

 

S. 18th St. - W. Morgan Ave. to W. Holt Ave. (ST211120103):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, Additional Funds).  The total estimated cost for this project including the requested amount is $105,000.  This project is anticipated to be completed during the 2012 construction season.

 

Alley between W. Morgan Ave., W. Ohio Ave., W. Verona Ct., S. 22nd St., and S. 24th St. (Union Pacific Railroad) (ST212030134):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $70,000, Additional Funds).  The total estimated cost for this project including the requested amount is $380,000.  This project is anticipated to be completed during the 2011 construction season.

 

14th Aldermanic District

 

S. Harbor Dr. - E. Bay St. to a point south of E. Jones St. (ST211100123):  Paving the roadway with asphalt.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $15,000, Additional Funds).  The total estimated cost for this project including the requested amount is $325,000.  This project is anticipated to be completed during the 2011-2012 construction season.

 

Alley between S. Ellen St., S. Kinnickinnic Ave., E. Morgan Ave., and E. Vollmer Ave. (ST212110104):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $15,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2011-2012 construction season.

 

15th Aldermanic District

 

N. 21st Ln. - W. Brown St. to a point north of W. Brown St. (ST211110149):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $5,000, Additional Funds).  The total estimated cost for this project including the requested amount is $35,000.  This project is anticipated to be completed during the 2012 construction season.

 

; and, be it

 

Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it

 

Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 