File #: 111024    Version:
Type: Resolution Status: Passed
File created: 11/30/2011 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 12/20/2011
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $694,000 for a total estimated cost of these projects being $23,362,000.
Sponsors: THE CHAIR
Indexes: SANITARY SEWERS, SEWER IMPROVEMENTS, STORM SEWERS
Attachments: 1. Hearing Notice List
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
12/27/20111 MAYOR SIGNED   Action details Meeting details Not available
12/20/20111 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
12/7/20111 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
12/7/20110 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Individual appearing: Mary Dziewiontkoski, Department of Public Works-Infrastructure Services Proposed Substitute A accepted.
Pass4:0 Action details Meeting details Not available
12/7/20111 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTIONPass4:0 Action details Meeting details Not available
12/5/20110 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
12/5/20110 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
11/30/20110 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
111024
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $694,000 for a total estimated cost of these projects being $23,362,000.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $694,000 with the total cost estimated to be $23,362,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:
 
1st and 6th Aldermanic Districts
 
W. Atkinson Ave. - W. Capitol Dr. to N. 20th St. (SM495110071):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $69,000.  This project is anticipated to be completed during the 2012 construction season.
 
W. Capitol Dr. (South Side) - N. 19th Pl. to N. 21st St. (SM495110077):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $112,000.  This project is anticipated to be completed during the 2012 construction season.
 
N. 20th St. (Various Locations) - W. Nash St. to W. Fiebrantz Ave. (SM495110069):  Sanitary sewer relay and lining and combined sewer relay.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $335,000.  This project is anticipated to be completed during the 2012 construction season.
 
3rd Aldermanic District
 
E. Auer Ave./E. Hampshire St. (Extended) at the Milwaukee River (WT410110782):  36-inch Joint Seal.  The total estimated cost for this project including the requested amount is $300,000.  This project is anticipated to be completed during the 2012 construction season.
 
E. Auer Ave. - N. Humboldt Blvd. to 575 feet m/l east of N. Dousman St. (SM495110056):  Combined sewer LD lining.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $639,000.  This project is anticipated to be completed during the 2012 construction season.
 
N. Humboldt Blvd. - E. Keefe Ave. to E. Auer Ave. (SM495110098):  Combined sewer relay and LD lining.  (Nonassessable Sewer Maintenance Relay Fund -- $20,000).  The total estimated cost for this project including the requested amount is $940,000.  This project is anticipated to be completed during the 2012 construction season.
 
E. Ogden Ave. - N. Jackson St. to N. Farwell Ave. (SM495110304):  Combined sewer relay and lining, and sanitary sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $435,000.  This project is anticipated to be completed during the 2012 construction season.
 
N. Stowell Ave. - E. Linnwood Ave. to E. Kenwood Blvd. (SM495110055):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $203,000.  This project is anticipated to be completed during the 2012 construction season.
 
N. Van Buren St. - E. Ogden Ave. to E. Wells St. (SM495110306):  Combined sewer relay and lining.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $472,000.  This project is anticipated to be completed during the 2012 construction season.
 
3rd and 4th Aldermanic Districts
 
N. Jackson St. - E. Ogden Ave. to E. Juneau Ave. (SM495110302):  Combined sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $172,000.  This project is anticipated to be completed during the 2012 construction season.
 
4th Aldermanic District
 
N. Broadway - E. Wells St. to E. St. Paul Ave. (SM495110301):  Combined sewer relay and lining.  (Nonassessable Sewer Maintenance Relay Fund -- $20,000).  The total estimated cost for this project including the requested amount is $893,000.  This project is anticipated to be completed during the 2012 construction season.
 
E. Kilbourn Ave. - N. Jackson St. to N. Van Buren St. (SM495110303):  Combined sewer relay and lining and sanitary sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $594,000.  This project is anticipated to be completed during the 2012 construction season.
 
E./W. St. Paul Ave. - N. 4th St. to N. Broadway (SM495110305):  Combined sewer LD lining and sanitary sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $472,000.  This project is anticipated to be completed during the 2012 construction season.
 
E. State St. - N. Jackson St. to N. Van Buren St. (SM495110307):  Sanitary sewer lining and combined sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $113,000.  This project is anticipated to be completed during the 2012 construction season.
 
E. Wells St. - N. Van Buren St. to N. Broadway (SM495110308):  Combined sewer lining and sanitary sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $533,000.  This project is anticipated to be completed during the 2012 construction season.
 
4th and 8th Aldermanic Districts
 
N. 26th St. - W. McKinley Blvd. to W. St. Paul Ave. (SM495110087):  Combined sewer slip lining.  (Nonassessable Sewer Maintenance Relay Fund -- $25,000).  The total estimated cost for this project including the requested amount is $8,484,000.  This project is anticipated to be completed during the 2012 construction season.
 
6th Aldermanic District
 
N. Dr. Martin Luther King Jr. Dr. - N. 6th St. (Extended) to N. 8th St. (SM495110100):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $332,000.  This project is anticipated to be completed during the 2012 construction season.
 
6th and 7th Aldermanic Districts
 
W. Chambers St. - N. 18th St. to N. 24th St. (SM495110060):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $25,000).  The total estimated cost for this project including the requested amount is $1,389,000.  This project is anticipated to be completed during the 2012 construction season.
 
7th Aldermanic District
 
W. Concordia Ave. - N. 38th St. to 230 feet m/l west of N. 38th St. (SM495110096):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $54,000.  This project is anticipated to be completed during the 2012 construction season.
 
N. Sherman Blvd. (East Side) - 220 feet m/l north of W. Roosevelt Dr. to W. Roosevelt Dr. (SM495110050):  Relaying storm sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $84,000.  This project is anticipated to be completed during the 2012 construction season.
 
Alley between W. Roosevelt Dr., N. Sherman Blvd., and N. 42nd St. (SM495110051):  Relaying storm sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $65,000.  This project is anticipated to be completed during the 2012 construction season.
 
8th Aldermanic District
 
S. 28th St. - W. Becher St. to W. Rogers St. (SM495120017):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2012 construction season.
 
S. 28th St. - W. Forest Home Ave. to W. Hayes Ave. (SM495110107):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $96,000.  This project is anticipated to be completed during the 2012 construction season.
 
S. 34th St. - W. National Ave. to W. Pierce St. (SM495110101):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $144,000.  This project is anticipated to be completed during the 2012 construction season.
 
S. 36th St. - W. Burnham St. to W. Maple St. (SM495120018):  Sanitary sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $10,000).  The total estimated cost for this project including the requested amount is $18,000.  This project is anticipated to be completed during the 2012 construction season.
 
10th Aldermanic District
 
W. Hadley St. - N. Emery Ave. to N. 67th St. (SM495110081):  Relaying sanitary and storm sewers.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $225,000.  This project is anticipated to be completed during the 2012 construction season.
 
N. Hartung Ave. - 200 feet m/l south of W. Lisbon Ave. to N. 67th St. (SM495110082):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $194,000.  This project is anticipated to be completed during the 2012 construction season.
 
W. Lisbon Ave. - N. 64th St. to N. 67th St./W. Girard Ave. (SM495110105):  Relaying storm sewer and sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $295,000.  This project is anticipated to be completed during the 2012 construction season.
 
W. Locust St. - W. Lisbon Ave./N. 66th St. to W. Appleton Ave. (SM495110104):  Relaying storm sewer and sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $611,000.  This project is anticipated to be completed during the 2012 construction season.
 
W. Wisconsin Ave. - N. 51st St. to N. 53rd St. (SM495110076):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $157,000.  This project is anticipated to be completed during the 2012 construction season.
 
N. 52nd St. - 170 feet m/l north of W. Blue Mound Rd. to W. Wisconsin Ave. (SM495110080):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $155,000.  This project is anticipated to be completed during the 2012 construction season.
 
N. 54th St. - W. Lloyd St. to W. North Ave. (SM495110070):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $231,000.  This project is anticipated to be completed during the 2012 construction season.
 
N. 58th St. - 325 feet m/l north of W. Meinecke Ave. to W. Lisbon Ave. (SM495110088):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $254,000.  This project is anticipated to be completed during the 2012 construction season.
 
N. 67th St. - W. Center St. to W. Lisbon Ave. (SM495110083):  Relaying sanitary and storm sewers.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $378,000.  This project is anticipated to be completed during the 2012 construction season.
 
N. 70th St. - W. Center St. to W. Locust St. (SM495110092):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2012 construction season.
 
11th Aldermanic District
 
Area bounded by W. Crawford Ave., W. St. Francis Ave., S. 46th St., and S. 50th St. (SM494110107):  Sanitary sewer lining.  (Infiltration/Inflow Reduction Fund -- $15,000).  The total estimated cost for this project including the requested amount is $209,000.  This project is anticipated to be completed during the 2012 construction season.
 
12th Aldermanic District
 
W. Grant St. - S. 10th Pl. to S. 15th St. (SM495110091):  Combined sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $274,000.  This project is anticipated to be completed during the 2012 construction season.
 
S. 4th St. - W. Washington St. to W. Mineral St. (SM495110094):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $120,000.  This project is anticipated to be completed during the 2012 construction season.
 
13th Aldermanic District
 
S. 17th St. - W. Euclid Ave. to W. Oklahoma Ave. (SM495110058):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $187,000.  This project is anticipated to be completed during the 2012 construction season.
 
14th Aldermanic District
 
S. Hanson Ave. - 190 feet m/l north of E. Euclid Ave. to E. Oklahoma Ave. (SM495110089):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $102,000.  This project is anticipated to be completed during the 2012 construction season.
 
S. Linebarger Terr. - E. Iron St. to E. Pryor Ave. (SM495110095):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $106,000.  This project is anticipated to be completed during the 2012 construction season.
 
E. Oklahoma Ave. - S. Nevada Ave. to S. Hanson Ave. (SM495110090):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $62,000.  This project is anticipated to be completed during the 2012 construction season.
 
S. Whitnall Ave. - E. Norwich St. to E. Howard Ave. (SM495110097):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $141,000.  This project is anticipated to be completed during the 2012 construction season.
 
S. 8th St. - W. Euclid Ave. to W. Holt Ave. (SM495110106):  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $12,000).  The total estimated cost for this project including the requested amount is $255,000.  This project is anticipated to be completed during the 2012 construction season.
 
15th Aldermanic District
 
W. Brown St. - N. 33rd St. to N. 36th St. (SM495110093):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $167,000.  This project is anticipated to be completed during the 2012 construction season.
 
N. 33rd St. - W. Center St. to W. Hadley St. (SM495110079):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $118,000.  This project is anticipated to be completed during the 2012 construction season.
 
N. 41st St. - W. Center St. to W. Hadley St. (SM495100124):  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost for this project including the requested amount is $308,000.  This project is anticipated to be completed during the 2012 construction season.
 
Various Aldermanic Districts
 
Asphalt resurfacing of various streets by contract (ST211120177):  The total estimated cost for this project is $600,000.  This project is anticipated to be completed during the 2012 construction season.
 
Asphalt resurfacing of various streets by contract (ST211120178):  The total estimated cost for this project is $500,000.  This project is anticipated to be completed during the 2012 construction season.
 
Sealcoating of various streets by contract (ST211120179):  The total estimated cost for this project is $300,000.  This project is anticipated to be completed during the 2012 construction season.
 
Crackfilling of various streets by contract (ST211120180):  The total estimated cost for this project is $200,000.  This project is anticipated to be completed during the 2012 construction season.
 
;and, be it
 
Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it
 
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
 
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
 
Requestor
Infrastructure Services Division
Drafter
MLD:dr
Npr 5
12/2/2011
 
1/10/12  Technical correction to account numbers.  dkf