File #: 111283    Version:
Type: Resolution Status: Passed
File created: 1/18/2012 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 2/7/2012
Effective date:    
Title: Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $11,544,000 for a total estimated cost of these projects being $11,691,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SANITARY SEWERS, SEWER IMPROVEMENTS
Attachments: 1. Hearing Notice List
Number
111283
Version
Substitute 1
Reference
100723
Sponsor
THE CHAIR
Title
Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $11,544,000 for a total estimated cost of these projects being $11,691,000.
Analysis
This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works.  The City cost of the projects approved by this resolution is estimated to be $11,544,000.  The total estimated cost of these projects is $11,691,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and
 
Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:
 
1st Aldermanic District
 
N. 19th St. - W. Capitol Dr. to W. Fiebrantz Ave. (SM495100208) File Number 100723:  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $119,000).  The total estimated cost for this project including the requested amount is $134,000.  This project is anticipated to be completed during the 2012 construction season.
 
1st and 6th Aldermanic Districts
 
W. Atkinson Ave. - W. Capitol Dr. to N. 20th St. (SM495110071) File Number 111024:  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $66,000).  The total estimated cost for this project including the requested amount is $78,000.  This project is anticipated to be completed during the 2012 construction season.
 
W. Capitol Dr. (south side) - N. 19th Pl. to N. 21st St. (SM495110077) File Number 111024:  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $97,000).  The total estimated cost for this project including the requested amount is $112,000.  This project is anticipated to be completed during the 2012 construction season.
 
N. 20th St. - (Various Locations) - W. Nash St. to W. Fiebrantz Ave. (SM495110069) File Number 111024:  Sanitary sewer relay and lining, and relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $338,000).  The total estimated cost for this project including the requested amount is $353,000.  This project is anticipated to be completed during the 2012 construction season.
 
4th and 8th Aldermanic Districts
 
N. 26th St. - W. McKinley Blvd. to W. St. Paul Ave. (SM495110087) File Number 111024:  Combined sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $9,645,000).  The total estimated cost for this project including the requested amount is $9,670,000.  This project is anticipated to be completed during the 2012 construction season.
 
7th Aldermanic District
 
N. 39th St. - N. Sercombe Rd. to W. Marion St. (SM495100206) File Number 100723:  Sanitary sewer relay and lining.  (Nonassessable Sewer Maintenance Relay Fund -- $59,000).  The total estimated cost for this project including the requested amount is $74,000.  This project is anticipated to be completed during the 2012 construction season.
 
N. 40th St. - 270 feet m/l south of W. Marion St. to W. Congress St. (SM495100186) File Number 100723:  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $143,000).  The total estimated cost for this project including the requested amount is $158,000.  This project is anticipated to be completed during the 2012 construction season.
 
N. 47th St. - W. Locust St. to 115 feet m/l north of W. Chambers St. (SM495100187) File Number 100723:  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $187,000).  The total estimated cost for this project including the requested amount is $202,000.  This project is anticipated to be completed during the 2012 construction season.
 
7th and 10th Aldermanic Districts
 
N. 50th St. - N. Gengler Cr. to W. Townsend St. (SM495110003) File Number 110834:  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $450,000).  The total estimated cost for this project including the requested amount is $465,000.  This project is anticipated to be completed during the 2012 construction season.
 
15th Aldermanic District
 
W. Center St. - W. Fond du Lac Ave. to N. 35th St., and W. Townsend St. - W. Hopkins St. to N. 35th St. (ST211120186) File Number 111282:  (Hot in place asphalt project).  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $350,000).  The total estimated cost for this project is $350,000.  This project is anticipated to be completed during the 2012 construction season.
 
Various Aldermanic Districts
 
2012 Sanitary Manhole Inspection project.  (SM494120101) File Number 111282:  City wide.  (Infiltration/Inflow Reduction Fund -- $90,000).  The total estimated cost for this project including the requested amount is $95,000.  This project is anticipated to be completed during the 2012 construction season.
 
now, therefore, be it
 
Resolved, By the Common Council of the City of Milwaukee that the Commissioner of Public Works is authorized and directed to proceed with said work; and, be it
 
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
 
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
 