Title: Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $7,944,319.45 for a total estimated cost of these projects being $9,128,800.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Hearing Notice List, 2. Capital Grant Resolution Certification
Number
131588
Version
Substitute 1
Reference
131587
Sponsor
THE CHAIR
Title
Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $7,944,319.45 for a total estimated cost of these projects being $9,128,800.
Analysis
This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works.  The City cost of the projects approved by this resolution is estimated to be $7,944,319.45.  The total estimated cost of these projects is $9,128,800.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and
 
Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:
 
1st Aldermanic District
 
W. Hampton Ave. - N. 18th St. to N. 23rd St. (WT410140012) File Number 131587:  Hydrant alteration.  (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $103,000).  The total estimated cost for this project including the requested amount is $120,000.  This project is anticipated to be completed during the 2014 construction season.
 
5th Aldermanic District
 
N. Granville Rd. Bridge over the Little Menomonee River and approaches (BR30280801,ST30280801) (2500-00-00) File Number 080731:  Bridge removal, roadway approach removal, grading, restoration of entire site.
 
Grantor Non-reimbursable Paving Fund -- $ 61,266.40
Grantor Reimbursable Paving Fund -- $9,189.96
City Share Non-assessable Paving Fund -- $17,614.09
 
Grantor Non-reimbursable Structure Fund -- $ 74,608.00
Grantor Reimbursable Structure Fund -- $11,191.20
City Share Non-assessable Structure Fund -- $21,449.80
 
These funds are to be transferred to the construction accounts (BR302808XX,
ST302808XX) (2500-00-70)
 
Previously authorized for bridge construction -- $ 0.00
 
Current estimated cost of total project including this resolution -- $708,800
 
Original estimated cost of total project (File Number 920154) - $360,000
 
This project is anticipated to be completed during the 2014 construction season.
 
6th Aldermanic District
 
N. 3rd St. - W. Concordia Ave. to W. Keefe Ave. (SM495140013) File Number 131475:  Combined sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $63,000).  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2014 construction season.
 
7th Aldermanic District
 
W. Nash St. - 130 feet m/l east of N. 52nd St. to 130 feet m/l west of N. 53rd St. (SM495140014) File Number 131475:  Relaying storm sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $108,000).  The total estimated cost for this project including the requested amount is $120,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. 39th St. - W. Fond du Lac Ave./W. Concordia Ave. to W. Townsend St. (SM495140011) File Number 131475:  Sanitary Sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $48,000).  The total estimated cost for this project including the requested amount is $60,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. 52nd St. - W. Nash St. to W. Vienna Ave. (SM495140010) File Number 131475:  Relaying storm sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $170,000).  The total estimated cost for this project including the requested amount is $185,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. 53rd St. - W. Keefe Ave. to W. Vienna Ave. (SM495140009) File Number 131475:  Relaying storm sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $315,000).  The total estimated cost for this project including the requested amount is $330,000.  This project is anticipated to be completed during the 2014 construction season.
 
N. 55th St. - W. Vienna Ave. to 170 feet m/l north of W. Vienna Ave. (Various Locations) (SM495140008) File Number 131475:  Relaying storm sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $148,000).  The total estimated cost for this project including the requested amount is $160,000.  This project is anticipated to be completed during the 2014 construction season.
 
8th Aldermanic District
 
W. Arthur Ave. - S. 33rd St. to S. 35th St. (WT410140688) File Number 130688:  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $15,000; Nonassessable Water Fund Budget Line 6410 -- $245,000).  The total estimated cost for this project including the requested amount is $275,000.  This project is anticipated to be completed during the 2014 construction season.
 
W. Hayes Ave. - S. 33rd St. to S. 35th St. (WT410140687) File Number 130599:  Relaying water main.  (Nonassessable Water Fund Budget Line 5010 -- $14,000; Nonassessable Water Fund Budget Line 6410 -- $246,000).  The total estimated cost for this project including the requested amount is $275,000.  This project is anticipated to be completed during the 2014 construction season.
 
W. Pierce St. - S. Layton Blvd. to S. 22nd St. (SM495130087) File Number 130868:  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $455,000).  The total estimated cost for this project including the requested amount is $470,000.  This project is anticipated to be completed during the 2014 construction season.
 
S. 28th St. - 150 feet m/l south of W. Evergreen Ln. to 400 feet m/l south of W. National Ave. (SM495120040) File Number 111577:  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $340,000).  The total estimated cost for this project including the requested amount is $365,000.  This project is anticipated to be completed during the 2014 construction season.
 
10th Aldermanic District
 
W. Dixon St. - 150 feet m/l east of S. 61st St. to 150 feet m/l west of S. 61st St. (SM495140037) File Number 131587:  Relaying sanitary and storm sewers.  (Nonassessable Sewer Maintenance Relay Fund -- $133,000).  The total estimated cost for this project including the requested amount is $145,000.  This project is anticipated to be completed during the 2014 construction season.
 
W. Wright St. - N. 56th St. to N. 57th St. (SM495120113) File Number 130868:  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $59,000).  The total estimated cost for this project including the requested amount is $71,000.  This project is anticipated to be completed during the 2014 construction season.
 
S. 61st St. - 140 feet m/l north of W. Dixon St. to W. Dixon St. (SM495140036) File Number 131587:  Relaying sanitary and storm sewers.  (Nonassessable Sewer Maintenance Relay Fund -- $108,000).  The total estimated cost for this project including the requested amount is $120,000.  This project is anticipated to be completed during the 2014 construction season.
 
11th Aldermanic District
 
S. 30th St. (East Side) - W. Euclid Ave. to W. Oklahoma Ave. (SM495100031) File Number 091131:  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $358,000).  The total estimated cost for this project including the requested amount is $370,000.  This project is anticipated to be completed during the 2014 construction season.
 
S. 31st St. - W. Euclid Ave. to W. Oklahoma Ave. (SM495100030) File Number 091131:  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $228,000).  The total estimated cost for this project including the requested amount is $240,000.  This project is anticipated to be completed during the 2014 construction season.
 
S. 43rd St. - W. Dakota St. to W. Cleveland Ave. (SM495140019) File Number 131475:  Storm sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $185,000).  The total estimated cost for this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2014 construction season.
 
S. 81st St. - W. Holt Ave. to W. Morgan Ave. (SM495140020) File Number 131475:  Sanitary Sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $58,000).  The total estimated cost for this project including the requested amount is $70,000.  This project is anticipated to be completed during the 2014 construction season.
 
11th and 13th Aldermanic Districts
 
S. 27th St. - 930 feet north of W. Oklahoma Ave. to W. Howard Ave. (WT410130016) File Number 130146:  Hydrant alteration.  (Nonassessable Water Fund Budget Line 5010 -- $3,000, Additional Funds;  Nonassessable Water Fund Budget Line 6410 -- $52,000, Additional Funds)  The total estimated cost for this project including the requested amount is $145,000.  This project is anticipated to be completed during the 2014 construction season.
 
12th Aldermanic District
 
E. Anderson Ave. - S. 1st St. to 400 feet m/l east of S. 1st St. (SM495140038) File Number 131587:  Combined sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $78,000).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2014 construction season.
 
S. 5th St. (ext'd) - 90 feet m/l north of W. Florida St. to 150 feet m/l south of W. Florida St. (SM495140029) File Number 131587:  Combined sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $99,000).  The total estimated cost for this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2014 construction season.
 
13th Aldermanic District
 
E. Bolivar Ave. (Various Locations) - S. Austin St. to S. Pine Ave. (SM495110019) File Number 101350:  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $315,000).  The total estimated cost for this project including the requested amount is $330,000.  This project is anticipated to be completed during the 2014 construction season.
 
W. Morgan Ave. - S. 15th St. to S. 15th Pl. (SM495130082) File Number 130688:  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $73,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2014 construction season.
 
W. Ohio Ave. - S. 19th St. to S. 20th St. (SM495130040) File Number 130041:  Relaying sanitary and storm sewers.  (Nonassessable Sewer Maintenance Relay Fund -- $115,000).  The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2014 construction season.
 
S. 20th St. - W. Morgan Ave. to W. Ohio Ave. (SM495130041) File Number 130041:  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $315,000).  The total estimated cost for this project including the requested amount is $330,000.  This project is anticipated to be completed during the 2014 construction season.
 
13th and 14th Aldermanic Districts
 
S. 15th St. - W. Oklahoma Ave. to W. Morgan Ave. (SM495130081) File Number 130688:  Relaying sanitary and storm sewers.  (Nonassessable Sewer Maintenance Relay Fund -- $858,000).  The total estimated cost for this project including the requested amount is $870,000.  This project is anticipated to be completed during the 2014 construction season.
 
14th Aldermanic District
 
S. Griffin Ave. - E. Ohio Ave. to E. Euclid Ave. (SM495140015) File Number 131475:  Relaying sanitary and storm sewers.  (Nonassessable Sewer Maintenance Relay Fund -- $625,000).  The total estimated cost for this project including the requested amount is $640,000.  This project is anticipated to be completed during the 2014 construction season.
 
S. Hanson Ave. - 190 feet m/l north of E. Euclid Ave. to E. Oklahoma Ave. (SM495110089) File Number 111024:  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $115,000).  The total estimated cost for this project including the requested amount is $130,000.  This project is anticipated to be completed during the 2014 construction season.
 
S. Kansas Ave. - E. Saveland Ave. to E. Warnimont Ave. (SM495120048) File Number 131076:  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $216,000).  The total estimated cost for this project including the requested amount is $240,000.  This project is anticipated to be completed during the 2014 construction season.
 
S. New York Ave. - E. Fernwood Ave. to E. Ohio Ave. (SM495120083) File Number 120702:  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $198,000).  The total estimated cost for this project including the requested amount is $210,000.  This project is anticipated to be completed during the 2014 construction season.
 
E. Ohio Ave. - S. Pennsylvania Ave. to S. New York Ave. (SM495130099) File Number 131076:  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $62,000).  The total estimated cost for this project including the requested amount is $72,000.  This project is anticipated to be completed during the 2014 construction season.
 
E. Ohio Ave. - S. Whitnall Ave. to S. Griffin Ave. (SM495140028) File Number 131475:  Relaying sanitary and storm sewers.  (Nonassessable Sewer Maintenance Relay Fund -- $180,000).  The total estimated cost for this project including the requested amount is $192,000.  This project is anticipated to be completed during the 2014 construction season.
 
E. Oklahoma Ave. - S. Nevada St. to S. Hanson Ave. (SM495110090) File Number 111024:  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund - $65,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2014 construction season.
 
E. Tripoli Ave. - 350 feet m/l east of S. Clement Ave. to S. Clement Ave. (SM495100011) File Number 090971:  Storm sewer lining.  (Nonassessable Sewer Maintenance Relay Fund -- $38,000).  The total estimated cost for this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2014 construction season.
 
E. Warnimont Ave. - S. Brust Ave. to 200 feet east of S. Brust Ave. (WT410140692) File Number 131587:  Relaying water main.  (Nonassessable Water Fund Budget Line 6410 -- $70,000).  The total estimated cost for this project including the requested amount is $85,000.  This project is anticipated to be completed during the 2014 construction season.
 
E. Warnimont Ave. - S. Kansas Ave. to S. Brust Ave. (SM495120047) File Number 120371:  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $153,000).  The total estimated cost for this project including the requested amount is $165,000.  This project is anticipated to be completed during the 2014 construction season.
 
E. Wilbur Ave. - S. Alabama Ave. to S. Kansas Ave. (SM495120049) File Number 120371:  Relaying sanitary sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $70,000).  The total estimated cost for this project including the requested amount is $80,000.  This project is anticipated to be completed during the 2014 construction season.
 
S. 6th St. - W. Manitoba St. to W. Euclid Ave. (SM495130005) File Number 121332:  Sanitary and relaying storm sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $425,000).  The total estimated cost for this project including the requested amount is $440,000.  This project is anticipated to be completed during the 2014 construction season.
 
S. 9th St. - W. Dakota St. to W. Montana St. (SM495130020) File Number 121552:  Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $168,000).  The total estimated cost for this project including the requested amount is $180,000.  This project is anticipated to be completed during the 2014 construction season.
 
City of Greenfield
 
S. 60th St. - W. Allerton Ave. to 1,236 feet south of W. Layton Ave. (WT410130676) File Number 130363:  Hydrant alteration.  (Nonassessable Water Fund Budget Line 5010 -- $2,000, Additional Funds; Nonassessable Water Fund Budget Line 6410 -- $53,000, Additional Funds).  The total estimated cost for this project including the requested amount is $125,000.  This project is anticipated to be completed during the 2014 construction season.
 
now, therefore, be it
 
Resolved, By the Common Council of the City of Milwaukee that the Commissioner of Public Works is authorized and directed to proceed with said work; and, be it
 
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
 
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
 
Requestor
Infrastructure Services Division