Number
241882
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $1,225,000 for a total estimated cost of these projects being $12,340,000.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $1,225,000 with the total cost estimated to be $12,340,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:
1st Aldermanic District
N. 32nd St. - W. Bobolink Ave. to W. Wren Ave. (WT410260629) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $110,000. This project is anticipated to be completed during the 2026 construction season.
N. 32nd St. - W. Sheridan Ave. to W. Silver Spring Dr. (WT410260614) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $205,000. This project is anticipated to be completed during the 2026 construction season.
N. 38th St. - W. Villard Ave. to W. Rohr Ave. (WT410260617) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $225,000. This project is anticipated to be completed during the 2026 construction season.
W. Fairmount Ave. - N. 27th St. to N. 28th St. (WT410260606) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $120,000. This project is anticipated to be completed during the 2026 construction season.
N. Long Island Dr. - N. 20th St. to W. Neil Pl. (ST211250133) Paving the roadway with concrete. Laying a concrete curb and gutter. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund- $20,000). The total estimated cost for this project including the requested amount is $400,000. This project is anticipated to be completed during the 2025 construction season.
W. Oriole Dr. - N. Teutonia Ave. to N. 32nd St. (WT410260630) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $100,000. This project is anticipated to be completed during the 2026 construction season.
2nd Aldermanic District
W. Fond du Lac Ave. (Northside) - N. 87th St. to W. Flagg Ave. (WT410260624) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $29,000). The total estimated cost of this project including the requested amount is $395,000. This project is anticipated to be completed during the 2026 construction season.
3rd Aldermanic District
N. Prospect Ave. - E. Bradford Ave. to E. Belleview Pl. (WT410260603) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $29,000). The total estimated cost of this project including the requested amount is $305,000. This project is anticipated to be completed during the 2026 construction season.
N. Weil St. - E. Auer Ave. to E. Concordia Ave. (WT410260601) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $235,000. This project is anticipated to be completed during the 2026 construction season.
N. Weil St. - E. Wright St. to E. Clarke St. (WT410260619) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $240,000. This project is anticipated to be completed during the 2026 construction season.
4th Aldermanic District
N. 17th St. - W. Clybourn St. to W. Wisconsin Ave. (WT410260616) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $29,000). The total estimated cost of this project including the requested amount is $310,000. This project is anticipated to be completed during the 2026 construction season.
W. Mt. Vernon Ave. - N. 13th St. to N. 17th St. (WT410260626) Relaying water main and lining. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $39,000). The total estimated cost of this project including the requested amount is $560,000. This project is anticipated to be completed during the 2026 construction season.
5th Aldermanic District
N. 100th St. - W. Grantosa Dr. to W. Congress St. (North) (WT410260625) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $39,000). The total estimated cost of this project including the requested amount is $540,000. This project is anticipated to be completed during the 2026 construction season.
6th Aldermanic District
N. 8th St. - W. Concordia Ave. to W. Keefe Ave. (WT410260622) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $29,000). The total estimated cost of this project including the requested amount is $355,000. This project is anticipated to be completed during the 2026 construction season.
N. 10th St. - W. Ring St. to W. Keefe Ave. (WT410260611) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $39,000). The total estimated cost of this project including the requested amount is $510,000. This project is anticipated to be completed during the 2026 construction season.
E. Auer Ave. - N. Booth St. to N. Fratney St. (WT410260610) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $225,000. This project is anticipated to be completed during the 2026 construction season.
W. Concordia Ave. - N. Dr. Martin Luther King Jr. Dr. to N. 6th St. (WT410260613) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $230,000. This project is anticipated to be completed during the 2026 construction season.
W. Ring St. - N. 9th St. to N. 10th St. (WT410260612) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $120,000. This project is anticipated to be completed during the 2026 construction season.
E. Townsend St. - N. Hubbard St. to N. Buffum St. (WT410260607) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $225,000. This project is anticipated to be completed during the 2026 construction season.
7th Aldermanic District
N. 51st St. - W. Center St. to W. Hadley St. (WT410260615) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $235,000. This project is anticipated to be completed during the 2026 construction season.
8th Aldermanic District
S. 20th St. - 180’ south of W. Becher St. to W. Lincoln Av. (WT410260620) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $29,000). The total estimated cost of this project including the requested amount is $385,000. This project is anticipated to be completed during the 2026 construction season.
S. 23rd St. - W. Scott St. to W. Orchard St. (WT410260609) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $29,000). The total estimated cost of this project including the requested amount is $395,000. This project is anticipated to be completed during the 2026 construction season.
S. 26th St. - W. Scott St. to W. Greenfield Ave. (WT410260621) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $255,000. This project is anticipated to be completed during the 2026 construction season.
S. 31st St. - W. National Ave. to W. Pierce St. (WT410260618) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $240,000. This project is anticipated to be completed during the 2026 construction season.
11th Aldermanic District
W. Morgan Ave. - S. 76th St. to S. 84th St. (WT410260628) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $59,000). The total estimated cost of this project including the requested amount is $915,000. This project is anticipated to be completed during the 2026 construction season.
12th Aldermanic District
E. Maple St. - S. Kinnickinnic Ave. to 125’ east of S. Kinnickinnic Ave. (WT410260623) Abandoning water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $19,000). The total estimated cost of this project including the requested amount is $55,000. This project is anticipated to be completed during the 2026 construction season.
13th Aldermanic District
S. 13th St. - W. Barnard Ave. to W. Holmes Ave. (WT410260627) Relaying water main. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $34,000). The total estimated cost of this project including the requested amount is $425,000. This project is anticipated to be completed during the 2026 construction season.
15th Aldermanic District
N. 19th St. - W. Walnut St. to W. Vine St. (WT410260604) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $255,000. This project is anticipated to be completed during the 2026 construction season.
N. 37th St. - W. Kilbourn Ave. to W. State St. (WT410260605) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $220,000. This project is anticipated to be completed during the 2026 construction season.
N. 55th St. - W. Meinecke Ave. to W. Wright St. (WT410260608) Relaying water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $24,000). The total estimated cost of this project including the requested amount is $235,000. This project is anticipated to be completed during the 2026 construction season.
W. Juneau Ave. - N. 24th St. to N. 27th St. (WT410260602) Abandoning water main and lead replacement of service. (Nonassessable Water Fund Budget Line 5010 -- $1,000. Nonassessable Water Fund Budget Line 6410 -- $34,000). The total estimated cost of this project including the requested amount is $440,000. This project is anticipated to be completed during the 2026 construction season.
City Wide
ADA ramps for 2026 High impact paving north-side projects: (ST216250110) Replace curb and gutter and sidewalk as necessary (Nonassessable High Impact Paving Fund - $75,000). The total estimated cost of this project including the requested amount is $1,000,000. This project is anticipated to be completed during the 2026 construction season.
ADA ramps for 2026 High impact paving south-side projects: (ST216250111) Replace curb and gutter and sidewalk as necessary (Nonassessable High Impact Paving Fund - $75,000). The total estimated cost of this project including the requested amount is $1,000,000. This project is anticipated to be completed during the 2026 construction season.
Administration cost for 2025 Bike Infrastructure engineering (ST260250001) (Nonassessable Bike Infrastructure Fund -- $100,000 additional funds). The total 2025 budget for the Bike Infrastructure program is $750,000.
Water Alterations Developer Funded (WT410240300) File Number 231298: Water main alterations. (Nonassessable Water Fund Budget Line 5010 -- $0. Nonassessable Water Fund Budget Line 6410 - $100,000 additional funds). The total estimated cost of this project including the requested amount is $125,000. This project is anticipated to be completed during the 2025 construction season
;and, be it
Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it
Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.
Requestor
Infrastructure Services Division
Drafter
Holly Rutenbeck
NPR 10 Sub
4/4/2025