File #: 110567    Version:
Type: Resolution Status: Passed
File created: 9/1/2011 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 9/20/2011
Effective date:    
Title: Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $13,000 for a total estimated cost of these projects being $62,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SEWER IMPROVEMENTS, SEWERS
Attachments: 1. Proposed Substitute A, 2. Hearing Notice List
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
9/29/20111 MAYOR SIGNED   Action details Meeting details Not available
9/20/20111 COMMON COUNCIL ADOPTEDPass14:0 Action details Meeting details Not available
9/16/20111 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
9/13/20110 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Individual appearing: Clark Wantoch, Department of Public Works-Infrastructure Proposed Substitute B was accepted.
Pass4:0 Action details Meeting details Not available
9/13/20111 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTIONPass4:0 Action details Meeting details Not available
9/7/20110 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
9/1/20110 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

110567

Version

Substitute 1

Reference

100960

Sponsor

THE CHAIR

Title

Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $13,000 for a total estimated cost of these projects being $62,000.

Analysis

This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works.  The City cost of the projects approved by this resolution is estimated to be $13,000.  The total estimated cost of these projects is $62,000.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and

 

Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:

 

4th Aldermanic District

 

N. Water St. and E. Erie St. Intersection File Number 100960:  Decorative crosswalks with Street Print XD stamped asphalt.  Work to be undertaken in conjunction with previously approved asphalt resurfacing project (ST211110168).  The construction cost will be donated by Poblocki Paving Corp.  The total estimated cost for this project is $15,000.  This project is anticipated to be completed during the 2011 construction season.

 

8th and 12th Aldermanic Districts

 

S. 21st St. - W. Scott St. to W. Mineral St. (ST214110108) File Number 110566:  Install traffic calming devices.  (Developer Paving Fund -- $5,000; Nonassessable Reconstruction Paving Fund -- $3,000, ST211110184).  The total estimated cost for this project is $8,000.  This project is anticipated to be completed during the 2011 construction season.

 

11th Aldermanic District

 

S. 60th St. at W. Cold Spring Rd. (Sponsored by the City of Greenfield) (ST211100162) File Number 100724:  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $1,000, Additional Funds).  The total estimated cost for this project including the requested amount is $7,000.  This project was completed in 2010.

 

S. 63rd St. - W. Eden Pl. to W. Morgan Ave. (SM495110514) File Number 110028:  Sewer work prior to paving.  (Nonassessable Sewer Maintenance Relay Fund -- $4,000, Additional Funds).  The total estimated cost for this project including the requested amount is $32,000.  This project is anticipated to be completed during the 2011 construction season.

 

now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee that the Commissioner of Public Works is authorized and directed to proceed with said work; and, be it

 

Further Resolved, That the City of Milwaukee accepts the donation from Poblocki Paving Corp. for the cost of the decorative crosswalks with Street Print XD at the intersection of N. Water St. and E. Erie St.; and be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

MLD:dr

Nfr 1

09/13/2011