File #: 111476    Version:
Type: Resolution Status: Passed
File created: 2/28/2012 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 3/20/2012
Effective date:    
Title: Substitute resolution authorizing city-wide sidewalk replacement at Scattered Sites and appropriating funds for these purposes with the city construction cost estimated to be $640,000 for a total estimated cost of these projects being $690,000.
Sponsors: THE CHAIR
Indexes: SIDEWALK IMPROVEMENTS, SIDEWALKS
Attachments: 1. Hearing Notice List
Number
111476
Version
SUBSTITUTE 1
 
Reference
 
Sponsor
Ald. Bauman
Title
Substitute resolution authorizing city-wide sidewalk replacement at Scattered Sites and appropriating funds for these purposes with the city construction cost estimated to be $640,000 for a total estimated cost of these projects being $690,000.
Analysis
To provide the necessary authority for sidewalk repairs at Scattered Sites.  The City cost of these projects approved by this resolution is estimated to be $640,000.  The total estimated cost of these projects is $690,000.
Body
Whereas, It is necessary and in the public interest to replace those sidewalk stones which are cracked, broken, out of grade or otherwise a hazard to pedestrians; and
 
Whereas, It is proposed that sidewalk replacement work be done in the following locations at the indicated cost:
 
City Wide
 
Scattered Site Area #1 North  (ST230120141) File Number 111022:  Laying concrete walk.  Doing all necessary grading pertaining to said work.  ($25,000 to the Assessable Sidewalk Fund ST230120141; and $200,000 to the Nonassessable Sidewalk Fund ST230120141).  The total estimated cost for this project including the requested amount is $275,000.  This project is anticipated to be completed during the 2012 construction season.
 
Scattered Site Area #2 South-West (ST230120142):  Laying concrete walk.  Doing all necessary grading pertaining to said work.  ($25,000 to the Assessable Sidewalk Fund ST230120142; and $200,000 to the Nonassessable Sidewalk Fund ST230120142).  The total estimated cost for this project including the requested amount is $225,000.  This project is anticipated to be completed during the 2012 construction season.
 
Scattered Site Area #3 Central and South-East (ST230120143):  Laying concrete walk.  Doing all necessary grading pertaining to said work.  ($15,000 to the Assessable Sidewalk Fund ST230120143; and $175,000 to the Nonassessable Sidewalk Fund ST230120143).  The total estimated cost for this project including the requested amount is $190,000.  This project is anticipated to be completed during the 2012 construction season.
 
Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it
 
Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it
 
Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it
 
Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work.
 
Requestor
INFRASTRUCTURE SERVICES DIVISION
Drafter
MLD:dr
03/02/2012
SDWLK REPLACEMENT and
SCATTERED SITES