File #: 061289    Version:
Type: Resolution Status: Passed
File created: 2/6/2007 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 2/27/2007
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $96,000 for a total estimated cost of these projects being $1,577,700.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Infrastructure Services Division Cover Letter.pdf

Number

061289

Version

SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $96,000 for a total estimated cost of these projects being $1,577,700.

Analysis

This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $96,000 with the total cost estimated to be $1,577,700.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

 

1st Aldermanic District

 

N. 27th St. - W. Villard Ave. to a Pt. North of W. Silver Spring Dr. (ST211060102): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $ 5,000 additional funds).  File Number 051660 authorized $41,000.  The total estimated engineering cost for this project including the requested amount is $46,000.  The total estimated cost for this project including the requested amount is $476,000. This project is anticipated to be completed during the 2007 construction season.

 

3rd Aldermanic District

 

Alley between E. Belleview Pl., N. Prospect Ave., N., Stowell Ave. and E. Webster Pl.    (ST212070102):   Paving the alley with concrete.   Doing all the necessary  grading  pertaining to said work.  (Nonassessable Alley Paving  Fund -- $3,000 additional funds).  File Number 051328 authorized $7,000.  The total estimated engineering cost for this project including the requested amount is $10,000.  The total estimated cost for this project including the requested amount is $45,000. This project is anticipated to be completed during the 2007 construction season.

 

N. Commerce St. - E. North Ave. to 300 feet m/l north of E. North Ave. (WT410071090):  Water main extension. (Nonassessable Water Fund -- $15,000)  The total estimated cost for this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2007 construction season.

 

E. North Ave. - 275 feet m/l east of N. Humboldt Ave. to N. Commerce St. (WT410071091):  Water main extension.  (Nonassessable Water Fund -- $15,000)  The total estimated cost for this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2007 construction season.

 

5th Aldermanic District

 

Alley Between W. Congress St., W. Lawrence Ave., N. 88th St., and N. 91st St. (Easterly half of the East West Leg) (ST212060129):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000 additional funds).  File Number 041692 authorized $5,000.  The total estimated engineering cost for this project including the requested amount is $10,000.The total estimated cost for this project including the requested amount is $48,000. This project is anticipated to be completed during the 2007 construction season.

 

Alley Between W. Grantosa Dr., W. Marion St., N. 99th St. and N. 100th St. (Sponsored by the City of Wauwatosa). (ST212070115):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $5,000 additional funds).  File Number 060244 authorized $3,000.  The total estimated engineering cost for this project including the requested amount is $8,000.The total estimated cost for this project including the requested amount is $45,000. This project is anticipated to be completed during the 2007 construction season.

 

6th Aldermanic District

 

N. 24th St. - W. Nash St. to W. Vienna Av. (ST211070120):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000 additional funds).  File Number 051223 authorized $9,000.  The total estimated engineering cost for this project including the requested amount is $14,000.The total estimated cost for this project including the requested amount is $115,000.  This project is anticipated to be completed during the 2007 construction season.

 

Alley Between W. Burleigh St., W. Ring St., N. 12th St. and N. 13th St. (Portion of the East- West Leg)  (ST212060136):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $3,000 additional funds).  File Number 060138 authorized $3,000.  The total estimated engineering cost for this project including the requested amount is $6,000.The total estimated cost for this project including the requested amount is $17,000.  This project is anticipated to be completed during the 2007 construction season.

 

E. Brown St. - N. Holton St. to N. Palmer St. (ST211070148):   Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $5,000 additional funds).  File Number 051660 authorized $11,000.  The total estimated engineering cost for this project including the requested amount is $16,000.The total estimated cost for this project including the requested amount is $255,000.  This project is anticipated to be completed during the 2007 construction season.

 

11th Aldermanic District

 

S. 74th St. - W. Tripoli Ave.  to W. Crawford Ave. (ST211060156):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $10,000 additional construction funds).  File Number 060135 authorized $64,800.  The total estimated cost for this project including the requested amount is $74,800.  This project is anticipated to be completed during the 2007 construction season.

 

S. 82nd Ct. W. Ohio Ave. to a point 200’ m/l North of W. Ohio Ave. (ST211070154): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund --

$5,000 additional funds). File Number 060138 authorized $4,000.  The total estimated engineering cost for this project including the requested amount is $9,000. The total estimated cost for this project including the requested amount is $32,000. This project is anticipated to be completed during the 2007 construction season.

 

W. Crawford Ave. - S. 73rd St. to S. 75th St. (ST211030109): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $10,000 additional construction funds).  The total estimated cost for this project including the requested amount is $104,500. This project is anticipated to be completed during the 2007 construction season.

 

13th Aldermanic District

 

S. 18th St. - W. Clayton Crest Ave. to W. Edgerton Ave. (ST211050102): Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $10,000 additional construction funds).  File Number 041694 authorized $165,400.  The total estimated cost for this project including the requested amount is $175,400.  This project is anticipated to be completed during the 2007 construction season.

 

; and, be it

 

Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it

 

Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

mld:lk

apr7

02/14/07