File #: 080004    Version:
Type: Resolution Status: Passed
File created: 4/15/2008 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 5/20/2008
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $145,000 for a total estimated cost of these projects being $1,754,900.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Infrastructure Services Division Cover Letter, 2. Fiscal Note, 3. Hearing notice list

Number

080004

Version

SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $145,000 for a total estimated cost of these projects being $1,754,900.

Analysis

This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $145,000 with the total cost estimated to be $1,754,900.

Body

Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

 

2nd Aldermanic District

 

W. Marion St. - N. 64th St. to N. 66th St. (ST211090120):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $8,000).  The total estimated cost for this project including the requested amount is $90,000.  This project is anticipated to be completed during the 2009 construction season.

 

W. Perkins Pl. - W. Appleton Ave. to N. 76th St. (ST211080121):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $5,000).  The total estimated cost for this project including the requested amount is $65,000.  This project is anticipated to be completed during the 2008 construction season.

 

N. 64th St. - W. Capitol Dr. to W. Marion St. (ST211090118):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $18,000).  The total estimated cost for this project including the requested amount is $240,000.  This project is anticipated to be completed during the 2009 construction season.

 

N. 66th St. - W. Capitol Dr. to W. Congress St. (ST211090119):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $20,000).  The total estimated cost for this project including the requested amount is $315,000.  This project is anticipated to be completed during the 2009 construction season.

 

6th Aldermanic District

 

N. 1st St. - W. Concordia Ave. to W. Keefe Ave. (ST211089001):  Traffic calming devices.  (Nonassessable Reconstruction Paving Fund -- $2,000).  The total estimated cost for this project including the requested amount is $9,000.  This project is anticipated to be completed during the 2008 construction season.

 

9th Aldermanic District

 

N. Servite Dr. - A point south of W. Brown Deer Rd. to W. Brown Deer Rd. (ST211060159):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.

(Nonassessable Reconstruction Paving Fund -- $20,000 Additional Funds).  The total estimated cost for this project including the requested amount is $100,900.  This project is anticipated to be completed during the 2008 construction season.

 

10th Aldermanic District

 

N. 91st St. - W. Blue Mound Rd. to W. Wisconsin Ave. (ST21110123):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $5,000 Additional funds).  File Number 991032 Authorized $13,000.  Total engineering costs of $18,000.  The total estimated cost including the requested amount is $131,000.  This project is anticipated to be completed during the 2009 construction season.

 

11th Aldermanic District

 

Alley between W. Eden Pl., W. Morgan Ave., S. 63rd St., S. 66th St. (West half) (ST212070109):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $11,000).  The total estimated cost including the requested amount is $90,000.  This project is anticipated to be completed during the 2009 construction season.

 

12th Aldermanic District

 

Alley between W. Mineral St., W. National Ave., S. 22nd St., S. 23rd St.  (ST212070111):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $15,000).  The total estimated cost including the requested amount is $115,000.  This project is anticipated to be completed during the 2009 construction season.

 

13th Aldermanic District

 

W. Parnell Ave. - S. 29th St. to W. Ramsey Ave. (ST211090121):  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $25,000).  The total estimated cost for this project including the requested amount is $475,000.  This project is anticipated to be completed during the 2009 construction season.

 

Alley between W. Crawford Ave., W. Wilbur Ave., S. 14th St., S. 15th St.  (ST212070108):  Paving the alley with concrete.  Doing all the necessary grading pertaining to said work.  (Nonassessable Alley Paving Fund -- $16,000)  The total estimated cost including the requested amount is $124,000.  This project is anticipated to be completed during the 2009 construction season.

 

; and, be it

 

Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it

 

Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

mld:dr

apr10

04/10/08