Skip to main content
powered help
header-left header-center header-right
File #: 251140    Version:
Type: Resolution Status: In Council-Adoption
File created: 11/4/2025 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action:
Effective date:    
Title: Substitute resolution authorizing the City Comptroller to transfer funds to the previously established project for the Wisconsin Department of Transportation and the City of Milwaukee for cost participation for the construction of the 16th Street Bridge over the Menomonee River with a total estimated cost increase for the project of $3,059,779.55, with an estimated Grantor share of $11,097,209.78 and an estimated City share of $(8,037,430.23).
Sponsors: THE CHAIR
Attachments: 1. 25C0773 SIGNED MOU with City of Milwaukee - 16th Street Bridge Project.pdf, 2. 2615-15-73_Bid Analysis_FC Potawatomi funding addition DB.pdf, 3. Resolution Certification 2615-15-73.pdf

Number

251140

Version

SUBSTITUTE 1

Reference

Sponsor

THE CHAIR

Title

Substitute resolution authorizing the City Comptroller to transfer funds to the previously established project for the Wisconsin Department of Transportation and the City of Milwaukee for cost participation for the construction of the 16th Street Bridge over the Menomonee River with a total estimated cost increase for the project of $3,059,779.55, with an estimated Grantor share of $11,097,209.78 and an estimated City share of $(8,037,430.23).

Analysis

Substitute resolution authorizing the City Comptroller to transfer funds to the previously established projects for the Wisconsin Department of Transportation and the City of Milwaukee for cost participation for the construction of the North Holton Street Bridge over the 16th Street Bridge over the Menomonee River with a total estimated cost increase for the project of $3,059,779.55 with an estimated Grantor share of $11,097,209.78, and an estimated City share of $(8,037,430.23).

Body

Whereas, Additional funds are, therefore, necessary to complete the construction of the projects; now, therefore be it

 

Resolved, By the Common Council of the City of Milwaukee, that the City Comptroller is hereby authorized to transfer fund to the project grant chart field as follows:

 

Project Grant Value

State ID 2615-15-73

BR320221710 / ST320221710

South 16th Street Bridge

Over Menomonee River

 

City Share Non-Assessable Fund Structure

BR300250000

Fund 0303

$(8,037,430.23)

 

Grantor Reimbursable Fund Structure

SP032500100

Fund 0306

$11,097,209.78

 

Grantor Non-Reimbursable

$0

 

City Share Non-Assessable Paving Fund

ST320250000

Fund 0333

$0

 

Grantor Reimbursable

SP032250100

Fund 0306

$0

 

Grantor Non-Reimbursable

$ 0

 

Total Project Construction $22,496,589.08

 

Previously Authorized for project construction: $19,436,809.53

Current estimated cost of total project including this resolution $24,252,489.08

Original estimated cost of total project (Resolution File Number 220499) $14,983,600.00

 

Requestor

Department of Public Works

Drafter

Infrastructure Services Division

JONATHAN D. THOMAS:K. Vos

November 6, 2025