Number
060658
Version
SUBSTITUTE 3
Reference
Sponsor
ALDS. BAUMAN, DONOVAN, WITKOWSKI, WADE, HAMILTON, D'AMATO, ZIELINSKI, MCGEE, MURPHY, BOHL AND HINES
Title
A substitute ordinance relating to placement and construction of traffic calming installations and providing a process for petition and special assessments.
Sections
115-1-17 cr
115-42.5 cr
115-43-2-a-4 rn
115-43-2-a-4 cr
115-43-2-a-5 rn
Analysis
This ordinance establishes a petition process for owners of parcels in residential districts to seek placement of traffic calming installations in streets and alleys. "Traffic calming installation" is defined to mean any device, object or material, other than a traffic sign, signal or other traffic control device as defined in s. 349.065, Wis. Stats., constructed or placed within a public way for the purpose of encouraging slower traffic or enhancing pedestrian safety.
Section s. 66.0703, Wis. Stats., and s. 115-42 of the code establish a process for initiating public works and for levying of special assessments. The commissioner of public works is responsible for submitting a preliminary resolution to the common council under s. 115-42-2. This ordinance directs the commissioner to file a preliminary resolution upon proper petition submitted by owners of parcels. Such petition must conform to a sample petition prepared and approved by the commissioner. Upon adoption of a resolution directing the construction or placement of a traffic calming installation, a special assessment of 90% will be levied to parcels abutting the affected street or alley.
Body
The Mayor and Common Council of the City of Milwaukee do ordain as follows:
Part 1. Section 115-1-17 of the code is created to read:
115-1. Definitions.
17. TRAFFIC CALMING INSTALLATION means any device, object or material, other than a traffic sign, signal or other traffic control device as defined in s. 349.065, Wis. Stats., constructed or placed within a public way for the purpose of encouraging slower traffic or enhancing pedestrian safety.
Part 2. Section 115-42.5 of the code is created to read:
115-42.5. Traffic Calming Installations. 1. PURPOSE. It is the purpose of the common council to establish a traffic calming program in the city that incorporates traffic calming installations within new construction and repair projects where appropriate and effective, and to otherwise promote public health, safety and the peaceful enjoyment of neighborhoods and residential areas by encouraging the initiation of traffic calming installations. It is furthermore the purpose of this section to provide property owners a process for initiating public works for the construction or placement of traffic calming installations. It is the intent of the common council that this process supplement and not replace other processes for initiating public works.
2. PETITION. a. By Property Owners. a-1. Upon submission to the commissioner of a petition of support for traffic calming signed by at least 50% of the owners of parcels in the affected area as determined by the commissioner, a preliminary resolution shall be prepared and submitted as provided in s. 115-42-2.
a-2. The petition submitted pursuant to this subsection shall substantially conform to a sample petition to be prepared and approved by the commissioner and shall include the name of the owner, the address of the parcel or parcels abutting the block or alley, address of the owner if different, date of signature, a clear statement that a traffic calming installation is requested, and any other information the commissioner determines to be necessary or appropriate.
3. COUNCIL APPROVAL. The procedures provided in s. 115-42 shall apply to the process for approval of the construction or placement of traffic calming installations.
4. SPECIAL ASSESSMENT. Upon adoption of a resolution by the common council directing the construction or placement of a traffic calming installation sought initially by petition to the commissioner under sub. 2, the recovery ratio provided in s. 115-43-2-a-4 shall be applied to those properties or parcels abutting the street or alley within which the installation is placed or constructed, as determined by the commissioner.
Part 3. Section 115-43-2-a-4 and a-5 of the code is renumbered 115-43-2-a-5 and a-6.
Part 4. Section 115-43-2-a-4 of the code is created to read:
115-43. Recovery Rates for Assessable Improvements.
2. RECOVERY RATES AND RATIOS. a. New Construction.
a-4. Placement of Traffic Calming Installation - 90%.
LRB
APPROVED AS TO FORM
____________________________
Legislative Reference Bureau
Date: ______________________
Attorney
IT IS OUR OPINION THAT THE ORDINANCE
IS LEGAL AND ENFORCEABLE
____________________________
Office of the City Attorney
Date: ______________________
Requestor
Drafter
LRB060658-5
RLW
12/05/2006