File #: 020289    Version:
Type: Resolution Status: Passed
File created: 6/4/2002 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 6/25/2002
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations.
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS, PUBLIC IMPROVEMENTS, SIDEWALKS, SPECIAL ASSESSMENTS, STREET IMPROVEMENTS
Attachments: 1. Infr. Serv. Div. cover letter.pdf, 2. FISCAL NOTE.pdf

 

Number

020289

Version

SUBSTITUTE 1

Reference

 

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

2nd Aldermanic District

 

Alley between W. Chambers St., W. Moltke Ave., N. 66th St., and N. 68th St. (ST212020116) File Number 000838:  Concrete alley pavement reconstruction, replace some abutting sidewalk or driveway approach, and grading. (Assessable Alley Paving Fund -- $64,800; Nonassessable Alley Paving Fund -- $18,300)

 

5th Aldermanic District

 

W. Chambers St. – N. 84th St. to N. 87th St. (ST211020110) File Number 000616:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, sodding, and grading. (Assessable Reconstruction Paving Fund -- $19,400; Nonassessable Reconstruction Paving Fund -- $108,500)

 

W. Vienna Ave. – N. 84th St. to N. 88th St. (ST211020135) File Number 000838:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, sodding, and grading. (Assessable Reconstruction Paving Fund -- $3,400; Nonassessable Reconstruction Paving Fund -- $132,000)

 

Alley between N. Evans St., W. Grantosa Dr., W. Hampton Ave., and N. 82nd St. (ST212020106) File Number 931154:  Concrete alley pavement reconstruction, replace some abutting sidewalk or driveway approach, and grading. (Assessable Alley Paving Fund -- $40,800; Nonassessable Alley Paving Fund -- $78,300)

 

6th Aldermanic District

 

E. Dock St. – A point south of N. Commerce St. to N. Commerce St. (TD02284019/SW170010157) File Number 001765:  New storm sewer. (Assessable Expansion of Capacity Sewer Fund -- $4,600; T.I.D. Funds -- $10,400)

 

7th Aldermanic District

 

N. 24th St. – W. Garfield Ave. to W. North Ave. (ST211020136) File Number 001024:  Asphalt pavement resurfacing, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding, and grading. (Assessable Reconstruction Paving Fund -- $45,900; Nonassessable Reconstruction Paving Fund -- $27,100)

 

Alley between W. Chambers St., W. Locust St., N. 50th St., and N. 51st St. (ST21210125) File Number 991032:  Concrete alley pavement reconstruction, replace some abutting sidewalk or driveway approach, and grading. (Assessable Alley Paving Fund -- $67,600; Nonassessable Alley Paving Fund -- $14,000)

 

8th Aldermanic District

 

W. Rogers St. – A point west of S. 36th St. to S. 37th St. (ST211020124) File Number 891874:  Asphalt pavement resurfacing, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding, and grading. (Assessable Reconstruction Paving Fund -- $18,000; Nonassessable Reconstruction Paving Fund -- $29,000)

 

8th and 16th Aldermanic Districts

 

S. 26th St. – W. Greenfield Ave. to W. Scott St. (ST211020140) File Number 871449:  Asphalt pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding, grading and tree removal where necessary. (Assessable Reconstruction Paving Fund -- $76,200; Nonassessable Reconstruction Paving Fund -- $24,600)

 

10th Aldermanic District

 

W. Scranton Pl. – W. Keefe Ave. to N. 49th St. (ST21110112) File Number 86-2125:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, sodding, and grading. (Assessable Reconstruction Paving Fund -- $54,600; Nonassessable Reconstruction Paving Fund -- $102,700)

 

11th Aldermanic District

 

S. 83rd St. – W. Warnimont Ave. to W. Morgan Ave. (ST211020137) File Number 001024:  Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, sodding, and grading. (Assessable Reconstruction Paving Fund -- $29,700; Nonassessable Reconstruction Paving Fund -- $11,400)

 

12th Aldermanic District

 

S. 21st St. – W. Mitchell St. to W. Greenfield Ave. (ST211020115) File Number 940993:  Asphalt pavement resurfacing, narrow the roadway from 40 feet to 36 feet, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding, grading and tree removal where necessary. (Assessable Reconstruction Paving Fund -- $146,900; Nonassessable Reconstruction Paving Fund -- $92,200)

 

Alley between W. Mineral St., W. Scott St., S. 20th St., and S. 21st St. (ST212020114) File Number 000779:  Concrete alley pavement reconstruction, replace some abutting sidewalk or driveway approach, and grading. (Assessable Alley Paving Fund -- $71,400; Nonassessable Alley Paving Fund -- $20,000)

 

14th Aldermanic District

 

E. Deer Pl. – S. Burrell St. to (West) S. Greeley St. (ST211020141) File Number 86-1468:  Concrete pavement reconstruction, replace all of the curb and gutter, replace sidewalk and driveway approaches where needed, sodding, and grading. (Assessable Reconstruction Paving Fund -- $27,000; Nonassessable Reconstruction Paving Fund – $55,200)

 

;and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works' Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances, and, be it

 

Further Resolved, That the City Comptroller is authorized and directed to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That upon request of the property owner (tax key number 354-0403-100-5) the special assessment for storm sewer in E. Dock St. be deferred until application for connection to said storm sewer is made.  Cost for deferred charges shall be in accordance with City Charter 12-10; and, be it

 

Further Resolved, That projects: Alley W. Chambers St. (ST212020116), W. Chambers St. (ST211020110), W. Vienna Ave. (ST211020135), Alley N. Evans St. (ST212020106),  N. 24th St. (ST211020136), Alley W. Chambers St. (ST21210125), W. Scranton Pl. (ST21110112), S. 83rd St. (ST211020137),  will be billed after January 1, 2004, and that the projects: S. 21st St. (ST211020115), S. 26th St.  (ST211020140), E. Deer Pl. (ST211020141) and Alley W. Mineral St. (ST211020114) will be billed after January 1, 2005 ; but not before 12 months after the project contract has been completed; and. be it

 

Futher Resolved, That the following projects be deleted from the 2002 Paving Program.

 

2nd Aldermanic District

 

Alley between W. Appleton Ave., W. Congress St., W. Hope Ave., W. Potomac Ave., and N. 80th St. (ST212020110) File Number 000838.

 

 

Requestor

Infrastructure Services Division

Drafter

mld:lk

afr13

06/12/02