Legislation Details

File #: 260807    Version:
Type: Resolution Status: Passed
File created: 9/22/2026 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 10/13/2026
Effective date:    
Title: Substitute resolution directing the Department of Public Works to establish severe weather protocols to prevent flooding incidents in areas known to be prone to flooding.
Sponsors: COMMON COUNCIL
Attachments: 1. Emergency Weather Protocols Resolution (now Substitute 1)
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
10/15/20261 MAYOR SIGNED   Action details Meeting details Not available
10/13/20261 COMMON COUNCIL ADOPTED

Minutes note: Ald. Chambers made a request for an unanimous sponsorship of this file.
Pass13:0 Action details Meeting details Not available
9/30/20261 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Appeared Ald. Pratt Appeared Kevin Muhs (City Engineer, DPW) Appeared Jerrel Kruschke (Commissioner, DPW) Alderwoman Pratt and Ald. Coggs sponsor this file directing DPW to establish a severe weather protocol for flood-prone areas, specifically citing repeated flooding at 20th and Capitol caused by debris.
Pass5:0 Action details Meeting details Video Video
9/22/20260 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

260807

Version

SUBSTITUTE 1

Reference

 

Sponsor

COMMON COUNCIL

Title

Substitute resolution directing the Department of Public Works to establish severe weather protocols to prevent flooding incidents in areas known to be prone to flooding.

Analysis

This resolution directs the Department of Public Works to establish protocols for weather events in areas that are flood-prone modeled after the City’s snow protocols and report the new protocols to the Common Council within 90 days.

Body

Whereas, On August 9 and 10, 2025, a series of severe floods impacted Milwaukee and its surrounding areas; and

Whereas, Portions of the city received between 7 and 10 inches of rainfall in a single evening; and

Whereas, This weather event resulted in 2,200 homes that were severely damaged or destroyed, as well as at least 2 confirmed fatalities; and

Whereas, Wide-spread damage occurred despite the $580 million in green infrastructure and flood management projects implemented by Milwaukee and MMSD; and

Whereas, Flooding is an ongoing issue in parts of the city and can occur any time it rains, not just during extreme weather events; now, therefore, be it

Resolved, By the Common Council of the City of Milwaukee, that the Department of Public Works is directed to establish protocols for weather events in areas known to be flood-prone; and, be it

Further Resolved, The protocols should be modeled after the City’s snowfall protocols and should include proactive steps such as clearing debris from sewer grates in advance of weather events; and, be it

Further Resolved, That the Department of Public Works shall report these new protocols to the Common Council within 90 days of adoption of this resolution.

Drafter

LRB 181938-2

Christopher Hillard

9/28/2026