File #: 120855    Version:
Type: Resolution Status: Passed
File created: 10/16/2012 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 11/8/2012
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $304,000 for a total estimated cost of these projects being $8,488,677.44; and, directs the City Comptroller to transfer funds and set up appropriate accounts for preliminary engineering for the projects (listed below) with Federal/State Aid.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Revised Bay View to Downtown Bikeway Agreement, 2. Capitol Grant Resolution Certification, 3. Hearing Notice List
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
11/13/20121 MAYOR SIGNED   Action details Meeting details Not available
11/8/20121 COMMON COUNCIL ADOPTEDPass14:1 Action details Meeting details Not available
10/23/20120 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Individual appearing: Mary Dziewiontkoski, Department of Public Works Ms. D clarified that the file should say North 27th and not South 27th. Proposed Substitute A was accepted.
Pass3:0 Action details Meeting details Not available
10/23/20121 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTIONPass3:0 Action details Meeting details Not available
10/19/20120 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
10/16/20120 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
120855
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $304,000 for a total estimated cost of these projects being $8,488,677.44; and, directs the City Comptroller to transfer funds and set up appropriate accounts for preliminary engineering for the projects (listed below) with Federal/State Aid.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $304,000 with the total cost estimated to be $8,488,677.44; and, directs the City Comptroller to transfer funds and set up appropriate accounts for preliminary engineering for the projects (listed below) with Federal/State Aid.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

4th Aldermanic District

N. 27th St. - W. St. Paul Ave. to W. Highland Ave. (WT410130011): Hydrant alteration. (Nonassessable Water Fund Budget Line 5010 -- $1,000; Nonassessable Water Fund Budget Line 6410 -- $3,000). The total estimated cost for this project including the requested amount is $40,000. This project is anticipated to be completed during the 2013 construction season.

12th Aldermanic District

S. 10th St., W. Windlake Ave., and W. Rogers St. (Intersection) (ST211130144): Intersection modification. (Nonassessable Reconstruction Paving Fund -- $60,000, Additional Funds). The total estimated cost for this project including the requested amount is $70,000. This project is anticipated to be completed during the 2013 c...