powered help
header-left header-center header-right
File #: 221228    Version: 0
Type: Resolution Status: Passed
File created: 12/13/2022 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 1/17/2023
Effective date:    
Title: Resolution directing the Commissioner of Public Works to execute a document titled “1st Revision State/Municipal Agreement for a State-Let Highway Project” with the Wisconsin Department of Transportation for the programming, design, real estate acquisition, and construction of North Green Bay Road (STH 57) from West Capitol Drive to West Silver Spring Drive, and to set up additional funds for design engineering at an estimated total cost of $395,000 with an estimated City share of $98,750 and a grantor share of $296,250.
Sponsors: THE CHAIR
Attachments: 1. 2565-06-00_70 STH57 CMilw W Capitol-WSilverSpringRev.pdf, 2. Resolution Certification 2565-06-00.pdf, 3. Resolution Certification 2565-06-20.pdf
Number
221228
Version
ORIGINAL
Reference
Sponsor
THE CHAIR
Title
Resolution directing the Commissioner of Public Works to execute a document titled “1st Revision State/Municipal Agreement for a State-Let Highway Project” with the Wisconsin Department of Transportation for the programming, design, real estate acquisition, and construction of North Green Bay Road (STH 57) from West Capitol Drive to West Silver Spring Drive, and to set up additional funds for design engineering at an estimated total cost of $395,000 with an estimated City share of $98,750 and a grantor share of $296,250.
Analysis
This resolution directs the Commissioner of Public Works to execute a State/Municipal Agreement with the Wisconsin Department of Transportation for the programming, design, real estate acquisition, and construction of North Green Bay Road (STH 57) from West Capitol Drive to West Silver Spring Drive. The State/Municipal Agreement provides for 75 percent Federal and State aid and 25 percent local cost sharing for preliminary engineering. The revised total estimated cost of this project is $25,795,750 with a grantor share of $24,513,297 and a City share of $1,282,453. This resolution also directs the City Comptroller to transfer additional funds for preliminary engineering at an estimated cost of $395,000 with an estimated City share of $98,750 and a grantor share of $296,250. This resolution also directs the City Comptroller to transfer funds for real estate acquisition at an estimated cost of $25,000 with an estimated City share of $0 and a grantor share of $25,000Construction funds for this project will be included in future resolutions.
Body
Whereas, A revised project agreement has been requested and received from the Wisconsin Department of Transportation (WisDOT) to be executed by the City of Milwaukee for the programming, design, and construction of North Green Bay Road (STH 57) from West Capitol Drive to West Silver Spring Drive with Federal and State ...

Click here for full text