File #: 210454    Version:
Type: Resolution Status: Passed
File created: 7/7/2021 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 7/27/2021
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $307,400 for a total estimated cost of $307,400.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. Signed Letter.pdf, 2. Signed Ad 15.pdf, 3. Cycle 15 Official Notice.pdf, 4. Notice published 8/13/2021
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
8/13/20211 CITY CLERK PUBLISHED   Action details Meeting details Not available
8/5/20211 MAYOR SIGNED   Action details Meeting details Not available
7/27/20211 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
7/16/20211 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 1st Aldermanic District W. Neil Pl. – N. 20th St. to N. Long Island Dr. (ST211210188) Install traffic calming speed hump(s). Linda Jackson 5467 N 20th St stated a lot of elderly people live in the area and there is a lot of speeding. Michelle Clark 5430 N 20th St stated she is in support. Ald. Zamarripa moved approval. (Prevailed 5-0) W. Sheridan Ave. – N. Green Bay Ave. to N. 20th St. (ST211210196) Install traffic calming speed hump(s). Ald. Borkowski moved approval. (Prevailed 5-0) N. 15th St. –W. Capitol Dr. to W. Fiebrantz Ave. (ST211210189) Install traffic calming speed hump(s). Ald. Perez moved approval. (Prevailed 5-0) 2nd Aldermanic District W. Custer Ave. – N. 87th St. to N. 90th St. (ST211210194) Install traffic calming speed hump(s). Todd Miller - 2nd District Legislative Assistant stated Pres. Johnson is in support. Ald. Borkowski moved approval. (Prevailed 5-0) N. 63rd St. – W. Fiebrantz Ave. to W. Hope Ave. (ST211210192) Install traffic calming speed hump(s). Todd Miller - 2nd District Legislative Assistant stated Pres. Johnson is in support. Ald. Perez moved approval. (Prevailed 5-0) N. 64th St. – W. Ruby Ave. to W. Medford Ave. (ST211210199) Install traffic calming speed hump(s). Todd Miller - 2nd District Legislative Assistant stated Pres. Johnson is in support. Ald. Borkowski moved approval. (Prevailed 5-0) N. 72nd St. – W. Glendale Ave. to W. Courtland Ave. (ST211210206) Install traffic calming speed hump(s). Todd Miller - 2nd District Legislative Assistant stated Pres. Johnson is in support. Ald. Perez moved approval. (Prevailed 5-0) N. 77th St. – W. Luscher Ave. to W. Gertrude Dr. (ST211210193) Install traffic calming speed hump(s). Todd Miller - 2nd District Legislative Assistant stated Pres. Johnson is in support. Ald. Zamarripa moved approval. (Prevailed 5-0) N. 79th St. – W. Bobolink Ave. to W. Florist Ave. (ST211210216) Install traffic calming speed hump(s). Amy Hall 5928 N 79th St stated she is concerned about her property value. Ald. Perez moved approval. (Prevailed 5-0) 5th Aldermanic District W. Carmen Av. - N. 117th St. to N. 124th St. (ST211210186) Install traffic calming speed hump(s). Greg Lundgren Herslof Optical 12000 W Tower Ave stated there were temporary speed humps that were removed and now they're being reinstalled. Ald. Borkowski moved approval. (Prevailed 5-0) W. Courtland Ave. – N. 76th St. to N. 78th St. (ST211150194) Install traffic calming speed hump(s). Ald. Stamper moved approval. (Prevailed 5-0) W. Florist Av. - W. Appleton Av. to N. Lovers Lane Rd./N. 115th St. (ST211210187) Install traffic calming speed hump(s). Early Portis 10957 W Florist Ave stated there is a lot of traffic that comes through the area. Ald. Perez moved approval. (Prevailed 5-0) 6th Aldermanic District N. 13th St. – W. Finn Pl. to W. Atkinson Ave. (ST211210208) Install traffic calming speed hump(s). Ald. Zamarripa moved approval. (Prevailed 5-0) N. 16th – W. Concordia Ave.to W. Keefe Ave. (ST211210209) Install traffic calming speed hump(s). Ald. Stamper moved approval. (Prevailed 5-0) 7th Aldermanic District W. Concordia Ave. – N. 24th St. to N. 27th St. (ST211210197) Install traffic calming speed hump(s). Kathrine Perkins 3292 N 26th St stated she is in support of the speed humps because there is drag racing. Ald. Zamarripa moved approval. (Prevailed 5-0) N. Montreal St. – N. 38th St. to W. Hope Ave. (ST211210132) Install traffic calming speed hump(s). Ald. Stamper moved approval. (Prevailed 5-0) W. Scranton Pl. – N. 48th St. to N. 49th St. (ST211180229) Install traffic calming speed hump(s). Ald. Borkowski moved approval. (Prevailed 5-0) N. 39th St. - W. Locust St. to W. Chambers St. (ST211210210) Install traffic calming speed hump(s). Cassie Cooper 2947 N 39th St stated it is a one-way street and there is a lot of speeding. Ald. Stamper moved approval. (Prevailed 5-0) N. 40th St. – W. Burleigh St. to W. Auer Ave. (ST211210211) Install traffic calming speed hump(s). Ald. Perez moved approval. (Prevailed 5-0) N. 40th St. – W. Capitol Dr. to W. Fiebrantz Ave. (ST211210215) Install traffic calming speed hump(s). Ald. Zamarripa moved approval. (Prevailed 5-0) N. 44th St. – W. Burleigh St. to W. Auer Ave. (ST211210213) Install traffic calming speed hump(s). Ald. Perez moved approval. (Prevailed 5-0) N. 48th St. – W. Burleigh St. to W. Auer Ave. (ST211210214) Install traffic calming speed hump(s). Gwedolyn Allison 3176 N 48th St stated she is in support. Ald. Borkowski moved approval. (Prevailed 5-0) 8th Aldermanic District S. 31st St. – W. Lincoln Ave. to W. Grant St. (ST211210169) Install traffic calming speed hump(s). Celina Echeveste 2252 S 31st St stated she is in suport because of the excessive speeding. Carla Echeveste 2252 S 31st St stated there is dangerous driving because people are going freeway speeds. Ald. Zamarripa moved approval. (Prevailed 5-0) S. 33rd St. – W. Hayes Ave. to W. Lincoln Ave. (ST211210229) Install traffic calming speed hump(s). Ald. Zamarripa moved approval. (Prevailed 5-0) 9th Aldermanic District N. 57th St. – W. Thurston Ave. to W. Carmen Ave. (ST211210228) Install traffic calming speed hump(s). The resident stated that she is concerned for the safety of her children. Ald. Stamper moved approval. (Prevailed 5-0) 10th Aldermanic District N. 56th St. – W. North Ave. to W. Meinecke Ave. (ST211180265) Install traffic calming speed hump(s). Ald. Perez moved to delete the project. (Prevailed 5-0) 14th Aldermanic District S. 7th St. – W. Dakota St. to W. Montana St. (ST211210151) Install traffic calming speed humps(s). Luke Slova 2851 S 7th St stated he is not in support because he hasn't seen any speeding. Ald. Perez moved to hold the project. (Prevailed 5-0) 15th Aldermanic District N. Grant Blvd. – W. Hadley St. to W. Locust St. (ST211210191) Install traffic calming speed hump(s). Greg Adam 2818 N Grant Blvd stated he is in support. Jordan Morales 2804 N Grant Blvd stated he is in support because his car was hit by a speeding drunk driver. Ald. Stamper moved approval. (Prevailed 5-0) W. Vine St. – N. 21st St. to N. 22nd St. (ST211210207) Install traffic calming speed hump(s). Ald. Stamper moved approval. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
7/7/20210 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

 

Number

210454

Version

SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $307,400 for a total estimated cost of $307,400.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $307,400.  The total estimated cost of these projects is $307,400.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

1st Aldermanic District

 

W. Neil Pl. - N. 20th St. to N. Long Island Dr. (ST211210188) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $8,400; Nonassessable Reconstruction Paving Fund  -- $2,000).   The total estimated cost of this project including the requested amount is $10,400. This project is anticipated to be completed during the 2021 construction season.

 

W. Sheridan Ave. - N. Green Bay Ave. to N. 20th St. (ST211210196) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $4,500; Nonassessable Reconstruction Paving Fund  -- $9,600).   The total estimated cost of this project including the requested amount is $14,100. This project is anticipated to be completed during the 2021 construction season.

 

N. 15th St. -W. Capitol Dr. to W. Fiebrantz Ave. (ST211210189) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $6,300; Nonassessable Reconstruction Paving Fund  -- $1,700).   The total estimated cost of this project including the requested amount is $8,000. This project is anticipated to be completed during the 2021 construction season.

 

2nd Aldermanic District

 

W. Custer Ave. - N. 87th St. to N. 90th St. (ST211210194) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $9,400; Nonassessable Reconstruction Paving Fund  -- $2,700).   The total estimated cost of this project including the requested amount is $12,100. This project is anticipated to be completed during the 2021 construction season.

 

N. 63rd St. - W. Fiebrantz Ave. to W. Hope Ave. (ST211210192) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $7,600; Nonassessable Reconstruction Paving Fund  -- $2,000).   The total estimated cost of this project including the requested amount is $9,600. This project is anticipated to be completed during the 2021 construction season.

 

N. 64th St. - W. Ruby Ave. to W. Medford Ave. (ST211210199) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $6,300; Nonassessable Reconstruction Paving Fund  -- $2,000).   The total estimated cost of this project including the requested amount is $8,300. This project is anticipated to be completed during the 2021 construction season.

 

N. 72nd St. - W. Glendale Ave. to W. Courtland Ave. (ST211210206) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $8,700; Nonassessable Reconstruction Paving Fund  -- $3,500).   The total estimated cost of this project including the requested amount is $12,200. This project is anticipated to be completed during the 2021 construction season.

 

N. 77th St. - W. Luscher Ave. to W. Gertrude Dr. (ST211210193) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $4,000; Nonassessable Reconstruction Paving Fund  -- $3,200).   The total estimated cost of this project including the requested amount is $7,200. This project is anticipated to be completed during the 2021 construction season.

 

N. 79th St. - W. Bobolink Ave. to W. Florist Ave. (ST211210216) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $7,400; Nonassessable Reconstruction Paving Fund  -- $2,000).   The total estimated cost of this project including the requested amount is $9,400. This project is anticipated to be completed during the 2021 construction season.

 

5th Aldermanic District

 

W. Carmen Av. - N. 117th St. to N. 124th St. (ST211210186) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $16,100; Nonassessable Reconstruction Paving Fund  -- $2,000).   The total estimated cost of this project including the requested amount is $18,100. This project is anticipated to be completed during the 2021 construction season.

 

W. Courtland Ave. - N. 76th St. to N. 78th St. (ST211150194) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $3,100; Nonassessable Reconstruction Paving Fund  -- $11,400).   The total estimated cost of this project including the requested amount is $14,500. This project is anticipated to be completed during the 2021 construction season.

 

W. Florist Av. - W. Appleton Av. to N. Lovers Lane Rd./N. 115th St. (ST211210187) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $27,000; Nonassessable Reconstruction Paving Fund  -- $2,000).   The total estimated cost of this project including the requested amount is $29,000. This project is anticipated to be completed during the 2021 construction season.

 

6th Aldermanic District

 

N. 13th St. - W. Finn Pl. to W. Atkinson Ave. (ST211210208) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $7,900; Nonassessable Reconstruction Paving Fund  -- $3,800).   The total estimated cost of this project including the requested amount is $11,700. This project is anticipated to be completed during the 2021 construction season.

 

N. 16th - W. Concordia Ave. to W. Keefe Ave. (ST211210209) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $11,900; Nonassessable Reconstruction Paving Fund  -- $2,000).   The total estimated cost of this project including the requested amount is $13,900. This project is anticipated to be completed during the 2021 construction season.

 

7th Aldermanic District

 

W. Concordia Ave. - N. 24th St. to N. 27th St. (ST211210197) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $7,600; Nonassessable Reconstruction Paving Fund  -- $17,700).   The total estimated cost of this project including the requested amount is $25,300. This project is anticipated to be completed during the 2021 construction season.

 

N. Montreal St. - N. 38th St. to W. Hope Ave. (ST211210132) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $4,000; Nonassessable Reconstruction Paving Fund  -- $2,900).   The total estimated cost of this project including the requested amount is $6,900. This project is anticipated to be completed during the 2021 construction season.

 

W. Scranton Pl. - N. 48th St. to N. 49th St. (ST211180229) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $4,700; Nonassessable Reconstruction Paving Fund  -- $1,600).   The total estimated cost of this project including the requested amount is $6,300. This project is anticipated to be completed during the 2021 construction season.

 

N. 39th St. - W. Locust St. to W. Chambers St. (ST211210210) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $7,800; Nonassessable Reconstruction Paving Fund  -- $2,000).   The total estimated cost of this project including the requested amount is $9,800. This project is anticipated to be completed during the 2021 construction season.

 

N. 40th St. - W. Burleigh St. to W. Auer Ave. (ST211210211) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $6,500; Nonassessable Reconstruction Paving Fund  -- $2,000).   The total estimated cost of this project including the requested amount is $8,500. This project is anticipated to be completed during the 2021 construction season.

 

N. 40th St. - W. Capitol Dr. to W. Fiebrantz Ave. (ST211210215) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $6,200; Nonassessable Reconstruction Paving Fund  -- $2,000).   The total estimated cost of this project including the requested amount is $8,200. This project is anticipated to be completed during the 2021 construction season.

 

N. 44th St. - W. Burleigh St. to W. Auer Ave. (ST211210213) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $7,800; Nonassessable Reconstruction Paving Fund  -- $2,000).   The total estimated cost of this project including the requested amount is $9,800. This project is anticipated to be completed during the 2021 construction season.

 

N. 48th St. - W. Burleigh St. to W. Auer Ave. (ST211210214) Install traffic calming speed hump(s).(Assessable Reconstruction Paving Fund -- $6,800; Nonassessable Reconstruction Paving Fund  -- $2,000).   The total estimated cost of this project including the requested amount is $8,800. This project is anticipated to be completed during the 2021 construction season.

 

8th Aldermanic District

 

S. 31st St. - W. Lincoln Ave. to W. Grant St. (ST211210169) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $6,800; Nonassessable Reconstruction Paving Fund  -- $1,200).   The total estimated cost of this project including the requested amount is $8,000. This project is anticipated to be completed during the 2021 construction season.

 

S. 33rd St. - W. Hayes Ave. to W. Lincoln Ave. (ST211210229) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $6,200; Nonassessable Reconstruction Paving Fund  -- $1,700).   The total estimated cost of this project including the requested amount is $7,900. This project is anticipated to be completed during the 2021 construction season.

 

9th Aldermanic District

 

N. 57th St. - W. Thurston Ave. to W. Carmen Ave. (ST211210228) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $9,300; Nonassessable Reconstruction Paving Fund  -- $2,200).   The total estimated cost of this project including the requested amount is $11,500. This project is anticipated to be completed during the 2021 construction season.

 

15th Aldermanic District

 

N. Grant Blvd. - W. Hadley St. to W. Locust St. (ST211210191) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $7,900; Nonassessable Reconstruction Paving Fund  -- $2,000).   The total estimated cost of this project including the requested amount is $9,900. This project is anticipated to be completed during the 2021 construction season.

 

W. Vine St. - N. 21st St. to N. 22nd St. (ST211210207) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $3,600; Nonassessable Reconstruction Paving Fund  -- $4,400).   The total estimated cost of this project including the requested amount is $8,000. This project is anticipated to be completed during the 2021 construction season.

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

 

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

 

Further Resolved, That projects: W. Neil Pl. (ST211210188), W. Sheridan Ave.  (ST211210196), N. 15th St. (ST211210189), W. Custer Ave. (ST211210194),

N. 63rd St. (ST211210192), N. 64th St. (ST211210199), N. 72nd St. (ST211210206),

N. 77th St. (ST211210193), N. 79th St. (ST211210216), W. Carmen Ave. (ST211210186), W. Courtland Ave. (ST211150194),W. Florist Ave. (ST211210187), N. 13th St. (ST211210208), N. 16th St. (ST211210209), W. Concordia Ave. (ST211210197), N. Montreal St. (ST211210132), W. Scranton Pl. (ST211180229), N. 39th St. (ST211210210), N. 40th St. (ST211210211), N. 40th St. (ST211210215), N. 44th St. (ST211210213), N. 48th St. (ST211210214), S. 31st St. (ST211210169), S. 33rd St. (ST211210229), N. 57th St. (ST211210228), N. Grant Blvd. (ST211210191), W. Vine St. (ST211210207) will be billed after January 1, 2023, but not before 12 months after the project contract has been completed; and, be it

 

Further Resolved, That the following project: N. 56th St. (ST211180265) be deleted from the 2021 Paving Program:

 

 