7/6/2020 | 0 |
HISTORIC PRESERVATION COMMISSION
| ADOPTED
Minutes note: Mr. Tim Askin said the orange building is in rough shape and the applicant is also working on the open space between the two buildings. A ramp is being proposed as well as a storefront rehabilitation involving the siding, windows and door. Staff worked with them on the details and feels that the applicant has done an excellent job, although there are no pictures of what the building originally looked like. The existing two windows will remain as they are on the second floor. The side windows will be service windows. The deck will be 31 by 7 with two new double-hung windows and translucent roofing, with fascia and trim details. The existing siding will be patched. They are proposing a new bar in back with a gate on the south so the public cannot access it that way. Staff recommends approval with conditions listed in the report.
Chris Socha - architect - happy to answer any questions.
Ms. Peltz congratulated the architect on a fabulous design.
Grant, with staff condition of fascia to the translucent roof. | Pass | 5:0 |
Action details
|
Meeting details
|
Video
|