5/4/2020 | 0 |
HISTORIC PRESERVATION COMMISSION
| PLACED ON FILE
Minutes note: Mr. Tim Askin said the proposal is to add a second floor above the sun porch, which would change the roof line. If this is approved in concept, more formal drawings would be provided. Staff recommends denial.
Chris Hastings - contractor - the location was based upon recommendations from realtors as the owner is adding a master bathroom and walk-in closet to the master bedroom. The existing bathroom is too small. There is no access to the roof.
Staff would support off the back, but the homeowner does not find that a workable option.
| Pass | 5:0 |
Action details
|
Meeting details
|
Not available
|
4/6/2020 | 0 |
HISTORIC PRESERVATION COMMISSION
| HELD IN COMMITTEE
Minutes note: Mr. Tim Askin said the proposal is to add a second story to a sun porch to add a master bathroom. Staff doesn't feel the application drawings are adequate for commission approval and the project does not comport with the district guidelines as it alters roof lines, encloses a porch and is visible from the public right of way. Staff is willing to hold, but not open to approving; feels this project is not approvable on its face. | Pass | 5:0 |
Action details
|
Meeting details
|
Video
|