File #: 191785    Version:
Type: Resolution Status: Passed
File created: 3/3/2020 In control: COMMON COUNCIL
On agenda: Final action: 3/24/2020
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $273,100 for a total estimated cost of these projects being $1,153,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS

 

Number

191785

Version

SUBSTITUTE 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $273,100 for a total estimated cost of these projects being $1,153,000.

Analysis

This substitute resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed.  After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable.  A resolution will be submitted after the Public Hearing authorizing construction.  The City cost for engineering these projects is estimated to be $273,100 with the total cost estimated to be $1,153,000.

Body

Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

 

1st Aldermanic District

N. 44th St. - W. Villard Ave. to W. Custer Ave. (ST211160102)  Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, additional funds).  The total estimated cost for this project including the requested amount is $210,000.  This project is anticipated to be completed during the 2020 construction season.

6th Aldermanic District

E. Nash St. - N. Fratney St. to N. Holton St. (ST211120171) File Number 160261:  Concrete pavement reconstruction, widen the pavement from 24 to 36 feet, construct curb and gutter, replace all of the walk on the north side of the street, install new walk on the south side of the street, construct driveways, remove railroad crossings as necessary, sodding (new 6-foot width of tree border area), and grading.  (Assessable Reconstruction Paving Fund -- $1,100 additional funds; Nonassessable Reconstruction Paving Fund -- $42,000, additional funds).  The total estimated cost for this project including the requested amount is $483,000.  This project was completed in the 2017 construction season and these funds are needed to close out the contract.

7th Aldermanic District

W. Vienna Ave. - N. 35th St. to N. 41st St. (ST211140134) Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund  -- $10,000, additional funds).  The total estimated cost of this project including the requested amount is $260,000.  This project is anticipated to be completed during the 2020 construction season.  

15 th Aldermanic District

N. 23rd St. - W. Wright St. to W. Center St. (ST211190136) Paving the roadway with asphalt.  Laying a concrete curb and gutter.  Laying concrete sidewalk.  Doing all the necessary grading pertaining to said work.  (Nonassessable Reconstruction Paving Fund -- $10,000, additional funds).  The total estimated cost of this project including the requested amount is $210,000.  This project is anticipated to be completed during the 2020 construction season. 

 

City Wide

 

2020 Speed Hump Projects (ST211200111)  Engineering and signage installation for speed humps - Nonassessable Reconstruction Paving Fund -- $200,000.   The total estimated cost of this project including the requested amount is $200,000.  This project is anticipated to be completed during the 2020 construction season. 

 

 

; and, be it

 

Further Resolved, That the abutting and adjacent properties be assessed a portion of the cost, said assessment to be recommended by the Commissioner of Public Works in his report; and, be it

 

Further Resolved, That all assessments and payments be made in accordance with Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That all City departments are authorized to do engineering, surveying, preparing of plans, and estimates of cost thereof, to be utilized in the preparation of said report of the Commissioner of Public Works; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/dl

Apr 9 Sub

03/03/2020