File #: 191655    Version:
Type: Resolution Status: Passed
File created: 2/11/2020 In control: COMMON COUNCIL
On agenda: Final action: 3/3/2020
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $319,800 for a total estimated cost of $332,820.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Signed Letter.pdf, 2. Signed Ad.pdf, 3. Official Notice.pdf
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
3/13/20201 MAYOR SIGNED   Action details Meeting details Not available
3/3/20201 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Video Video
2/20/20201 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Muhammad Ayesh - DPW Samir Amin - DPW 1st Aldermanic District Alley between W. Douglas Ave., W. Kaul Ave., N. 37th St. and N. 38th St. (ST212160106). Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary. Ald. Borkowski moved approval. (Prevailed 5-0) 4th Aldermanic District Alley between W. Juneau Ave., W. McKinley Blvd., N. 31st St. and N. 32nd St. (ST212140114). Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary. Ald. Kovac moved to hold to the call of the chair. (Prevailed 5-0) 5th Aldermanic District Alley between W. Auer Ave., W. Burleigh St., N. 80th St. and N. 81st St. (ST212040101). Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary. Ald. Borkowski moved to hold to the call of the chair. (Prevailed 5-0) N. 105th St. – W. Stark St. to W. Cameron Ave. (ST211180172). Install traffic calming speed hump(s). Ald. Johnson moved approval. (Prevailed 5-0) 6th Aldermanic District N. Booth St. – E. Meinecke Ave. to E. Wright St. (ST211190206). Install traffic calming speed hump(s). Ald. Kovac moved approval. (Prevailed 5-0) N. Vel R. Phillips Ave. – W. North Ave. to W. Meinecke Ave. (ST211190207). Install traffic calming speed hump(s). Ald. Murphy moved approval. (Prevailed 5-0) 15th Aldermanic District Alley between W. Lloyd St., W. North Ave., N. 14th St. and N. 15th St. (ST212010142). Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary. Ald. Johnson moved approval. (Prevailed 5-0) N. 14th St. – W. Lloyd St. to W. North Ave. (ST211190203). Install traffic calming speed hump(s). Ald. Murphy moved approval. (Prevailed 5-0) N. 36th St. – W. Meinecke Ave. to W. Wright St. (ST211190178). Install traffic calming speed hump(s). John Osman - MCP stated the school is in support. Ald. Johnson moved approval. (Prevailed 5-0) N. 38th St. – W. Clarke St. to W. Center St. (ST211190193). Install traffic calming speed hump(s). John Osman - MCP stated the school is in support. Ald. Johnson moved approval. (Prevailed 5-0) Ald. Murphy moved approval as amended. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
2/11/20200 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number

191655

Version

SUBSTITUTE 1

Reference

150229

Sponsor

THE CHAIR

Title

Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $319,800 for a total estimated cost of $332,820.

Analysis

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held.  The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.  The City cost of these projects approved by this resolution is estimated to be $319,800.  The total estimated cost of these projects is $332,800.

Body

Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

 

1st Aldermanic District

 

Alley between W. Douglas Ave., W. Kaul Ave., N. 37th St. and N. 38th St. (ST212160106). File Number 150229: Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary. (Assessable Alley Paving Fund -- $59,000; Nonassessable Alley Paving Fund -- $70,000).  The total estimated cost for this project including the requested amount is $141,000.  This project is anticipated to be completed during the 2020 construction season

 

5 th Aldermanic District

 

N. 105th St. - W. Stark St. to W. Cameron Ave. (ST211180172).   Install traffic calming speed hump(s).  (Assessable Reconstruction Paving Fund -- $6,700; Nonassessable Reconstruction Paving Fund  -- $2,000).   The total estimated cost of this project including the requested amount is $8,700.  This project is anticipated to be completed during the 2020 construction season. 

 

6th Aldermanic District

 

N. Booth St. - E. Meinecke Ave. to E. Wright St. (ST211190206).    IInstall traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $7,000; Nonassessable Reconstruction Paving Fund  -- $2,000).   The total estimated cost of this project including the requested amount is $9,000.  This project is anticipated to be completed during the 2020 construction season. 

 

N. Vel R. Phillips Ave. - W. North Ave. to W. Meinecke Ave. (ST211190207).  Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $6,300; Nonassessable Reconstruction Paving Fund  -- $2,000).   The total estimated cost of this project including the requested amount is $8,300.  This project is anticipated to be completed during the 2020 construction season. 

 

15th Aldermanic District

 

Alley between W. Lloyd St., W. North Ave., N. 14th St. and N. 15th St. (ST212010142).  File Number 991733:  Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary. (Assessable Alley Paving Fund -- $59,000; Nonassessable Alley Paving Fund -- $75,000).  The total estimated cost for this project including the requested amount is $134,000.  This project is anticipated to be completed during the 2020 construction season

 

N. 14th St. - W. Lloyd St. to W. North Ave. (ST211190203). Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $8,000; Nonassessable Reconstruction Paving Fund  -- $4,300).   The total estimated cost of this project including the requested amount is $12,300.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 36th St. - W. Meinecke Ave. to W. Wright St. (ST211190178). Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $7,800; Nonassessable Reconstruction Paving Fund  -- $2,000).   The total estimated cost of this project including the requested amount is $9,800.  This project is anticipated to be completed during the 2020 construction season. 

 

N. 38th St. - W. Clarke St. to W. Center St. (ST211190193). Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $6,700; Nonassessable Reconstruction Paving Fund  -- $2,000).   The total estimated cost of this project including the requested amount is $9,700.  This project is anticipated to be completed during the 2020 construction season. 

 

; and

 

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works’ Report, as amended at said Public Hearing, is approved and the properties therein identified are benefited; and, be it

 

Further Resolved, That said Commissioner of Public Works is authorized and directed to proceed with said work in accordance with said report pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the proper departments take such action as is required of them to assess the abutting or adjacent properties and collect such assessment in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts; and, be it

 

Further Resolved, That the projects do not involve any parcels of agricultural land which are eligible for deferred special assessments under the provisions of Section 14.30 of the Milwaukee City Charter; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That projects Alley between W. Douglas Ave., (ST212160106); N. 105th St. (ST211180172); N. Booth St. (ST211190206); N. Vel R. Phillips Ave. (ST211190207);  N. 14th St.(ST211190203); N. 36th St. (ST211190178); N. 38th St.(ST211190193) will be billed after January 1, 2022, but not before 12 months after the project contract has been completed; and be it

 

Further Resolved,  That project Alley between W. Lloyd St. (ST212010142) will be billed after January 1, 2023, but not before 12 months after the project contract has been completed;

 

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/dl

Afr 8