powered help
header-left header-center header-right
File #: 191007    Version: 0
Type: Resolution Status: Passed
File created: 10/15/2019 In control: COMMON COUNCIL
On agenda: Final action: 11/5/2019
Effective date:    
Title: Resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $30,000 for a total estimated cost of these projects being $800,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Number
191007

Version
ORIGINAL

Sponsor
THE CHAIR

Title
Resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $30,000 for a total estimated cost of these projects being $800,000.

Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction. The City cost for engineering these projects is estimated to be $30,000 with the total cost estimated to be $800,000.

Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

15th Aldermanic District

W. Clarke St. - N. 35th St. to N. Sherman Blvd. (ST211190197) Placing an asphalt overlay on the existing pavement. Removing and replacing all curb and gutter. Removing and replacing concrete sidewalk and driveway approaches where necessary. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $15,000). The total estimated cost of this project including the requested amount is $400,000. This project is anticipated to be completed during the 2021 construction season.

W. Wright St. - N. 35th St. to N. Sherman Blvd. (ST211190198) Placing an asphalt overlay on the existing pavement. Removing and replacing all curb and gutter. Removing and...

Click here for full text