Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $783,000 for a total estimated cost of these projects being $22,985,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS

Number

181383

Version

Substitute 1

Sponsor

THE CHAIR

Title

Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $783,000 for a total estimated cost of these projects being $22,985,000.

Analysis

This resolution authorizes engineering studies on projects which by City Charter are nonassessable.  After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council.  The City cost for engineering these projects is estimated to be $783,000 with the total cost estimated to be $22,985,000.

Body

Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

 

2nd Aldermanic District

 

Sanitary Sewer Lateral Lining in Area Bounded By -- W. Glendale Ave. to W. Congress St. from N. 71st St. to N. 66th St. (SM494180048).  Sanitary Sewer lining.  (Infiltration/Inflow Reduction Fund -- $20,000).  The total estimated cost of this project including the requested amount is $2,159,000.  This project is anticipated to be completed during the 2020 construction season. 

 

5th Aldermanic District

 

W. Burleigh St. (south-side) - N. Menomonee River Pkwy (east) to N. Menomonee River Pkwy (west) (ST210140106) Install asphalt mixed use recreational trail. (non-Assessable New Paving Fund - $5,000). The total estimated cost of the project including the requested amount is $30,000. This project is anticipated to be completed during the 2019 construction season.

 

7th Aldermanic District

 

Sanitary Sewer Lateral Lining in Area Bounded By - W. Capitol Dr. to W. Concordia Ave. from N. Sherman Blvd. to N. 38th St. (SM494180049)  Sanitary Sewer lining. (Infiltration/Inflow Reduction Fund -- $20,000).  The total estimated cost of this project including the requested amount is $4,257,000.  This project is anticipated to be completed during the 2020 construction season. 

 

Sanitary Sewer Lateral Lining in Area Bounded By - W. Congress St. to W. Capitol Dr. from N. Sherman Blvd. to N. 35th St. (SM494180053) Sanitary Sewer lining.  (Infiltration/Inflow Reduction Fund -- $20,000).  The total estimated cost of this project including the requested amount is $3,354,000.  This project is anticipated to be completed during the 2020 construction season. 

 

8th Aldermanic District

 

W. Becher St. - S. 25th St. to S. 29th St. (SM495180096)  Relaying combined sewer.

 (Nonassessable Sewer Maintenance Relay Fund -- $15,000).   The total estimated cost of this project including the requested amount is $454,000.  This project is anticipated to be completed during the 2019 construction season. 

 

S. Layton Blvd. - 200’ +/- north of W. Becher St. to W. Becher St. (SM495180098) Combined sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $10,000).   The total estimated cost of this project including the requested amount is $35,000.  This project is anticipated to be completed during the 2019 construction season. 

 

W. Lincoln Ave. - S. 32nd St. to S. 33rd St. (SM494180051)  Relaying sanitary sewer.(Infiltration/Inflow Reduction Fund -- $12,000).   The total estimated cost of this project including the requested amount is $81,000.  This project is anticipated to be completed during the 2019 construction season. 

 

S. 33rd St. - 230’ north of W. Grant St. to W. Hayes Ave. (SM494180040) Relaying sanitary sewer. (Infiltration/Inflow Reduction Fund -- $15,000).   The total estimated cost of this project including the requested amount is $389,000.  This project is anticipated to be completed during the 2019 construction season. 

 

9th Aldermanic District

 

N. Edgeworth Dr. - 35’ northwest of W. Port Ave. to 140’ northwest of N. 57th St.  (SM494180050) Relaying sanitary sewer (Infiltration/Inflow Reduction Fund -- $12,000).   The total estimated cost of this project including the requested amount is $106,000.  This project is anticipated to be completed during the 2019 construction season. 

 

W. Florist Ave. - N. 55th St. to 400 +/- east of N. 60th St. (SM494180047) Sanitary Sewer lining. (Infiltration/Inflow Reduction Fund -- $10,000).  The total estimated cost of this project including the requested amount is $66,000.  This project is anticipated to be completed during the 2019 construction season. 

 

10th Aldermanic District

 

W. Galena St. - N. 47th St. to N. 48th St. (SM494180046)  Installing new storm sewer.

(Infiltration/Inflow Reduction Fund -- $12,000).   The total estimated cost of this project including the requested amount is $106,000.  This project is anticipated to be completed during the 2019 construction season. 

 

W. Wisconsin Ave. - N. 51st St. to N. 53rd St. (SM495180095)  Installing new storm sewer and Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost of this project including the requested amount is $503,000.  This project is anticipated to be completed during the 2019 construction season. 

 

N. 52nd St. - W. Blue Mound Rd. to W. Wisconsin Ave. (SM495180094) Relaying storm sewer and Relaying combined sewer. (Nonassessable Sewer Maintenance Relay Fund -- $12,000).   The total estimated cost of this project including the requested amount is $250,000.  This project is anticipated to be completed during the 2019 construction season. 

 

N. 75th St. - W. Chambers St. to 190’ +/- south of W. Burleigh St.  (SM494180052)  Relaying sanitary sewer.  (Infiltration/Inflow Reduction Fund -- $12,000).   The total estimated cost of this project including the requested amount is $122,000.  This project is anticipated to be completed during the 2019 construction season. 

 

11th Aldermanic District

 

W. Verona Ct. - Honey Creek Outfall to S. Honey Creek Dr.  (SM499180123) Relaying storm sewer.  (Nonassessable Storm Water Quality Fund -- $12,000).   The total estimated cost of this project including the requested amount is $87,000.  This project is anticipated to be completed during the 2019 construction season. 

 

W. Verona Ct. - S. 69th St. to Honey Creek Outfall (SM499180124) Relaying storm sewer.(Nonassessable Storm Water Quality Fund -- $ 12,000).   The total estimated cost of this project including the requested amount is $78,000.  This project is anticipated to be completed during the 2019 construction season. 

 

12th Aldermanic District

 

S. 19th St. - W. Becher St. to W. Grant St.  (SM495180102)  Relaying combined sewer.

(Nonassessable Sewer Maintenance Relay Fund -- $12,000).   The total estimated cost of this project including the requested amount is $183,000.  This project is anticipated to be completed during the 2019 construction season. 

 

12th and 14th Aldermanic District

 

W. Cleveland Ave. - S. 9th St. to S. 13th St.  (SM494180044) Installing new storm sewer. (Infiltration/Inflow Reduction Fund -- $15,000).   The total estimated cost of this project including the requested amount is $381,000.  This project is anticipated to be completed during the 2020 construction season. 

 

 

S. 10th St. - South Bank of KK River to Chicago and Northwestern/Union Pacific Rail Road (SM494180042) Installing new storm sewer.  (Infiltration/Inflow Reduction Fund -- $15,000).   The total estimated cost of this project including the requested amount is $334,000.  This project is anticipated to be completed during the 2020 construction season. 

 

S. 11th St. - South Bank of KK River to 40+/- south of Cleveland (SM494180041) Installing new storm sewer. (Infiltration/Inflow Reduction Fund -- $12,000).   The total estimated cost of this project including the requested amount is $269,000.  This project is anticipated to be completed during the 2020

construction season. 

 

S. 12th St. - South Bank of KK River to 240 +/-of W. Montana St. (SM494180043) Installing new storm sewer. (Infiltration/Inflow Reduction Fund -- 15,000).   The total estimated cost of this project including the requested amount is $361,000.  This project is anticipated to be completed during the 2020 construction season. 

 

13th Aldermanic District

 

S. Austin St.- E. Bolivar Ave. to E. Van Norman Ave. (SM494180045)  Relaying sanitary sewer. (Infiltration/Inflow Reduction Fund -- $15,000).   The total estimated cost of this project including the requested amount is $307,000.  This project is anticipated to be completed during the 2019 construction season. 

 

14th Aldermanic District

 

W. Oklahoma Ave. - S. 12th St. to S. 15th St. (SM495180097) Relaying combined sewer.  (Nonassessable Sewer Maintenance Relay Fund -- $15,000).  The total estimated cost of this project including the requested amount is $506,000.  This project is anticipated to be completed during the 2020 construction season. 

 

15th Aldermanic District

 

W. Center St. - N. 27th St. to N. 30th St. (SM495180099) Combined sewer lining.

(Nonassessable Sewer Maintenance Relay Fund -- $20,000).   The total estimated cost of this project including the requested amount is $1,225,000.  This project is anticipated to be completed during the 2019 construction season. 

 

W. Medford Ave.  - N. 26th St. to N. 27th St. (SM495180101)  Combined sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $20,000   The total estimated cost of this project including the requested amount is $923,000.  This project is anticipated to be completed during the 2019 construction season. 

 

N. 27th St. - W. Medford Ave. to W. Center St. (SM495180100)  Combined sewer lining. (Nonassessable Sewer Maintenance Relay Fund -- $20,000   The total estimated cost of this project including the requested amount is $1,054,000.  This project is anticipated to be completed during the 2019 construction season.

 

City Wide:

 

Water Alterations - Developer Funded (WT430190300) Alterations.

(Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $72,000).  The total estimated cost of this project including the requested amount is $75,000.  This project is anticipated to be completed during the 2019 construction season. 

 

Work by MWW Prior to Paving (WT410190730) Alterations. (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2019 construction season. 

 

Work Done by Contractor/Paving (WT410190750) Alterations. (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost of this project including the requested amount is $150,000.  This project is anticipated to be completed during the 2019 construction season. 

 

Work Done by Contractor/Sewer Alterations (WT410190770) Alterations. (Nonassessable Water Fund Budget Line 5010 -- $3,000). Nonassessable Water Fund Budget Line 6410 -- $12,000).  The total estimated cost of this project including the requested amount is $100,000.  This project is anticipated to be completed during the 2019 construction season. 

 

Suburban Plan Reviews (WT440190800) Plan Review. (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $47,000).  The total estimated cost of this project including the requested amount is $50,000.  This project is anticipated to be completed during the 2019 construction season. 

 

Material Inspection at Various Locations (WT410190880) Inspection. (Nonassessable Water Fund Budget Line 5010 -- $3,000;Nonassessable Water Fund Budget Line 6410 -- $12,000).  The total estimated cost of this project including the requested amount is $15,000.  This project is anticipated to be completed during the 2019 construction season. 

 

Various Aldermanic Districts

 

Handicap Ramp Work to meet ADA requirements - south side high impact projects. 

(ST216190102) Replace curb and gutter and walk as necessary. (Non-assessable High Impact Streets Fund -- $100,000).  The total estimated cost for this project including the requested amount is $1,025,000.  This project is anticipated to be completed during the 2019 construction season.

 

High impact paving: (ST216190103) W. Fond du Lac Ave. High impact streets asphalt overlay by contract.  (Nonassessable High Impact Streets Fund -- $25,000).  The total estimated cost for this project including the requested amount is $300,000.  This project is anticipated to be completed during the 2019 construction season.

 

High impact paving: (ST216190104) N. 21st St., N. 38th St., N. 45th St. ,N. 46th St., N. 48th St., N. 75th St., W. Cherry St., W. Congress St., W. Glenbrook Rd., W. Hadley St., W. Hawthorne Dr., W. Marine Dr., W. Northridge Lakes Rd. N. Sherman Blvd.  High impact streets asphalt overlay by contract. (Nonassessable High Impact Streets Fund -- $25,000).  The total estimated cost for this project including the requested amount is $1,025,000.  This project is anticipated to be completed during the 2019 construction season.

 

High impact paving: (ST216190105) S. 7th St., S. 9th St., S. 10th St., S. 18th St., S. 56th St., W. Lincoln Ave.  High impact streets asphalt overlay by contract.  (Nonassessable High Impact Streets Fund -- $25,000).  The total estimated cost for this project including the requested amount is $650,000.  This project is anticipated to be completed during the 2019 construction season.

 

High impact paving: (ST216190106) S. 14th St., S. 22nd Pl., S. 54th St., W. Abbott Ave., W. Carpenter Ave., W. Foster Ave., W. Honey Creek Dr., S. Pine Ave., W. Wilbur Ave.  High impact streets asphalt overlay by contract.  (Nonassessable High Impact Streets Fund -- $25,000).  The total estimated cost for this project including the requested amount is $775,000.  This project is anticipated to be completed during the 2019 construction season.

 

High impact paving: (ST216190107) N. 35th St., N. Farwell Ave., N. Holton St., N. Hopkins St., N. Humboldt Blvd., E. Kane Pl., N. Prospect Ave., N. Water St.  High impact streets asphalt overlay by contract.  (Nonassessable High Impact Streets Fund -- $25,000).  The total estimated cost for this project including the requested amount is $1,100,000.  This project is anticipated to be completed during the 2019 construction season.

 

;and, be it

 

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

 

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

 

Further Resolved, That the City Comptroller is authorized to transfer such funds which are available for this purpose to the appropriate capital Project/Grant accounts.

 

Requestor

Infrastructure Services Division

Drafter

Mary Dziewiontkoski/dl

Npr 6 Sub

12/19/2018